| 1 | L1₹43.0 LAccepted-AOC 0 NERTHUA RAEBARELI UTTAR PRADESH 229103 | RAE BARELI | UTTAR PRADESH | 229103 | L1 | Accepted-AOC ACCEPTED BEING L1 | |
| 2 | L2₹46.1 L+₹3.0 L (7.07%)Rejected-Finance | L2 | Rejected-Finance Rejected being not L1 | |
| 3 | Rejected-Technical | - | Rejected-Technical FIRM HAS NOT UPLOADED DOCUMENTS FOR EXPERIENCE OF SIMILAR NATURE WORKS |
Tender Value
₹65 L
EMD Value
₹1.2 L
Closing Date
1 Jul 2024, 6:00 pmClosed
COL S P SINGH
CWE AF LOHEGAON, PUNE - 411032
REMOVAL OF RUBBER AND PAINT DEPOSITS AND APPLICATION OF POLYMER MODIFIED EMULSION (PME) ON RUNWAY SURFACES UNDER GE (AF) LOHEGAON AT 2 WG AIRFORCE STATION PUNE
2024_MES_656494_1
81912/E8
Open Tender
Civil Works
Item Rate
270 days
GE AF LOHEGAON
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
GE AF LOHEGAON
₹1.2 L
Yes
2 Sept 2024
29 May 2024
8 Jul 2024
29 May 2024
1 Jul 2024
19 Jun 2024
Amount
M&L for Removal of paint deposits from runway surface using Water blasting cum vacuuming machine with suitable operating pressure so that the total paint deposits are removed from the runway surfaces (both rigid and flexible) by the method of water blasting cum vacuuming system with suitable water pressure without use of any chemical & without any damage to the existing surface complete all as specified and directed by Engineer in Charge
M&L for Removal of Rubber deposits from runway surface using Water blasting cum vacuuming machine with suitable operating pressure so that the total Rubber deposits are removed from the runway surfaces (both rigid and flexible) by the method of water blasting cum vacuuming system with suitable water pressure without use of any chemical & without any damage to the existing surface complete all as specified and directed by Engineer in Charge Note : Ref PS Clause No 5.1.(iii) for details of equipment
NOTES:(i) The work shall be carried out through authorized & qualified applicator (ii) Total rubber/paint deposit should be removed and the debris / water vacuumed simultaneously leaving no FOD so that the Runway is available for operation immediately. (iii) Rubber/paint deposit debris should be in solid form when finally disposed. (iv) In any emergency condition the machine should exit from the runway in less than 2 mins without leaving FOD. (v) Friction Test should be carried out using portable friction testing machine before & after Rubber deposit removal operation. (vi) After carrying out rubber removal operation on the runway, the friction reading of the rubber/paint removed segment should be minimum 0.55 µ. (vii) The surface of both concrete / bitumen (rigid/flexible) shall not get any kind of damages during the process of rubber removal nor to any adjoining areas, joint filling etc. Damages made if any, shall be made good by the contractor as per the specifications of the Engr - in - charge without any extra cost. (viii) Work will be carried out in phase manner as per availability of runways . (ix) Proper agreement should be done with the owner of the machine.
M&L for Applying evenly one coat of solution of Polymer modified emulsion (PME) of approved make on Bituminous portion of Runway as specified and directed. Note: a) Solution of One Ltrs of diluted solution of Polymer Modified Emulsion (PME) with water in the ratio 1:1 will be applied on the decided place with a maximum coverage area of 1.00 Sqm. b). Application of PME should be done through authorized agency by Mechanical Spraying machine with Spray Nozzle Assembly mounted in 30mm dia carbon Fiber Reinforced Flexible Pipe(CFRP).
M & L for preparation of surface of any description and painting adequate no. of coats of Lines, dashes, arrows, letters etc on Bituminous / Concrete portion of Runway surface, pavements and the like exc 10cm wide with water based road marking paint (white, yellow etc.) of approved make.
M & L for Racking out extg. Joints , width of joints exc 10 mm but n exc. 15 mm wide and depth of joints exc 15 mm but n exc. 25 mm deep of slabs of pavements for removing old damaged sealant from joints cleaning the surfaces by means of air compressor or vacuum cleaner and M&L for joint filling with polyurethene sealant conforming to BS - 5212 (type FB) after applying primer and masking tape on front edge of joints to prevent accidental spillage of sealant on top surfaces and to give a neat finish to the sealant including required back up rod and removing masking tape after sealent has been applied all as specified and as directed at site, all as directed.
M & L for Racking out extg. Joints , width of joints exc 15mm but n exc. 25 mm wide and depth of joints exc 20 mm but n exc. 30 mm deep of slabs of pavements for removing old damaged sealant from joints cleaning the surfaces by means of air compressor or vacuum cleaner and M&L for joint filling with polyurethene sealant conforming to BS - 5212 (type FB) after applying primer and masking tape on front edge of joints to prevent accidental spillage of sealant on top surfaces and to give a neat finish to the sealent, including required back up rod and removing masking tape after sealent has
Note for Ser Item No 1.00 to 6.00: 1) Entire work is to be carried out at day and night as specified and directed by the Engr - in - charge . 2) Machines for Rubber/ Paint removal and PME should be kept at site upto the completion of the contract or as directed by the Engr -in - charge .
tulsani associates
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .