Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical 00 VIDYUT NAGAR MEERANPUR SADDARALI TANDA AMBEDKAR NAGAR UTTAR PRADESH 224238 | AMBEDKAR NAGAR | UTTAR PRADESH | 224238 | Rejected-Technical Due to Non-Submission of Documents as per PQC |
Tender Value
₹25.9 L
EMD Value
₹40,000
Closing Date
15 Jul 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE OMC IV, CTPS, PTPP, Parichha
Office of SE OMC IV, CTPS, PTPP, Parichha
Routine Maintenance, Upkeep and Breakdown Maintenance of 400 /220 KV Switchyard and Associated Equipments and Preventive/Breakdown Maintenance of 6.6kV Motors Ranging from 220KW to 4600KW of 2x250 MW PTPP, Parichha, Jhansi
2023_RVUNL_812985_1
T03/OMCIV/EMD-I/PTPP/23-24
Open Tender
Electrical Works
Lump-sum
365 days
PTPP, PARICHHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Acc. No. 2935002100017509 IFSC PUNB0293500
₹40,000
3 Aug 2023
17 Jun 2023
17 Jul 2023
17 Jun 2023
15 Jul 2023
17 Jun 2023
17 Jun 2023 - 15 Jul 2023
Amount
Removal of Canopy/ Channels/ Grills/ Mesh/ Beam/ Sheet/ Railings of 6.6 KV, 1750 KW I.D. Fan Motor. (Completion Period-06 Hrs.)
Removal of Canopy/ Channels/ Grills/ Mesh/ Beam/ Sheet/ Railings of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion Period-06 Hrs.)
Removal of Canopy/ Channels/ Grills/ Mesh/ Beam/ Sheet/ Railings of 6.6 KV, 550 KW F.D. Fan Motor. (Completion Period-06 Hrs.)
Removal of Canopy/ Channels/ Grills/ Mesh/ Beam/ Sheet/ Railings of 6.6 KV, 450 KW Mill Motor. (Completion Period-04 Hrs.)
Removal of Canopy/ Channels/ Grills/ Mesh/ Beam/ Sheet/ Railings of 6.6 KV, 325 KW C.E.P Motor. (Completion Period-06 Hrs.)
Removal of Canopy/ Channels/ Grills/ Mesh/ Beam/ Sheet/ Railings of 6.6 KV, 220 KW TAC Motor. (Completion Period-06 Hrs.)
Shifting of Motors from one foundation to other foundation within same unit/ Area of 6.6 KV, 4600 KW B.F.P. Motor. (Completion period-08 Hrs.)
Shifting of Motors from one foundation to other foundation within same unit/ Area of 6.6 KV, 1750 KW I.D. Fan Motor. (Completion period-08 Hrs.)
Shifting of Motors from one foundation to other foundation within same unit/ Area of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion period-08 Hrs.)
Shifting of Motors from one foundation to other foundation within same unit/ Area of 6.6 KV, 1500 KW C.W. Pump Motor. (Completion period-06 Hrs.)
Shifting of Motors from one foundation to other foundation within same unit/ Area of 6.6 KV, 550 F.D. Fan Motor. (Completion period-08 Hrs.)
Shifting of Motors from one foundation to other foundation within same unit/ Area of 6.6 KV, 450 KW Mill Motor. (Completion period-06 Hrs.)
Shifting of Motors from one foundation to other foundation within same unit/ Area of 6.6 KV, 325 KW C.E.P. Motor. (Completion period-04 Hrs.)
Shifting of Motors from one foundation to other foundation within same unit/ Area of 6.6 KV, 280 KW Ash water Pump Motor. (Completion period-04 Hrs.)
Shifting of Motors from one foundation to other foundation within same unit/ Area of 6.6 KV, 250 KW A.C.W. Pump Motor. (Completion period-04 Hrs.)
Shifting of Motors from one foundation to other foundation within same unit/ Area of 6.6 KV, 220 KW T.A.C Motor. (Completion period-06 Hrs.)
Shifting of Motors from one foundation of unit#5 to other foundation of Unit#6 or vice versa of 6.6 KV, 4600 KW B.F.P. Motor. (Completion period-12 Hrs.)
Shifting of Motors from one foundation of unit#5 to other foundation of Unit#6 or vice versa of 6.6 KV, 1750 KW I.D. Fan Motor. (Completion period-12 Hrs.)
Shifting of Motors from one foundation of unit#5 to other foundation of Unit#6 or vice versa of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion period-12 Hrs.)
Shifting of Motors from one foundation of unit#5 to other foundation of Unit#6 or vice versa of 6.6 KV, 550 KW F.D. Fan Motor. (Completion period-12 Hrs.)
Shifting of Motors from one foundation of unit#5 to other foundation of Unit#6 or vice versa of 6.6 KV, 450 KW Mill Motor. (Completion period-12 Hrs.)
Shifting of Motors from one foundation of unit#5 to other foundation of Unit#6 or vice versa of 6.6 KV, 325 KW C.E.P. Motor. (Completion period-06 Hrs.)
Shifting of Motors from its foundation to ground or vice versa of 6.6 KV, 1750 KW I.D. Fan Motor. (Completion period-06 Hrs.)
Shifting of Motors from its foundation to ground or vice versa of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion period-06 Hrs.)
Shifting of Motors from its foundation to ground or vice versa of 6.6 KV, 1500 KW C.W. Pump Motor. (Completion period-06 Hrs.)
Shifting of Motors from its foundation to ground or vice versa of 6.6 KV, 550 KW F.D. Fan Motor. (Completion period-06 Hrs.)
Shifting of Motors from its foundation to ground or vice versa of 6.6 KV, 450 KW Mill Motor. (Completion period-06 Hrs.)
Shifting of Motors from its foundation to ground or vice versa of 6.6 KV, 280 KW Ash Water Pump Motor. (Completion period-04 Hrs.)
Shifting of Motors from its foundation to ground or vice versa of 6.6 KV, 250 KW A.C.W. Pump Motor. (Completion period-04 Hrs.)
Shifting of Motors from its foundation to ground or vice versa of 6.6 KV, 220 KW T.A.C Motor. (Completion period-06 Hrs.)
Shifting of Motors from its foundation to TG Hall or vice versa of 6.6 KV, 4600 KW B.F.P. Motor. (Completion period-08 Hrs.)
Shifting of Motors from its foundation to TG Hall or vice versa of 6.6 KV, 1750 KW I.D. Fan Motor. (Completion period-08 Hrs.)
Shifting of Motors from its foundation to TG Hall or vice versa of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion period-08 Hrs.)
Shifting of Motors from its foundation to TG Hall or vice versa of 6.6 KV, 550 KW F.D. Fan Motor. (Completion period-08 Hrs.)
Shifting of Motors from its foundation to TG Hall or vice versa of 6.6 KV, 450 KW Mill Motor. (Completion period-08 Hrs.)
Shifting of Motors from its foundation to TG Hall or vice versa of 6.6 KV, 325 KW C.E.P. Motor. (Completion period-06 Hrs.)
Shifting of Motors from Central store/ Electrical Workshop to TG Hall/ Site or vice versa of 6.6 KV, 4600 KW B.F.P. Motor. (Completion period-06 Hrs.)
Shifting of Motors from Central store/ Electrical Workshop to TG Hall/ Site or vice versa of 6.6 KV, 1750 KW I.D. Fan Motor. (Completion period-06 Hrs.)
Shifting of Motors from Central store/ Electrical Workshop to TG Hall/ Site or vice versa of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion period-06 Hrs.)
Shifting of Motors from Central store/ Electrical Workshop to TG Hall/ Site or vice versa of 6.6 KV, 1500 KW C.W. Pump Motor. (Completion period-06 Hrs.)
Shifting of Motors from Central store/ Electrical Workshop to TG Hall/ Site or vice versa of 6.6 KV, 550 KW F.D. Fan. Motor. (Completion period-06 Hrs.)
Shifting of Motors from Central store/ Electrical Workshop to TG Hall/ Site or vice versa of 6.6 KV, 450 KW Mill. Motor. (Completion period-06 Hrs.)
Shifting of Motors from Central store/ Electrical Workshop to TG Hall/ Site or vice versa of 6.6 KV, 325 KW C.E.P. Motor. (Completion period-06 Hrs.)
Shifting of Motors from Central store/ Electrical Workshop to TG Hall/ Site or vice versa of 6.6 KV, 280 KW Ash water Pump Motor. (Completion period-06 Hrs.)
Shifting of Motors from Central store/ Electrical Workshop to TG Hall/ Site or vice versa of 6.6 KV, 250 KW A.C.W. Pump Motor. (Completion period-06 Hrs.)
Shifting of Motors from Central store/ Electrical Workshop to TG Hall/ Site or vice versa of 6.6 KV, 220 KW T.A.C Motor. (Completion period-06 Hrs.)
Rotation of the motor on its foundation by 90 degrees or restoring Motor on its foundation of 6.6 KV, 1750 KW I.D. Fan Motor. (Completion period-06 Hrs.)
Rotation of the motor on its foundation by 90 degrees or restoring Motor on its foundation of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion period-06 Hrs.)
Rotation of the motor on its foundation by 90 degrees or restoring Motor on its foundation of 6.6 KV, 550 KW F.D. Fan Motor. (Completion period-06 Hrs.)
Rotation of the motor on its foundation by 90 degrees or restoring Motor on its foundation of 6.6 KV, 450 KW Mill Motor. (Completion period-06 Hrs.)
Installation of Canopy/ Channels/ Grills/ Mesh/ Beam/ Sheet/ Railings of 6.6 KV, 1750 KW I.D. Fan Motor. (Completion period-06 Hrs.)
Installation of Canopy/ Channels/ Grills/ Mesh/ Beam/ Sheet/ Railings of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion period-06 Hrs.)
Installation of Canopy/ Channels/ Grills/ Mesh/ Beam/ Sheet/ Railings of 6.6 KV, 550 KW F.D. Fan Motor. (Completion period-06 Hrs.)
Installation of Canopy/ Channels/ Grills/ Mesh/ Beam/ Sheet/ Railings of 6.6 KV, 450 KW Mill Motor. (Completion period-06 Hrs.)
Installation of Canopy/ Channels/ Grills/ Mesh/ Beam/ Sheet/ Railings of 6.6 KV, 325 KW C.E.P. Motor. (Completion period-06 Hrs.)
Installation of Canopy/ Channels/ Grills/ Mesh/ Beam/ Sheet/ Railings of 6.6 KV, 220 KW T.A.C. Motor. (Completion period-06 Hrs.)
Providing suitable Hydra/ Crane for loading and unloading of 6.6 KV Motor at site within 08 Hrs., if Hydra/ Crane is not provided by the department. (Completion period-08 Hrs.)
Providing suitable size trailor for transporting 6.6 KV Motor within project area within 08 Hrs., if suitable truck is not provided by the department. (Completion period-08 Hrs.)
Removal of coupling from rotor shaft of motor of 6.6 KV, 4600 KW B.F.P. Motor. (Completion period-06 Hrs.)
Removal of coupling from rotor shaft of motor of 6.6 KV, 1750 KW I.D. Fan Motor. (Completion period-06 Hrs.)
Removal of coupling from rotor shaft of motor of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion period-06 Hrs.)
Removal of coupling from rotor shaft of motor of 6.6 KV, 1500 KW C.W. Pump Motor. (Completion period-06 Hrs.)
Removal of coupling from rotor shaft of motor of 6.6 KV, 550 KW F.D. Fan Motor. (Completion period-06 Hrs.)
Removal of coupling from rotor shaft of motor of 6.6 KV, 450 KW Mill Motor. (Completion period-06 Hrs.)
Removal of coupling from rotor shaft of motor of 6.6 KV, 325 KW C.E.P. Motor. (Completion period-06 Hrs.)
Removal of coupling from rotor shaft of motor of 6.6 KV, 280 KW Ash water Pump Motor. (Completion period-06 Hrs.)
Removal of coupling from rotor shaft of motor of 6.6 KV, 250 KW A.C.W. Pump Motor. (Completion period-06 Hrs.)
Removal of coupling from rotor shaft of motor of 6.6 KV, 220 KW T.A.C. Motor. (Completion period-06 Hrs.)
Dismantling of Motor as per scope of work of 6.6 KV, 4600 KW B.F.P. Motor. (Completion period-20 Hrs.)
Dismantling of Motor as per scope of work of 6.6 KV, 1750 KW I.D. Fan Motor. (Completion period-16 Hrs.)
Dismantling of Motor as per scope of work of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion period-16 Hrs.)
Dismantling of Motor as per scope of work of 6.6 KV, 1500 KW C.W. Pump Motor. (Completion period-16 Hrs.)
Dismantling of Motor as per scope of work of 6.6 KV, 550 KW F.D. Fan Motor. (Completion period-14 Hrs.)
Dismantling of Motor as per scope of work of 6.6 KV, 450 KW Mill Motor. (Completion period-12 Hrs.)
Dismantling of Motor as per scope of work of 6.6 KV, 325 KW C.E.P. Motor. (Completion period-10 Hrs.)
Dismantling of Motor as per scope of work of 6.6 KV, 280 KW Ash water Pump Motor. (Completion period-10 Hrs.)
Dismantling of Motor as per scope of work of 6.6 KV, 250 KW A.C.W. Pump Motor. (Completion period-10 Hrs.)
Dismantling of Motor as per scope of work of 6.6 KV, 220 KW T.A.C. Motor. (Completion period-10 Hrs.)
Removal of DE/ NDE side bearing of 6.6 KV, 1750 KW I.D. Fan Motor. (Completion period-04 Hrs.)
Removal of DE/ NDE side bearing of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion period-04 Hrs.)
Removal of DE/ NDE side bearing of 6.6 KV, 1500 KW C.W. Pump Motor. (Completion period-04 Hrs.)
Removal of DE/ NDE side bearing of 6.6 KV, 550 KW F.D. Fan Motor. (Completion period-04 Hrs.)
Removal of DE/ NDE side bearing of 6.6 KV, 450 KW Mill Motor. (Completion period-04 Hrs.)
Removal of DE/ NDE side bearing of 6.6 KV, 325 KW C.E.P. Motor. (Completion period-04 Hrs.)
Removal of DE/ NDE side bearing of 6.6 KV, 280 KW Ash water Pump Motor. (Completion period-04 Hrs.)
Removal of DE/ NDE side bearing of 6.6 KV, 250 KW A.C.W. Pump Motor. (Completion period-04 Hrs.)
Removal of DE/ NDE side bearing of 6.6 KV, 220 KW T.A.C. Motor. (Completion period-04 Hrs.)
Installation of DE/ NDE side bearing of 6.6 KV,1750 KW I.D. Fan Motor. (Completion period-04 Hrs.)
Installation of DE/ NDE side bearing of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion period-04 Hrs.)
Installation of DE/ NDE side bearing of 6.6 KV, 1500 KW C.W. Pump Motor. (Completion period-04 Hrs.)
Installation of DE/ NDE side bearing of 6.6 KV, 550 KW F.D. Fan Motor. (Completion period-04 Hrs.)
Installation of DE/ NDE side bearing of 6.6 KV, 450 KW Mill Motor. (Completion period-04 Hrs.)
Installation of DE/ NDE side bearing of 6.6 KV, 325 KW C.E.P. Motor. (Completion period-04 Hrs.)
Installation of DE/ NDE side bearing of 6.6 KV, 280 KW Ash water Pump Motor. (Completion period-04 Hrs.)
Installation of DE/ NDE side bearing of 6.6 KV, 250 KW A.C.W. Pump Motor. (Completion period-04 Hrs.)
Installation of DE/ NDE side bearing of 6.6 KV, 220 KW T.A.C. Motor. (Completion period-04 Hrs.)
Assembling of Motor as per scope of work of 6.6 KV, 4600 KW B.F.P. Motor. (Completion period-24 Hrs.)
Assembling of Motor as per scope of work of 6.6 KV,1750 KW I.D. Fan Motor. (Completion period-20 Hrs.)
Assembling of Motor as per scope of work of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion period-20 Hrs.)
Assembling of Motor as per scope of work of 6.6 KV, 1500 KW C.W. Pump Motor. (Completion period-20 Hrs.)
Assembling of Motor as per scope of work of 6.6 KV, 550 KW F.D. Fan Motor. (Completion period-18 Hrs.)
Assembling of Motor as per scope of work of 6.6 KV, 450 KW Mill Motor. (Completion period-18 Hrs.)
Assembling of Motor as per scope of work of 6.6 KV, 325 KW C.E.P. Motor. (Completion period-16 Hrs.)
Assembling of Motor as per scope of work of 6.6 KV, 280 KW Ash water Pump Motor. (Completion period-14 Hrs.)
Assembling of Motor as per scope of work of 6.6 KV, 250 KW A.C.W. Pump Motor. (Completion period-14 Hrs.)
Assembling of Motor as per scope of work of 6.6 KV, 220 KW T.A.C. Motor. (Completion period-14 Hrs.)
Installation of coupling on the shaft of rotor of 6.6 KV, 4600 KW B.F.P. Motor. (Completion period-06 Hrs.)
Installation of coupling on the shaft of rotor of 6.6 KV, 1750 KW I.D. Fan Motor. (Completion period-06 Hrs.)
Installation of coupling on the shaft of rotor of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion period-06 Hrs.)
Installation of coupling on the shaft of rotor of 6.6 KV, 1500 KW C.W. Pump Motor. (Completion period-06 Hrs.)
Installation of coupling on the shaft of rotor of 6.6 KV, 550 KW F.D. Fan Motor. (Completion period-06 Hrs.)
Installation of coupling on the shaft of rotor of 6.6 KV, 450 KW Mill Motor. (Completion period-06 Hrs.)
Installation of coupling on the shaft of rotor of 6.6 KV, 325 KW C.E.P. Motor. (Completion period-06 Hrs.)
Installation of coupling on the shaft of rotor of 6.6 KV, 280 KW Ash water Pump Motor. (Completion period-06 Hrs.)
Installation of coupling on the shaft of rotor of 6.6 KV, 250 KW A.C.W. Pump Motor. (Completion period-06 Hrs.)
Installation of coupling on the shaft of rotor of 6.6 KV, 220 KW T.A.C. Motor. (Completion period-06 Hrs.)
Fabrication & supply of grease plate, grease flinger, spring & circlip etc. as per sample of 6.6 KV, 1750 KW I.D. Fan Motor. (Completion period-07 days.)
Fabrication & supply of grease plate, grease flinger, spring & circlip etc. as per sample of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion period-07 days.)
Fabrication & supply of grease plate, grease flinger, spring & circlip etc. as per sample of 6.6 KV, 1500 KW C.W. Pump Motor. (Completion period-07 days.)
Fabrication & supply of grease plate, grease flinger, spring & circlip etc. as per sample of 6.6 KV, 550 KW F.D. Fan Motor. (Completion period-07 days.)
Fabrication & supply of grease plate, grease flinger, spring & circlip etc. as per sample of 6.6 KV, 450 KW Mill Motor. (Completion period-07 days.)
Fabrication & supply of grease plate, grease flinger, spring & circlip etc. as per sample of 6.6 KV, 325 KW C.E.P. Motor. (Completion period-07 days.)
Fabrication & supply of grease plate, grease flinger, spring & circlip etc. as per sample of 6.6 KV, 280 KW Ash water Pump Motor. (Completion period-07 days.)
Fabrication & supply of grease plate, grease flinger, spring & circlip etc. as per sample of 6.6 KV, 250 KW A.C.W. Pump Motor. (Completion period-07 days.)
Fabrication & supply of grease plate, grease flinger, spring & circlip etc. as per sample of 6.6 KV, 220 KW T.A.C. Motor. (Completion period-07 days.)
Fabrication & supply of DE and NDE side grease pipes as per sample of 6.6 KV, 1750 KW I.D. Fan Motor. (Completion period-07 days.)
Fabrication & supply of DE and NDE side grease pipes as per sample of 6.6 KV, 1650 KW P.A. Fan Motor. (Completion period-07 days.)
Fabrication & supply of DE and NDE side grease pipes as per sample of 6.6 KV, 1500 KW C.W. Pump Motor. (Completion period-07 days.)
Fabrication & supply of DE and NDE side grease pipes as per sample of 6.6 KV, 550 KW F.D. Fan Motor. (Completion period-07 days.)
Fabrication & supply of DE and NDE side grease pipes as per sample of 6.6 KV, 450 KW Mill Motor. (Completion period-07 days.)
Fabrication & supply of DE and NDE side grease pipes as per sample of 6.6 KV, 325 KW C.E.P. Motor. (Completion period-07 days.)
Fabrication & supply of DE and NDE side grease pipes as per sample of 6.6 KV, 280 KW Ash water Pump Motor. (Completion period-07 days.)
Fabrication & supply of DE and NDE side grease pipes as per sample of 6.6 KV, 250 KW A.C.W. Pump Motor. (Completion period-07 days.)
Fabrication & supply of DE and NDE side grease pipes as per sample of 6.6 KV, 220 KW T.A.C. Motor. (Completion period-07 days.)
Machining work in motor side coupling as per scope of work of 6.6 KV, 250 KW A.C.W. Pump Motor. (Completion period-04 days.)
Routine Maintenance & upkeep of 400 /220 KV Switchyard & associated Equipments of 2x250 MW PTEP, Parichha, Jhansi as per scope of work from Sl. No. A to G of Part-I & from Sl. No. A to D of Part-II
Installation of one complete pole of 400/220 KV CB along with associated work
Dismantling of one complete pole of 400/220 KV CB along with associated work
Replacement of interrupter unit of one pole of 400/220 KV CB
Only Dismantling OR only installation of interrupter unit of one pole of 400/220 KV CB.
Only Dismantling OR only installation of one arm of one pole of HCB Isolator of 400/220 KV
Replacement of one arm of one pole of HCB isolator of 400/220 KV.
Dismantling OR installation of 400 KV Pantograph isolator – one pole.
Replacement of 400 KV Pantograph isolator - one pole.
Replacement of trapeze assembly
To provide assistance in overhauling of one pole of 400 KV or 220 KV CB & its other associated works
Replacement of wave trap of one phase
Overhauling or replacement of gear operating mechanism of 220 KV HCB isolator (gang operated) OR one pole of HCB/Pantograph isolator of 400 KV system
Replacement of damaged P.G. clamp or jumper of 400 KV system
Replacement of damaged P.G. clamp or jumper of 220 KV system
Replacement of Male or Female contacts of one pole of 400 KV HCB Isolator
Replacement of Male or Female contacts of one pole of 220 KV HCB Isolator
Erection and Dismantling of Scaffolding in 220/400 KV switchyard per pole.
Installation of one No. H.T. bushing or its gasket or its bushing C.T. in 400/220 KV transformers including all associated works - 400 KV side
Installation of one No. H.T. bushing or its gasket or its bushing C.T. in 400/220 KV transformers including all associated works - 220 KV side
Installation of Neutral bushing
Replacement of HV or LV turret or Gasket
Replacement of PRV of ICT/ Reactor
Installation of one Radiator bank of ICT / Reactor
Centrifuging of 315 MVA ICT/125 MVAR Reactor for one day
Replacement of one Buchholz relay of ICT/Reactor/ Transformer
Shifting of one centrifuging machine of 10KL/6 KL capacity from transformer yard to switchyard
Shifting of one 10 KL capacity oil tank
Modification of base of LA/CT/CVT of 400 KV or 220 KV system & necessary connection modification of jumper (excluding removal/installation of LA/CT/CVT)
Replacement of 400KV line side dropping conductor with associated work.
Replacement of 220KV line side dropping conductor with associated work.
Replacement & installation of 4 inch or 3 inch aluminum pipe conductor.
Replacement & installation of 400KV or 220 KV side CT/CVT/LA OR ISOLATOR dropping conductor with associated work.
Replacement & installation of 400KV or 220 KV side insulator string with associated hardware.
Replacement of damaged CT/CVT/LA of one pole of 400/220 KV system by new similar equipment.
Shifting of 400KV or 220KV Breaker/bushing/current transformer or CVT from central store to switchyard /Shifting of damaged equipment from 400/220 KV switchyard to any assigned site inside the plant
Tightness of clamp and conductor connection at One Clamp of 400/220 KV CT or 400/220 KV Isolator
Tightness of clamp and conductor connection at One clamp of 400 KV CVT
Tightness of clamp and conductor connection at One clamp of 400/220 KV LA
Tightness of clamp and conductor connection at One clamp of 400/220 KV Circuit Breaker
Proper cleaning and painting inside and outside fencing of 400 & 220 KV switchyard and transformer yard
Proper cleaning and painting of various electrical equipments in switchyard and transformer yard as per scope of work
Overhauling of dewatering pump installed in 400 KV Switchyard with associated work.
Shifting of new transformer oil filled drums from central store/ any site within plant to transformer yard/ shifting of old transformer oil filled drum from site to CSD store or at the assigned site.
Shifting of empty transformer oil drums from Site to CSD store.
M/S NOSAD CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .