Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹2.0 L
Closing Date
30 Jan 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
65 days
Expenditure
Capital (Works)
Above/Below/Par
TELECOMM
18 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Bid Capacity to be submittted as per Clause No. 10.3 of Second Sheet of Annexure-I of Part-I of this Tender Document.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
(b) (i) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender.
Note for b(i): Separate completed works of minimum required values for 1.1.1 each component shall also be considered for fulfillment of technical eligibility criteria.
Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of opening of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Defination of Similar Work :- Any work of supply, installation, testing & commissioning of IP based CCTV system/IP based networking system.
42 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
GST Registration details should be attached
Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/ Integrated Goods and Services Tax Act, 2017(IGST)/ Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST) also, as notified by Central/State Govt & as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates.
The successful tenderer who is liable to be registered under GST/IGST/ UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/ UTGST/ SGST Act to railway immediately after the award of contract, without which no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority.
In case the successful tenderer is not liable to be registered under GST/IGST/UTGST/ SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
Every tenderer shall state in the tender his postal address fully and clearly. Any communication sent in time to the tenderer by post at the said address shall be deemed to have reached the tender duly and in time. Important documents shall be sent by Registered post.
The provision of Construction and Demolition Waste Management Rule 2016 issued by Ministry of Environment Forest and Climate Change dated 29.03.2016 and published in the Gazette of India, Part - II, Section -3, Subsection (ii) are binding upon the Contractor. Contractor shall implement these provisions at worksites, for which no extra payment will be payable.
Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the Standard General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer
The Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the railway there under.
The following documents should be submitted by the tenderer on issue of LOA and before signing Contract Agreement:-.
The documents pertaining to Deployment of Qualified Engineers at Work Sites by the Contractor.
EPF & ESI Registration certificate should be submitted before signing of Contract Agreement.
Price variation clause (PVC) shall be applicable only in tender having advertised value above Rs. 2 crore provided further that, in the tender document PVC is applicable.
All the Terms and Conditions in this contract is as per Indian Railways Standard General Conditions of Contract updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents
If the tenderer(s) expire(s) after the submission of his / their tender or after the acceptance of his / their offer, the Railway shall deem such tender cancelled. If a partner of a firm expires after the submission of their tender or after the acceptance of their tender, the Railway shall deem such tender as cancelled, unless the firm retains its character.
Contractor is to abide by the provisions of Payment of Wages act & Minimum Wages act in terms of clause 54 and 55 of Indian Railways General Condition of Contract. In order to ensure the same, an application has been developed and hosted on website 'www.shramikkalyan.indianrailways. gov. in'. Contractor shall register his firm/company etc. and upload requisite details of labour and their payment in this portal. These details shall be available in public domain. The Registration / updation of Portal shall be done as under:-
Contractor shall apply for onetime registration of his company/firm etc. in the Shramikkalyan portal with requisite details subsequent to issue of Letter of Acceptance. Engineer shall approve the contractor's registration in the portal within 7 days of receipt of such request.
Contractor once approved by any Engineer, can create password with login ID(PAN No.) for subsequent use of portal for all Letter of Acceptances (LoAs) issued in his favour.
The contractor once registered on the portal, shall provide details of his Letter of Acceptances (LoAs) / Contract Agreements on shramikkalyan portal within 15 days of issue of any LoA for approval of concerned Engineer. Engineer shall update (if required) and approve the details of LoA filled by contractor within 7 days of receipt of such request.
After approval of LoA by Engineer, contractor shall fill the salient details of contract labours engaged in the contract and ensure updating of each wage payment to them on shramikkalyan portal on monthly basis.
It shall be mandatory upon the contractor to ensure correct and prompt uploading of all salient details of engaged contractual labour & payments made thereof after each wage period.
While processing payment of any 'On Account Bill' or 'Final Bill' or release of 'Advances' or 'Performance Guarantee / Security deposit', contractor shall submit a certificate to the Engineer or Engineer's representatives that "I have uploaded the correct details of contract labours engaged in connection with this contract and payments made to them during the wage period in Railway's Shramikkalyan portal at 'www.shramikkalyan. indianrailways.gov.in' till Month, Year."
Provision of CCTV coverage at yard covering mainline points and crossings of A&B category station ( Dimapur, Hojai, Haibargaon) at Lumding Division
SNT-31-LMG-2025-26~NFR
SNT-31-LMG-2025-26
Open
Works - General
180 Days
Hojai, Assam
₹0
₹2.0 L
30 Jan 2026
8 Jan 2026
16 Jan 2026
60 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,06,45,377.96 | ||
| — | 24.00 | — | — | ||
| Supply, Installation, Testing and commissioning of Full HD bullet type IP colour camera along with housing and mount and all accessories required for installation purposes along with 128 GB SD/SDHC/SDXC Memory card or higher as per Technical Specification | — | — | — | 5,50,796.88 | |
| — | 12.00 | — | — | ||
| Supply, Installation, Testing and commissioning of Type-I (Field Switch) switches and all accessories required for their installation as per TS | — | — | — | 2,24,302.2 | |
| — | 24.00 | — | — | ||
| Supply of SFP -BX (10KM) Single Fibre as per TS | — | — | — | 41,699.76 | |
| — | 1500.00 | — | — | ||
| Supply of STP CAT-6 cable and all the accessories required for installation as per TS | — | — | — | 74,535 | |
| — | 24.00 | — | — | ||
| Supply of STP Cat 6e Armoured Patch cord cable (3 meter) . | — | — | — | 4,022.88 | |
| — | 24.00 | — | — | ||
| Supply of OFC Patch chord (10 m)duplex to connect SFP modules of the type SC-SC / SC-LC /SC-APC asper site requirement as per TS | — | — | — | 34,643.76 | |
| — | 48.00 | — | — | ||
| Supply of RJ-45 connector (10/100 based T with gold plated pins) as per TS | — | — | — | 396 | |
| — | 12000.00 | — | — | ||
| Supply of 12 Core metal strengthened outdoor armoured optic fibre cable (ITU-TG- 652-D) and all the accessories required for installation as per clause TS | — | — | — | 2,14,800 | |
| — | 12.00 | — | — | ||
| Supply of 12 Fiber FMS (SC-APC Type) and all accessories required for installation as per TS | — | — | — | 1,62,932.52 | |
| — | 12000.00 | — | — | ||
| Supply of Power Cable 3 Core, (4 Sqmm) | — | — | — | 16,64,400 | |
| — | 12.00 | — | — | ||
| Supply of Power Board as per technical specification. with 3 nos. of 6 Amp switch cum socket and ON/OFF switch in each board along with indication of power ON, along with power cord 3 Mtr length as per TS | — | — | — | 5,910 | |
| — | 12.00 | — | — | ||
| Supply of 10 Amps MCB with Box | — | — | — | 5,268 | |
| — | 24.00 | — | — | ||
| Supply and installation of 6Mtr pole with foundation as per TS | — | — | — | 4,28,335.2 | |
| — | 12000.00 | — | — | ||
| Supply of 40 mm dia. HDPE pipe with accessories on wall or structure/ in Trench/HDD etc. along with all accessories required for fixing, clamping, cutting as per TS | — | — | — | 19,38,240 | |
| — | 1500.00 | — | — | ||
| — | — | — | 40,800 | ||
| of casing Capping wire through materials are to be | : - Fixing Communication/power/STP/Fiber etc. All fitting | — | and drawing pipe and fixing | ||
| — | 7500.00 | — | — | ||
| Excavation of cable trench 300mm wide 1.2 metre deep and refilling trench & ramming after laying of cable. | — | — | — | 4,14,525 | |
| — | 1200.00 | — | — | ||
| Cable crossing road/track through HDPE pipe of 90/76 mm diameter as per TS | — | — | — | 2,29,896 | |
| — | 2700.00 | — | — | ||
| Horizontal Drilling at a approximately depth of 1.2 m below the formation level of the earth including insertion of HDPE pipes along with couplings etc. | — | — | — | 30,66,768 | |
| — | 12000.00 | — | — | ||
| LAYING: Laying PLB HDPEpipe size 40/33 mm or 50/42mm of OFC cable asper TS | — | — | — | 29,040 | |
| — | 12000.00 | — | — | ||
| LAYING: Pulling of OFC with Nylon rope through HDPE pipes & GI pipes of size50/42mm or 40/33 mm dia for 24/48F fibre armoured OFC cable in Normal Trench asper technical specification detailed in tender document. | — | — | — | 51,600 | |
| — | 600.00 | — | — | ||
| Cutting of plat form with tiles/stone cutting machine or manually to 30 CM depth and 30 cm width approximately for Laying & drawing of communication cable and power cable along with PLB pipe inside the common trench. .(including cutting of tiles neatly by removing slabs/tiles if any. Refilling the trench with river sand replacing the top surface with smooth finished by appropriate concreate slab/tiles as per site condition. All the materials to be supplied by contractor. | — | — | — | 1,79,016 | |
| — | 24.00 | — | — | ||
| Supply, Installation Testing and commissioning of GUI software, VMS, VRS software as per RDSO/SPN/TC/2021 ver 6.0 Amdt 1, 2, & 3 or latest. | — | — | — | 58,752 | |
| — | 24.00 | — | — | ||
| Supply, Installation Testing and commissioning of GUI software VAS server software as per RDSO/SPN/TC/2021 ver 6.0 Amdt 1,2, & 3 or latest. | — | — | — | 64,584 | |
| — | 24.00 | — | — | ||
| Supply installation testing and commissioning of additional storage for additional camera in Yards | — | — | — | 1,33,392 | |
| — | 12.00 | — | — | ||
| Supply of Apparatus Case(Large) as per RDSO Drg.No. RDSO/S-11500 or latest fitted with key lock (E-Type)with Key of ward No.11 conforming to specification IRS:S/30 and Drg. No. S3376/M & S 3377/M or latest. | — | — | — | 2,49,671.88 | |
| — | 12.00 | — | — | ||
| Excavation, ramming, Casting Cement Concrete foundation for Apparatus cases/Location boxes in the ratio of 1:3:6 Aggregate not exceeding 3 : 8 cum, as per Drg. No.-LB1- LD-TYP-NR No.MT/L-45 SH No.LB1 (for Apparatus Case full size) and Drg.No.-LB2-LD-TYP-NR No.MT/L- 45 SH No.LB2 (for Apparatus Case half size) using standard size galvanized Anchor bolts & nuts (also referred to as foundation bolts) conforming to IRS Drg. No. SA-116A/M, for erection of Apparatus cases/Location boxes, plastering with 1 : 4 cement - sand mixture all the surfaces up to75 mm below ground level, complete with contractor's material including cement, sand, stones, anchor bolts and nuts and curing of casted foundation, refilling & ramming of loose soil around foundation and disposal of loose dug soil from site. | — | — | — | 50,368.56 | |
| — | 12.00 | — | — | ||
| Installation of Apparatus cases/Location Boxes on CC foundation on grouted bolts, including filling the spacemen closed below the location box with contractor's sand, as per technical specifications. | — | — | — | 15,110.52 | |
| — | 12.00 | — | — | ||
| Supply of Earthing and installation of a ring earth suitable for S&T installation as per RDSO specification No.RDSO/SPN/197/2016 with the latest amendment as per TS | — | — | — | 5,61,571.8 | |
| — | 3.00 | — | — | ||
| Installation testing, commissioning and integration with existing VSS work of N.F. Railway. | — | — | — | 1,50,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TDSNT-31-25-26.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .