| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹7.1 L (5.11%)Admitted-Finance | ₹1.5 Cr+₹7.1 L (5.11%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M. MURUGADHAS L2 | JOSEPH BENEDICT L1 |
|---|---|---|---|---|---|
| 1.00Strenthening of Pallavilai karikulam via kurusady road (plastic road Ch 0/0 - 1/0) ( R-168) | |||||
| 2.00Clearing the scrub jungle with uprooting and including all cuttings and deposting of the products,removing from the site, disposal by burrying or burning etc., complete including all incidental charges as directed by the departmental officers. As per SSRB 301,302 Most 201 | |||||
| 3.00 | KM 0/0-1/0 | 612 | sqm | 5.41 ₹3,310.92 | 5.14 ₹3,145.68 Lowest |
| 4.00Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A | |||||
| 5.00 | KM 0/0-0/780 | 102 | cum | 118.81 ₹12,118.62 | 113.04 ₹11,530.08 Lowest |
| 6.00Picking the existing mettalled BT surface up to 50-100mm deep etc, including all labour charges etc., complete complying with standard specifications and as directed | |||||
| 7.00 | KM 0/0-1/0 | 1,000 | sqm | 19.79 ₹19,790 | 18.83 ₹18,830 Lowest |
| 8.00Providing 75mm consolidated thickness WBM for top layer using 1 cum of grade III metal of 2.5% of 63mm, 20%of 53 mm, 72.5% of 45mm and 2.5% of 22.4mm ,2.5% of 11.2mm IRC size HBG metal 0.24 cum of gravel whose PI values is less than '6' for blindage and filler for 10 sqm. area (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) including cost and conveyeance of all materials from approved quarries to road side and stacking of materials to departmental standard metic gauge for pre - measurements including labour for laying,spreading new metal,hand packing to camber gravel blinding, watering with all leads fro good water even if the season is worst drought forming edge bunds and consolidation by 8 to 10 tone power roller and finishing to the total thickness with lines grades and cross sections as specified in the departmental specifications including hire charges for all T&P fuel cost and other running charges for power roller and other tools and plants employed and all other incidental charges etc., complete. SSRB 203-05,203-03,502 MOST 401,402. | |||||
| 9.00 | KM 0/0-0/780 | 141.97 | cum | 2,588.5 ₹3,67,489.35 | 2,462.77 ₹3,49,639.46 Lowest |
| 10.00Applying tack coat over WBM surface using 4Kg of bituminous emulsion per 10sqm including cost of bituminous emulsion which will be supplied departmentallly at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handing charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire fuel and running charges for all tools and plants employed for the work including all other charges such as barricading and providing danger lights flags etc., complete. | |||||
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
14 Jun 2023, 3:00 pmClosed
Project Director DRDA
DRDA Collectorate Kanniyakumari
Strengthening and 5 year Maintainence of 5 road work in Package No 13 in Kurunthencode Block under Mudhalvarin Grama Salaigal Membattu Thitam (MGSMT) 2022-23
2023_RDTN_316218_1
A4/638/2023(13) dated 15.05.2023
Open Tender
Civil Works - Roads
Item Wise
180 days
Kurunthencode Block area
As per Technical Bid
3 documents required · 3 mandatory
₹0
₹1.4 L
DRDA Collectorate Kanniyakumari
11 Jul 2023
17 May 2023
14 Jun 2023
17 May 2023
14 Jun 2023
17 May 2023
17 May 2023
Amount
Strenthening of Pallavilai karikulam via kurusady road (plastic road Ch 0/0 - 1/0) ( R-168)
Clearing the scrub jungle with uprooting and including all cuttings and deposting of the products,removing from the site, disposal by burrying or burning etc., complete including all incidental charges as directed by the departmental officers. As per SSRB 301,302 Most 201
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A
Picking the existing mettalled BT surface up to 50-100mm deep etc, including all labour charges etc., complete complying with standard specifications and as directed
Providing 75mm consolidated thickness WBM for top layer using 1 cum of grade III metal of 2.5% of 63mm, 20%of 53 mm, 72.5% of 45mm and 2.5% of 22.4mm ,2.5% of 11.2mm IRC size HBG metal 0.24 cum of gravel whose PI values is less than '6' for blindage and filler for 10 sqm. area (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) including cost and conveyeance of all materials from approved quarries to road side and stacking of materials to departmental standard metic gauge for pre - measurements including labour for laying,spreading new metal,hand packing to camber gravel blinding, watering with all leads fro good water even if the season is worst drought forming edge bunds and consolidation by 8 to 10 tone power roller and finishing to the total thickness with lines grades and cross sections as specified in the departmental specifications including hire charges for all T&P fuel cost and other running charges for power roller and other tools and plants employed and all other incidental charges etc., complete. SSRB 203-05,203-03,502 MOST 401,402.
Applying tack coat over WBM surface using 4Kg of bituminous emulsion per 10sqm including cost of bituminous emulsion which will be supplied departmentallly at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handing charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire fuel and running charges for all tools and plants employed for the work including all other charges such as barricading and providing danger lights flags etc., complete.
Providing and Laying Gravel Soling to compacted thickness including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
90 cm Equilateral triangle cautionary signboard
60 cm Equilateral triangle cautionary signboard
60 cm Circle(MANDATORY SIGN)
Chevron signs 90 cm Octogon(Curves)
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Road Marker/ Road stud with lens Reflector
Name Board cum Citizen Board
Sub Estimate for Hardbed
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Sub Estimate for Retaining Wall
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Plastering with cement mortor 1:5,12mm thick over the cement concrete for floor finish including curing etc. complete complying with standard spectifications and as direct by the departmental officers
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Strenthening of Muttom PHC to orphanage road R- 153 (cc road Ch 0/0 - 0/320)
Picking the existing mettalled BT surface up to 50-100mm deep etc, including all labour charges etc., complete complying with standard specifications and as directed
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
90 cm Equilateral triangle cautionary signboard
60 cm Equilateral triangle cautionary signboard
60 cm Circle(MANDATORY SIGN)
Chevron signs 90 cm Octogon(Curves)
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Road Marker/ Road stud with lens Reflector
Name Board cum Citizen Board
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Strenthening of James nager keezhatheru road ( cc road - Ch0/0 - 0/400)
Picking the existing mettalled BT surface up to 50-100mm deep etc, including all labour charges etc., complete complying with standard specifications and as directed
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
90 cm Equilateral triangle cautionary signboard
60 cm Equilateral triangle cautionary signboard
60 cm Circle(MANDATORY SIGN)
Chevron signs 90 cm Octogon(Curves)
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Road Marker/ Road stud with lens Reflector
Name Board cum Citizen Board
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Strenthening of Unnankulam Manavilai road (plastic road ch 0/0-1/9)
Clearing the scrub jungle with uprooting and including all cuttings and deposting of the products,removing from the site, disposal by burrying or burning etc., complete including all incidental charges as directed by the departmental officers. As per SSRB 301,302 Most 201
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A
Picking the existing mettalled BT surface up to 50-100mm deep etc, including all labour charges etc., complete complying with standard specifications and as directed
Providing 75mm consolidated thickness WBM for top layer using 1 cum of grade III metal of 2.5% of 63mm, 20%of 53 mm, 72.5% of 45mm and 2.5% of 22.4mm ,2.5% of 11.2mm IRC size HBG metal 0.24 cum of gravel whose PI values is less than '6' for blindage and filler for 10 sqm. area (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) including cost and conveyeance of all materials from approved quarries to road side and stacking of materials to departmental standard metic gauge for pre - measurements including labour for laying,spreading new metal,hand packing to camber gravel blinding, watering with all leads fro good water even if the season is worst drought forming edge bunds and consolidation by 8 to 10 tone power roller and finishing to the total thickness with lines grades and cross sections as specified in the departmental specifications including hire charges for all T&P fuel cost and other running charges for power roller and other tools and plants employed and all other incidental charges etc., complete. SSRB 203-05,203-03,502 MOST 401,402.
Applying tack coat over WBM surface using 4Kg of bituminous emulsion per 10sqm including cost of bituminous emulsion which will be supplied departmentallly at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handing charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire fuel and running charges for all tools and plants employed for the work including all other charges such as barricading and providing danger lights flags etc., complete.
Providing and Laying Gravel Soling to compacted thickness including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Supply and fixing of KILOMETER STONE (three faces two lines dressed) of size 1.65 x 0.45 x 0.15m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc. complete
90 cm Equilateral triangle cautionary signboard
60 cm Equilateral triangle cautionary signboard
60 cm Circle(MANDATORY SIGN)
Chevron signs 90 cm Octogon(Curves)
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Road Marker/ Road stud with lens Reflector
Name Board cum Citizen Board
Sub Estimate for Hardbed
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Sub Estimate for Retaining Wall
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Plastering with cement mortor 1:5,12mm thick over the cement concrete for floor finish including curing etc. complete complying with standard spectifications and as direct by the departmental officers
Sub Estimate for Culvert
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. (Bed Lock and Slab )
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Plastering with cement mortor 1:3,12mm thick over the cement concrete for floor finish including curing etc. complete complying with standard spectifications and as direct by the departmental officers
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Strenthening of Oduparai sasthankoil valliyar road (Plastic road ch 0/0 - 0/300)
Clearing the scrub jungle with uprooting and including all cuttings and deposting of the products,removing from the site, disposal by burrying or burning etc., complete including all incidental charges as directed by the departmental officers. As per SSRB 301,302 Most 201
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A
Picking the existing mettalled BT surface up to 50-100mm deep etc, including all labour charges etc., complete complying with standard specifications and as directed
Providing 75mm consolidated thickness WBM for top layer using 1 cum of grade III metal of 2.5% of 63mm, 20%of 53 mm, 72.5% of 45mm and 2.5% of 22.4mm ,2.5% of 11.2mm IRC size HBG metal 0.24 cum of gravel whose PI values is less than '6' for blindage and filler for 10 sqm. area (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) including cost and conveyeance of all materials from approved quarries to road side and stacking of materials to departmental standard metic gauge for pre - measurements including labour for laying,spreading new metal,hand packing to camber gravel blinding, watering with all leads fro good water even if the season is worst drought forming edge bunds and consolidation by 8 to 10 tone power roller and finishing to the total thickness with lines grades and cross sections as specified in the departmental specifications including hire charges for all T&P fuel cost and other running charges for power roller and other tools and plants employed and all other incidental charges etc., complete. SSRB 203-05,203-03,502 MOST 401,402.
Applying tack coat over WBM surface using 4Kg of bituminous emulsion per 10sqm including cost of bituminous emulsion which will be supplied departmentallly at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handing charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire fuel and running charges for all tools and plants employed for the work including all other charges such as barricading and providing danger lights flags etc., complete.
Providing and Laying Gravel Soling to compacted thickness including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
90 cm Equilateral triangle cautionary signboard
60 cm Equilateral triangle cautionary signboard
60 cm Circle(MANDATORY SIGN)
Chevron signs 90 cm Octogon(Curves)
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Road Marker/ Road stud with lens Reflector
Name Board cum Citizen Board
Sub Estimate for Hardbed
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Sub Estimate for Retaining Wall
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Plastering with cement mortor 1:5,12mm thick over the cement concrete for floor finish including curing etc. complete complying with standard spectifications and as direct by the departmental officers
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M. MURUGADHAS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .