PROJECT DIRECTOR DRDA MADURAI
DRDA MADURAI -20
RETENDER RENOVATION OF SCHOOL BUILDING KITCHEN SHED IN MADURAI WEST BLOCK IN MADURAI DISTRICT. PACKAGE NO 05 UNDER RCSIDS 2020_21
2021_RDTN_207417_1
D4/2141/2020/RCSIDRT/MW05
Open Tender
Civil Works
Item Rate
60 days
Madurai west
REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹0
₹10,000
15 Jun 2022
7 Aug 2021
24 Aug 2021
7 Aug 2021
24 Aug 2021
10 Aug 2021
Amount
Chipping of concrete & Roughening the surface including all charges etc. complete
Dismantling and clearing away carefully the existing damaged one course of pressed tiles roof finish in CM including all cost
Terrace flooring with one coarce of( 30 % new and 70 % old ) machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same morter, including cost and conveyance of all materials to site and labour for mixing , laying, curing etc., complete.
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly including cost and conveyance of all materials to site and labour for mixing , laying, curing etc., complete.
Painting two coats with oil bound Distemper over one coat of Primier (using White Cement as primer ) in all floors including brushes etc ., complete.
Painting one coat with exterior Emulsion over old wall surface without primer including cost and conveyance of all materials to site and all labour charges etc.,complete.
Painting two coats with synthetic enamel paint over old steel surface including cost conveyance of all materials and all lobour charges etc .,complete.
Painting two coats with black oxide over old black board surface including all cost and conveyance of all materials and all labour charges etc., complete
Provision for Electrification arrangement Fan point
Provision for Electrification arrangement Tube light
Provision for Electrification arrangement Ceiling fan
Chipping of Concrete & Roughening the surface including all charges etc. complete
Dismantling and Clearing away carefully the existing damaged one course of pressed tile roof finish in cement morter including all charges etc.complete
Terrace flooring with one cource of 30% new and 70% old machine pressed tiles cm 1:3 mix with water proofing compound and the joints pointed wirh same mortar inculding cost and conveyance of all materials to site labour charges etc.complete.
Floor finish with granolithic flooring in CC 1:2:4 mix using 10 to 12mm chips including cost and conveyance of all materials to site and all labours etc., complete. complying with standard specifications.
Painting two coats with oil bond Distemper over old wall surface without primer including cost and conveyance of all materials to site and all labour charges etc.,complete.
Painting one coat with exterior Emulsion over old wall surface without primer including cost and conveyance of all materials to site and all labour charges etc.,complete.
Painting two coats with synthetic enamel paint over old steel surface including cost conveyance of all materials and all lobour charges etc .,complete.
Chipping of concrete & Roughening the surface including all charges etc. complete
Dismantling and clearing away carefully the existing damaged one course of pressed tiles roof finish in CM including all cost
Removing the damaged wooden Door including all charges etc . , complete
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters including cost and conveyance of all materials to site and labour for mixing , laying, curing etc., complete.
Terrace flooring with one coarce of 100 % new machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same morter, including cost and conveyance of all materials to site and labour for mixing , laying, curing etc., complete.
Terrace flooring with one coarce of( 40 % new and 60 % old ) machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same morter, including cost and conveyance of all materials to site and labour for mixing , laying, curing etc., complete.
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly including cost and conveyance of all materials to site and labour for mixing , laying, curing etc., complete.
Cost and supply of MS Door of size 1.05 x 1.85 m including all charges etc., complete
Labour charges for fixing of MS door including all charges etc., complette
Painting two coats with oil bound Distemper over one coat of Primier (using White Cement as primer ) in all floors including brushes etc ., complete.
Painting one coat with exterior Emulsion over old wall surface without primer including cost and conveyance of all materials to site and all labour charges etc.,complete.
Painting two coats with synthetic enamel paint over new steel surface including cost conveyance of all materials and all lobour charges etc .,complete.
Painting two coats with synthetic enamel paint over old steel surface including cost conveyance of all materials and all lobour charges etc .,complete.
Painting two coats with black oxide over old black board surface including all cost and conveyance of all materials and all labour charges etc., complete
Dismantling and clearing away carefully the existing damaged one course of pressed tiles roof finish in CM including all cost
Terrace flooring with one coarce of( 30 % new and 70 % old ) machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same morter, including cost and conveyance of all materials to site and labour for mixing , laying, curing etc., complete.
Pointing with Cm 1:3 mix to 20 mm thick RR masonry including all cost and conveyance
Painting two coats with oil bound Distemper over one coat of Primier (using White Cement as primer ) in all floors including brushes etc ., complete.
Painting one coat with exterior Emulsion over old wall surface without primer including cost and conveyance of all materials to site and all labour charges etc.,complete.
Painting two coats with synthetic enamel paint over old steel surface including cost conveyance of all materials and all lobour charges etc .,complete.
Painting two coats with black oxide over old black board surface including all cost and conveyance of all materials and all labour charges etc., complete
Provision for Electrification arrangementincluding all cost Fan point
Provision for Electrification arrangementincluding all cost Tube light
Provision for Electrification arrangementincluding all cost Ceiling fan
Removing the mangalore tiles roof with out timber including all charges etc . , complete
Removing the damaged wooden Door & window including all charges etc . , complete
Chipping of concrete & Roughening the surface including all charges etc. complete
Cost and supply of mangalore roof tiles class AA etc., complete
Cost and supply of mangalore Ridge tiles class AA etc., complete
Re roofing using old available and new Mangalore tiles & Ridge tiles with lime mortar binder packing including all cost and conveyance of all material and all labour charges etc., complete
Cost and supply of MS Door of size 1.00 x 2.00 m including all charges etc., complete
Cost and supply of MS Window of size 1.00 x 1.40 m including all charges etc., complete
Labour charges for fixing of MS door including all charges etc., complette
Labour charges for fixing of MS Window including all charges etc., complette
Painting two coats with oil bound Distemper over one coat of Primier (using White Cement as primer ) in all floors including brushes etc ., complete.
Painting one coat with exterior Emulsion over old wall surface without primer including cost and conveyance of all materials to site and all labour charges etc.,complete.
Painting two coats with synthetic enamel paint over new steel surface including cost conveyance of all materials and all lobour charges etc .,complete.
Painting two coats with synthetic enamel paint over old steel surface including cost conveyance of all materials and all lobour charges etc .,complete.
Painting two coats with black oxide over old black board surface including all cost and conveyance of all materials and all labour charges etc., complete
Chipping of Concrete & Roughening the surface including all charges etc. complete
Dismantling and Clearing away carefully the existing damaged one course of pressed tile roof finish in cement morter including all charges etc.complete
Terrace flooring with one cource of 30% new and 70% old machine pressed tiles cm 1:3 mix with water proofing compound and the joints pointed wirh same mortar inculding cost and conveyance of all materials to site labour charges etc.complete.
Floor finish with granolithic flooring in CC 1:2:4 mix using 10 to 12mm chips including cost and conveyance of all materials to site and all labours etc., complete. complying with standard specifications.
Painting two coats with oil bond Distemper over old wall surface without primer including cost and conveyance of all materials to site and all labour charges etc.,complete.
Painting one coat with exterior Emulsion over old wall surface without primer including cost and conveyance of all materials to site and all labour charges etc.,complete.
Painting two coats with synthetic enamel paint over old steel surface including cost conveyance of all materials and all lobour charges etc .,complete.
Chipping of concrete & Roughening the surface including all charges etc. complete
Dismantling and clearing away carefully the existing damaged one course of pressed tiles roof finish in CM including all cost
Terrace flooring with one coarce of( 30 % new and 70 % old ) machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same morter, including cost and conveyance of all materials to site and labour for mixing , laying, curing etc., complete.
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly including cost and conveyance of all materials to site and labour for mixing , laying, curing etc., complete.
Painting two coats with oil bound Distemper over one coat of Primier (using White Cement as primer ) in all floors including brushes etc ., complete.
Painting one coat with exterior Emulsion over old wall surface without primer including cost and conveyance of all materials to site and all labour charges etc.,complete.
Painting two coats with synthetic enamel paint over old steel surface including cost conveyance of all materials and all lobour charges etc .,complete.
Painting two coats with black oxide over old black board surface including all cost and conveyance of all materials and all labour charges etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S P V CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .