| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC NO 87 NEW BALAJI NAGAR ATTIPATTU CHENNAI 600 120 | CHENNAI | CHENNAI | TAMIL NADU | 600120 | ₹8.2 L Quoted ₹7.9 L | L1 | Accepted-AOC accepted |
| 2 | L2₹8.3 LRejected-AOC | ₹8.3 L | L2 | Rejected-AOC rejected |
| 3 | L3₹13.8 LRejected-Finance | ₹13.8 L | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | A.R.C.ENGINEERING L1 | KRAM ELECTRICAL WORKS L2 | ASIA POWER ELECTRICAL PVT LTD L3 |
|---|---|---|---|---|---|---|
| 1.00 | Complete Overhauling of 3500KW/ 6.6 KV Boiler Feed Pump MOTOR (1B)
Removal of end covers and measuring the air gap and magnetic axis | 1 | No | 2,758 ₹2,758 | 2,889 ₹2,889 | 3,000 ₹3,000 |
| 2.00 | Removal of water line pipes, cooler assembly and lifting the cooler unit to a convenient location. | 1 | No | 5,597 ₹5,597 | 5,864 ₹5,864 | 7,500 ₹7,500 |
| 3.00 | Removal of sleeve bearings, resting the rotor on the stator after placing rubber sheet. | 1 | No | 12,830 ₹12,830 | 13,441 ₹13,441 | 15,000 ₹15,000 |
| 4.00 | Removal of foundation bolts,Lifting the motor to a convenient location. | 1 | No | 12,830 ₹12,830 | 13,441 ₹13,441 | 15,000 ₹15,000 |
| 5.00 | Overhaul of stator : Inspection and cleaning and checking of stator windings, fastening of the stator winding to the end ring and also the inter coil spacers and packing in the overhang portion of the windings, tightening the wedges, spraying one coat of Dr.Beck protective enamel varnish, Drying out the stator, preheating, Checking the IR value, DC resistance and Tan delta.packing in the overhang portion of the windings, tightening the wedges, spraying one coat of Dr.Beck protective enamel varnish, Drying out the stator, preheating, Checking the IR value, DC resistance and Tan delta. | 1 | No | 72,644 ₹72,644 | 76,103 ₹76,103 | 75,000 ₹75,000 |
| 6.00 | Overhaul of rotor :Inspection and cleaning of released rotor, checking the position of stampings, cleaning of corroded parts, inspection of winding bars, cleaning of overheated and burnt places, applying one coat of Dr.Beck’s insulating varnish and drying out. | 1 | No | 18,510 ₹18,510 | 19,391 ₹19,391 | 19,000 ₹19,000 |
| 7.00 | Cleaning the cooler tubes, checking the coolers by hydraulic testing, reconditioning of cooler flanges, replacement of gasket etc, | 1 | No | 39,640 ₹39,640 | 41,527 ₹41,527 | 45,000 ₹45,000 |
| 8.00 | Checking the bearing and preparation of bearing surface and blue matching the housing. | 1 | No | 15,486 ₹15,486 | 16,224 ₹16,224 | 18,000 ₹18,000 |
| 9.00 | Lifting and Erection of the motor back on its bed after cleaning and checking healthiness of pedestal insulation. | 1 | No | 12,830 ₹12,830 | 13,441 ₹13,441 | 15,000 ₹15,000 |
| 10.00 | Assembling of sleeve bearings, Checking the interference between the bearings and housing, checking the clearance between shaft and bearing. | 1 | No | 12,830 ₹12,830 | 13,441 ₹13,441 | 15,000 ₹15,000 |
Tender Value
Refer Docs
EMD Value
₹8,600
Closing Date
5 Jul 2025, 2:00 pmClosed
SE/ES/NCTPS-I
Superintending Engineer Electrical System NCTPS I Chennai 120
NCTPS I ES Circle EM I Dn SDn IV Annual over hauling of HT LT Motors at Unit I during the year 2025 26
2025_EB_572740_1
CE/NCTPS-I/SE/ES/WC-05/2025-26
Open Tender
Power/Energy Projects/Products
360 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,600
Yes
15 Apr 2026
23 Jun 2025
7 Jul 2025
23 Jun 2025
5 Jul 2025
23 Jun 2025
Amount
Complete Overhauling of 3500KW/ 6.6 KV Boiler Feed Pump MOTOR (1B) Removal of end covers and measuring the air gap and magnetic axis
Removal of water line pipes, cooler assembly and lifting the cooler unit to a convenient location.
Removal of sleeve bearings, resting the rotor on the stator after placing rubber sheet.
Removal of foundation bolts,Lifting the motor to a convenient location.
Overhaul of stator : Inspection and cleaning and checking of stator windings, fastening of the stator winding to the end ring and also the inter coil spacers and packing in the overhang portion of the windings, tightening the wedges, spraying one coat of Dr.Beck protective enamel varnish, Drying out the stator, preheating, Checking the IR value, DC resistance and Tan delta.packing in the overhang portion of the windings, tightening the wedges, spraying one coat of Dr.Beck protective enamel varnish, Drying out the stator, preheating, Checking the IR value, DC resistance and Tan delta.
Overhaul of rotor :Inspection and cleaning of released rotor, checking the position of stampings, cleaning of corroded parts, inspection of winding bars, cleaning of overheated and burnt places, applying one coat of Dr.Beck’s insulating varnish and drying out.
Cleaning the cooler tubes, checking the coolers by hydraulic testing, reconditioning of cooler flanges, replacement of gasket etc,
Checking the bearing and preparation of bearing surface and blue matching the housing.
Lifting and Erection of the motor back on its bed after cleaning and checking healthiness of pedestal insulation.
Assembling of sleeve bearings, Checking the interference between the bearings and housing, checking the clearance between shaft and bearing.
Assembling the end covers, checking air gap and magnetic axis.
Lifting the cooler assembly ,fixing with motor and connecting the water line pipes, etc.,
Tightening the bed bolts, foundation bolts, Checking the IR value, DC resistance and trial run the motor in decouple/couple condition running the motor satisfactorily.
Machining of Oil Catcher of Boiler Feed Pump motor
Overhauling of LT Motors Overhauling of Auxiliary Oil Pump (MOT) Motor-1A (100 kW)
Labour required for Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces on DE & NDE sides,checking of bearings housings, providing sleeves in the end covers on DE & NDE (optional)
Brazing of new terminal leads from winding, its terminal works (Optional).
Overhauling of Auxiliary cooling water pump motor - 1B & 1C (110 KW LT Motor)
Labour required for Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces on DE & NDE sides,checking of bearings housings, providing sleeves in the end covers on DE & NDE (optional)
Brazing of new terminal leads from winding (Optional).
Overhauling of Sea water booster pump motor - 1B & 1C ( 55 KW LT Motor)
Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
Brazing of new terminal leads from winding, its termination works and provision of New Terminal Block for 3 phase, 415 V, 55KW Sea Water Booster Pump motor (Optional).
Overhauling of Ash water supply pump motor-1A (37 KW)
Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
Brazing of new terminal leads from winding, its termination works and provision of New Terminal Block for 3 phase, 415 V, 37KW Ash Water Booster Pump motor (Optional).
Overhauling of Instrument air compressor motor- 1C (150KW)
Labour required for Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces on DE & NDE sides,checking of bearings housings, providing sleeves in the end covers on DE & NDE (optional)
Brazing of new terminal leads from winding, its termination works (150 KW Instrument Air Compressor motor) (Optional).
Charges for overhauling of Service air compressor motor- 1A (150KW)
Labour required for Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces on DE & NDE sides,checking of bearings housings, providing sleeves in the end covers on DE & NDE (optional)
Brazing of new terminal leads from winding, its termination works (150 KW Service Air Compressor motor) (Optional).
Overhauling of Vacuum pump motor -1B (93 KW)
Labour required for Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces on DE & NDE sides, checking of bearings housings, providing sleeves in the end covers on DE & NDE (optional)
Brazing of new terminal leads from winding, its terminal works (Optional).
Overhauling of Stator water pump motor - 1A (9.3KW)
Metal filling ,machining and repairing of worn out shafts/bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
Overhauling of AC seal oil pump motor (5.5KW)
Metal filling ,machining and repairing of worn out shafts/bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
Overhauling of Auxiliary Oil Pump (BFP) Motor-1B (5.5 KW)
Metal filling ,machining and repairing of worn out shafts/bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
Overhauling of On line Tube Cleaning motor-1A (5.5 KW)
Metal filling ,machining and repairing of worn out shafts/bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
Overhauling of Jack oil pump motor-1B (30KW)
Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
Overhauling of Debris Flushing Pump Motor -1B (11KW)
Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
Overhauling of Phosphate dosing pump Motor -1A (3.7KW)
Metal filling ,machining and repairing of worn out shafts/bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
Overhauling of Hydrazine dosing pump Motor -1B (0.75 KW)
Metal filling ,machining and repairing of worn out shafts/bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
Overhauling of Stator water Vacuum pump Motor-1B (2.2 KW)
Metal filling ,machining and repairing of worn out shafts/bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
Overhauling of Generator Seal Oil Vapour Extraction Fan Motor-1B (1.5 KW)
Metal filling ,machining and repairing of worn out shafts/bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
Overhauling of Gland Steam Exhaust Fan Motor-1B (2.2 KW)
Metal filling ,machining and repairing of worn out shafts/bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
Overhauling of Recirculation Pump motor of Vacuum Pump -1B (1.5 KW)
Metal filling ,machining and repairing of worn out shafts/bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
Overhauling of Seal Oil Vacuum Pump motor (0.18 KW)
6318 C3 (for 100 KW DE & NDE Side) Make:NTN Imported; Cage: Steel
N321 (for 150 KW DE Side) Make:NTN Imported; Cage: Brass
6318 (for 150 KW NDE Side) Make:NTN Imported; Cage: Steel
6319 C3 (for 110KW NDE Side) Make: NTN Imported; Cage: Steel
NU 218 C3 (for 93 KW DE Side) Make:NTN Imported; Cage: Brass
6218 C3 (for 93 KW NDE Side) Make:NTN Imported; Cage: Steel
NU 319 (for 110 KW DE Side) Make: FAG; Cage: Brass
6215 C3(for 55KW & 37KW NDE Side) Make:NTN Imported; Cage: Steel
NU 215 (for 55KW & 37KW DE Side) Make:NTN Imported; Cage: Brass
Consumable & T&P
KRAM ELECTRICAL WORKS (BID ID -1392341)
ASIA POWER ELECTRICAL PVT LTD (BID ID -1392578)
stage.html
html • 0.04 MB
techsummary_684344.pdf
BOQ Comparative Chart
xlsx
finsummary_684344.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_684344.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid