Construction of Community shed Fabricated at Jagti near Jagdamba mandir, Ward No.2, Pyt. Jagti, Block Nagrota under scheme MPLADs for the year 2025-26 2nd Call
2026_RDPR_311127_1
eNIT 52 REWJ of 2026-27 dated 29-05-2026
Open Tender
Civil Works
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
MH0515
₹49,540
29 May 2026
29 May 2026
6 Jun 2026
29 May 2026
5 Jun 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge | 39.68 | cum | 256.85 | ₹10,191.81 | BI01010001010000000000000515BI0100001113 |
| 2 | Providing and laying 1:5:10 cement concrete with 40mm agg. | 2.56 | cum | 4,826.5 | ₹12,355.84 | BI01010001010000000000000515BI0100001114 |
| 3 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 15.12 | cum | 9,395.7 | ₹1,42,062.98 | BI01010001010000000000000515BI0100001115 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level @90kg per cum | 1,360 | kgs | 123.2 | ₹1,67,552 | BI01010001010000000000000515BI0100001116 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 52.8 | sqm | 286.35 | ₹15,119.28 | BI01010001010000000000000515BI0100001117 |
| 6 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Riveted and bolted ( * Shed size: 21 m × 19 m
* Truss span: 21.0 m
* Truss spacing: 4.5 m c/c
* No. of trusses: 5
* Foundation type: Embedded steel column in RCC) @2.75 KG/SQFT | 11,806 | kgs | 142.9 | ₹16,87,077.4 | BI01010001010000000000000515BI0100001118 |
| 7 | Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
0.50 mm thick with zinc coating not less than 275 gram/m2 | 437 | sqm | 852 | ₹3,72,324 | BI01010001010000000000000515BI0100001119 |
| 8 | Providing ridge 60cm in width plain G.S sheets 0.50 mm thick with zinc coating not less than 275 gram/m2 | 19 | rmt | 761.95 | ₹14,477.05 | BI01010001010000000000000515BI0100001120 |
| 9 | Carriage of key construction material from source to site of work by Mechanical Transport A) Sand 5 km MT | 7.68 | cum | 200.74 | ₹1,541.68 | BI01010001010000000000000515BI0100001121 |
| 10 | Carriage of key construction material from source to site of work by Mechanical Transport B) Aggregate 5 km MT | 12.85 | cum | 200.74 | ₹2,579.51 | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
BOQ_1007401.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid