Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹3.7 L MOEI, Replacement of lamps and tubes, FAS, EPABX and RMO pump set and DG Set at Grand Hotel Shimla (H.P.). | MOEI, Replacement of lamps and tubes, FAS, EPABX and RMO pump set and DG Set at Grand Hotel Shimla (H.P.). | L1 | |
| 2 | L2₹4.2 L+₹43,606.68 (11.6%) MOEI, Replacement of lamps and tubes, FAS, EPABX and RMO pump set and DG Set at Grand Hotel Shimla (H.P.). | MOEI, Replacement of lamps and tubes, FAS, EPABX and RMO pump set and DG Set at Grand Hotel Shimla (H.P.). | L2 | |
| 3 | - | - |
| Sl No | Description | Qty | Unit | M/S. COMFORT ZONE L1 | Rakesh Sharma Electrical works L2 |
|---|---|---|---|---|---|
| 1 | Electrical Work | - | - | -22.15 ₹3,74,699.84 Lowest | -13.09 ₹4,18,306.52 |
Tender Value
₹4.8 L
EMD Value
₹9,626
Closing Date
25 Nov 2025, 3:00 pmClosed
AE-E-2
Pankaj Kumar Sahu
Shimla Central Electrical Sub-Division-II
MOEI, Replacement of lamps and tubes, FAS, EPABX and RMO pump set and DG Set at Grand Hotel Shimla (H.P.). Subwork/Packages: SH:- Repair / replacement of Pillar Heater, Geyser installed in Rooms of Grand Hotel.
133563
141/EE(E)/SCED/2025-26/SD-2
OPEN
Electrical Works
NCB
5 months
Shimla, Himachal Pradesh
11 documents required · 11 mandatory
₹9,626
Not Applicable
25 Nov 2025
18 Nov 2025
25 Nov 2025
25 Nov 2025
25 Nov 2025
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT025.pdf
document • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .