| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.1 LAdmitted-Finance PASUMALAITHANGAL GINGEE VILUPPURAM | ₹37.1 L | L1 | Admitted-Finance |
| 2 | L2₹37.2 L+₹9,690 (0.26%)Admitted-Finance | ₹37.2 L+₹9,690 (0.26%) | L2 | Admitted-Finance |
| 3 | L3₹40.6 L+₹3.4 L (9.29%)Admitted-Finance COIMBATORE | ₹40.6 L+₹3.4 L (9.29%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Evaluation Rejected |
| Sl No | Description | Qty | Unit | R SELVARAJ L1 | S RAJATHI L3 | M. DHANDAPANI L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift - 1 m3. | 35 | m3 | 200 ₹7,000 | 220 ₹7,700 | 180 ₹6,300 Lowest |
| 1.01 | Narrow Foundations - Second Depth 2m - 3m | 135 | m3 | 200 ₹27,000 Lowest | 230 ₹31,050 | 200 ₹27,000 Lowest |
| 2.00 | Plain cement concrete 1:4:8 mix (One cement four M.Sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying,consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 1 m3. | 23 | m3 | 5,500 ₹1,26,500 Lowest | 5,500 ₹1,26,500 Lowest | 5,500 ₹1,26,500 Lowest |
| 4.00 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design including cost of steel and binding wire and all labour charges for cutting, bending & tying etc., complying with standard specifications - 1 Quintal | 69 | m3 | 9,000 ₹6,21,000 | 9,000 ₹6,21,000 | 8,650 ₹5,96,850 Lowest |
| 5.00Supplying and erecting for shuttering, including necessary supports for plane surface in foundation and basement for RCC column footings, Plinth beams, staircase steps, etc., using mild steel sheets of size 90cm x 60cm and 10gauge, stiffened with mild steel angle of size 25mm x 25mm x 3mm for boarding, supported by silver oak joists of size 10 x6.5cm, spaced at about 90cm centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete, complying with standard specifications and as directed etc., complete - 1 m2 | ||||||
| 6.00 | (a) Plinth Beams and footings sides | 46 | m3 | 330 ₹15,180 Lowest | 350 ₹16,100 | 340 ₹15,640 |
| 7.00 | (a)columnns | 155 | m3 | 1,200 ₹1,86,000 Lowest | 1,400 ₹2,17,000 | 1,300 ₹2,01,500 |
| 8.00 | (b)beams and slabs | 230 | m3 | 1,000 ₹2,30,000 Lowest | 1,180 ₹2,71,400 | 1,000 ₹2,30,000 Lowest |
| 9.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works but including curing etc.,complete wherever necessary as directed by departmental officer etc., complete. | 77 | m3 | 9,000 ₹6,93,000 Lowest | 9,800 ₹7,54,600 | 9,200 ₹7,08,400 |
| 10.00 | Filling with basement with Well gravel in layers well rammed, watered and consolidated, complying with standard specification etc., complete. | 61 | m3 | 450 ₹27,450 | 500 ₹30,500 | 420 ₹25,620 Lowest |
Tender Value
₹50 L
EMD Value
₹50,000
Closing Date
8 Sept 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Public Distribution shop at Hudco Colony 8th street in ward No.68, Central zone.
2026_MAWS_694693_10
E56/2026-Two Cover-CZ
Open Tender
Civil Works
Works
150 days
Coimbatore city municipal corporation, Townhall
As per tender conditions
5 documents required · 5 mandatory
₹0
₹50,000
18 Sept 2026
17 Aug 2026
8 Sept 2026
17 Aug 2026
8 Sept 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift - 1 m3. | 35 | m3 | - | - |
| 1.01 | Narrow Foundations - Second Depth 2m - 3m | 135 | m3 | - | - |
| 2 | Plain cement concrete 1:4:8 mix (One cement four M.Sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying,consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 1 m3. | 23 | m3 | - | - |
| 4 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design including cost of steel and binding wire and all labour charges for cutting, bending & tying etc., complying with standard specifications - 1 Quintal | 69 | m3 | - | - |
| 5Supplying and erecting for shuttering, including necessary supports for plane surface in foundation and basement for RCC column footings, Plinth beams, staircase steps, etc., using mild steel sheets of size 90cm x 60cm and 10gauge, stiffened with mild steel angle of size 25mm x 25mm x 3mm for boarding, supported by silver oak joists of size 10 x6.5cm, spaced at about 90cm centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete, complying with standard specifications and as directed etc., complete - 1 m2 | |||||
| 6 | (a) Plinth Beams and footings sides | 46 | m3 | - | - |
| 7 | (a)columnns | 155 | m3 | - | - |
| 8 | (b)beams and slabs | 230 | m3 | - | - |
| 9 | Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works but including curing etc.,complete wherever necessary as directed by departmental officer etc., complete. | 77 | m3 | - | - |
| 10 | Filling with basement with Well gravel in layers well rammed, watered and consolidated, complying with standard specification etc., complete. | 61 | m3 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
Twocovrdocument.pdf
Tender Documents • 0.94 MB
ITB.pdf
Additional Documents • 0.19 MB
BOQ_835311.xls
BOQ • 0.33 MB
Extensionnnnnn.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .