| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.0 LAdmitted-Finance 0 DHANA TEJA BARARI DHANA TEJA MATHURA MATHURA UTTAR PRADESH 281005 UDYAM UP 54 0007790 | MATHURA | UTTAR PRADESH | 281005 | ₹53.0 L | L1 | Admitted-Finance |
| 2 | L2₹62.7 LAdmitted-Finance | ₹62.7 L | L2 | Admitted-Finance |
| 3 | L3₹74.1 LAdmitted-Finance | ₹74.1 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Eligible for part 1 |
| Sl No | Description | Qty | Unit | M/s Shukla Enterprises L3 | M/s S.K. Construction L1 | S V V ELECTRO ENGINEERING PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00Part - A ( Material) Following Material Supplied by the Contractor:- | ||||||
| 1.01 | Bracing Angle with Clamp | 13 | Nos. | 3,160 ₹41,080 | 2,000 ₹26,000 | 2,850 ₹37,050 |
| 1.02 | Pin Insulator | 150 | Nos. | 270 ₹40,500 | 200 ₹30,000 | 205 ₹30,750 |
| 1.03 | X- Arm | 36 | Nos. | 745 ₹26,820 | 1,000 ₹36,000 | 835 ₹30,060 |
| 1.04 | X-Arm holding clamp for PCC Pole | 36 | Nos. | 305 ₹10,980 | 100 ₹3,600 | 205 ₹7,380 |
| 1.05 | F- Clamp | 36 | Nos. | 266 ₹9,576 | 200 ₹7,200 | 205 ₹7,380 |
| 1.06 | Clamp for TOP/Dropper/angle for PCC Pole | 84 | Nos. | 260 ₹21,840 | 200 ₹16,800 | 205 ₹17,220 |
| 1.07 | Disc Insulator | 15 | Nos. | 415 ₹6,225 | 200 ₹3,000 | 680 ₹10,200 |
| 1.08 | Top Channel | 28 | Nos. | 835 ₹23,380 | 200 ₹5,600 | 1,150 ₹32,200 |
| 1.09 | Aluminum lug 120 sqmm | 70 | Nos. | 35 ₹2,450 | 200 ₹14,000 | 15 ₹1,050 |
Tender Value
₹71.3 L
EMD Value
₹71,500
Closing Date
19 Dec 2025, 5:00 pmClosed
SE, EDC Ayodhya
Electricity Distribution Circle, civil lines, Ayodhya.
37 H(F)(W)/2025-26
2025_MVVNL_1053084_3
37 H(F)(W)/2025-26
Open Tender
Electrical Works
90 days
Ayodhay
As per NIT
2 documents required · 2 mandatory
₹3,540
SE, EDC, Ayodhya
₹71,500
13 Jan 2026
13 Dec 2025
20 Dec 2025
13 Dec 2025
19 Dec 2025
13 Dec 2025
Amount
Part - A ( Material) Following Material Supplied by the Contractor:-
Bracing Angle with Clamp
Pin Insulator
X-Arm holding clamp for PCC Pole
F- Clamp
Clamp for TOP/Dropper/angle for PCC Pole
Disc Insulator
Top Channel
Aluminum lug 120 sqmm
Dropper Angle
Nut Bolt
The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 20 Km.)
PCC Pole 8.5 Mtr. Long
11 KV 3x120 mmsq XLPE Cable
11 KV Cable Jointing Kit outdoor 3x120 sqmm
11 KV Staight Through Cable Jointing Kit 3x120 sqmm
11 kV VCB Outgoing Switchgear 200/100/5A 250 MVA
ACSR Weasel Conductor
11 KV 3 Ph 4-w Static TVM
11 kV Pilfer Metering Cubical
Other Line material i.e. cross arm / conductor / pin insulator / stay / earthing/cable Box etc. except A.B Cable.
Dragging of PCC Pole as per RESPO Norms.
Fabrication and Erection of Double Pole Support on PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Erection of Single Pole Support on PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Stringing, Sagging, binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms
Earthing of Poles by Ms Earthing rod of 20x2500 mm and 6 swg earthing wire etc.as per RESPO Norms
Grouting and Binding of Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Installation of 11 kV VCB Outgoing Switchgear 200/100/5A,
Laying of 11 KV XLPE Cable 3x120 sqmm by HDD (HORIZONTAL DRILL DIRECTION) Method by using suitable HDPE Pipe & HDD Machine Complete in all Respect as per norms. (All the material will be supplied by the contractor).
Laying of 11 KV XLPE Cable 3x120 sqmm by HDD (HORIZONTAL DRILL DIRECTION) Method by HDD Machine Complete in all Respect as per norms. (All the material will be supplied by the contractor).
Laying of 11 KV XLPE Cable 3x120 sqmm by trench
Hanaging, Hosting & clamping of G.I. Pipe, channel, nut & Bolt 3x120 mm2 XLPE 11 KV cable as per RESSPO Norms (cost of all accessories will be borne by contractor)
Installation of Heat Shrinkable Type cable jointing kits outdoor end Termination suitable for 11 KV XLPE cable 3x120 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 11 KV XLPE cable 3x70 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.)
Supply of HDPE Pipe for XLPE Cable
Supply of G.I. Pipe 6'' dia
Installation of 11 KV 3 Ph 4-w Static TVM
Installation of 11 kV Pilfer Metering Cubical
S V V ELECTRO ENGINEERING PRIVATE LIMITED (BID ID -5754833)
M/s Shukla Enterprises (BID ID -5755884)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
Tendernotice_2.pdf
PDF • 0.08 MB
BOQ_2023957.xls
BOQ • 0.25 MB
Retender37.pdf
Additional Documents • 0.26 MB
TenderForm37.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid