| 1 | L1₹3.3 CrAccepted-AOC 215 STADIUM ROAD NARANPURA AHMEDABAD GUJARAT 380013 | AHMADABAD | GUJARAT | 380013 | ₹3.3 Cr | L1 | Accepted-AOC Being Lowest |
| 2 | L2₹3.5 Cr+₹17.3 L (5.18%)Rejected-Finance | ₹3.5 Cr+₹17.3 L (5.18%) | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹3.7 Cr+₹39.2 L (11.8%)Rejected-Finance | ₹3.7 Cr+₹39.2 L (11.8%) | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹4.9 Cr+₹1.5 Cr (46.2%)Rejected-Finance FLAT NO S 2 SHRI CHINTAMANI S NO 1 1148 MAHAJAN PETH MODEL COLONY SHIVAJI NAGAR PUNE 411016 | PUNE | PUNE | MAHARASHTRA | 411016 | ₹4.9 Cr+₹1.5 Cr (46.2%) | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹7.0 Cr+₹3.6 Cr (109.5%)Rejected-Finance | ₹7.0 Cr+₹3.6 Cr (109.5%) | L5 | Rejected-Finance Not Lowest |
Tender Value
Refer Docs
EMD Value
₹4.1 L
Closing Date
20 Oct 2020, 6:00 pmClosed
CE (AF) GANDHINAGAR
CE (AF) GANDHINAGAR MES PO CRPF CAMPUS GANDHINAGAR 382042
PROVISION OF SOLAR POWER PLANT OF 500 KW AT SITE P AND SITE R AT AF STN THANE
2020_MES_370033_1
84181
Open Tender
Civil Works
Lump-sum
300 days
GE (AF) THANE
AS PER NIT AND TENDER DOCUMENT
9 documents required · 9 mandatory
₹2,000
GE (AF) THANE
₹4.1 L
Yes
7 Dec 2020
18 Aug 2020
21 Oct 2020
18 Aug 2020
20 Oct 2020
6 Oct 2020
26 Aug 2020 - 9 Sept 2020
Amount
NOTE: Schedule ‘A’ Part I to X are under Ser No. 1.00 to 10. are Prepriced by MES. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only.
Lump sum price worked out by the Contractor for Building / Structures as listed in Sch `A’ Part I.
Lump sum price worked out by the Contractor for Excavation & Earth works as listed in Sch `A’ Part II
Lump sum price worked out by the Contractor for Internal Water Supply as listed inSch `A’ Part III
Lump sum price worked out by the Contractor for Internal electrification as listed in Sch 'A' Part IV
Lump sum price worked out by the Contractor for External water supply as listed in Sch 'A' Part V
Lump sum price worked out by the Contractor for External Electrification as listed in Sch `A’ Part VI
Lump sum price worked out by the Contractor for Chain link Fencing as listed in Sch `A’ Part VII
Lump sum price worked out by the Contractor for Sewage Disposal as listed in Sch `A’ Part VIII
Lump sum price worked out by the Contractor for Foot Path/Culvert as listed in Sch `A’ Part IX
Lump sum price worked out by the Contractor for Steel Gate as listed in Sch `A’ Part X
SCHEDULE 'A' PART - XI MISC ITEMS
Design, supply, erecting, installing, testing and commissioning of grid connecting Solar PV plant of 350 KWP (at Site 'P') capacity including solar grade DC copper cable upto inverter, array junction boxes, pump/motor with necessary piping system, valves, foundation/satging work, starter panel with suitable starter required for clearing of solar modules soil investigation of MMS foundation etc & as conditions prevailing at THANE (MH) maximum temperature rise upto 55 degree celcius derating factor to be considered for Solar Panel comprising of following sub components/sub systems and meeting the specifications as given subsequently & as directed.
NOTE: The design of Solar power plant to be vetted by Accepting Officer. Solar panels shall be 100% manufactured in india including solar cell. (a) To obtain 350 KWp minimum required Numbers of poly crystalline silicon solar PV modules of not less than 320 Wp each having efficiency more than 16% at standard test condition, fill factor more than 0.80 plant performance ratio more than or equivalent to 80% in accordance with IEC:61724 & made of high transmittivity glass and glass front surface shall give high encapsulation gain. (transmittance above 90% and bending less than 0.3%) Electrical parameters of 320 Wp solar PV module under STC of irradiance 1000 W/m2 , AM 1.5 Spectrum& temperature 25⁰ C will be as under- Max Peak power Pmax : >320 Wp Current at Pmax Imp : 8.62 A Voltage at Pmax Vmp : 37.10 Volt Short circuit current Isc : 9.08 A Open circuit voltage Voc : 45.00 Volts
(i) Rated output of modules shall have positive tolerance of 3-5% & no negative tolerance is allowed. (ii) It shall perform satisfactorily in relative humidity 95 ± 5% with temperature -10 °C to +85°C (Cell) and should withstand wind 150 Km/Hr on the surface of the panel. (iii) PV modules must be warranted for their output peak watt capacity, which shall not be less than 90% of the initial value at the end of 10 years and 80% of the initial value at the end of 25 years. (iv) Each module shall have RFID tag encapsulated with Solar Cells bearing the following details. RFID reader will be provided by contractor. (v) The SPV generation to be claculated, considering situation of station Thane i.e. Latitude 19.1414 degree North and longitude 72.5909 degree south with monthly average radiation incident on An equator pointed tillted (kwh/m2/day and total solar radiation incident on horixontal surface at the surface of the earth (kw/m2/day).
● Name of manufacturer of PV module ● Name of manufacturer of solar Cell ● Month and year of manufacture (Separated for cell & module) ● Country of origin (separately for solar cell & module) ● Peak wattage, Im, Vm and fill factor of the module. ● Date of year of obtaining IEC PV module qualification certificate including the test lab issuing IEC certificate. ● Unique Serial No and model No of Module. ● I-V curve of Module ● The mechanical structures, electrical works and overall workmanship of the frid solar power plant must be warranted for a minimum of 5 Yers. ● Name of the test lab issuing IEC certificate. ● Other relevent information on traceability of solar cells and modules.
(vi) The temperature co-efficient for the module shall not be more than 0.50%/°C. (vii) Every module must have by pass diode of suitable capacity. (viii) PV module must conform to latest edition of IEC 61215/IS14286. In addition, the modules must conform to IEC 61730 Part-I & II for construction and testing & safety qualification & conforming to IEC 62804 PID & IEC 61701 / BIS61701 for corrosive atmosphere. (ix) It shall also in conformity of latest minimum technical specifications issued by MNRE from time to time. Modules should be of mimimum 72 cells configuration and should be of MNRE approved Companies/agencies in catagory/rating ''SA-1A'' made in india.
(x) Provision of earthing & earth strip/cables etc. for earth for solar PV module/Array etc. as per latest IS/MNRE norms to be provided and the cost of the same is to be included in this item and no extra amount will be paid to the contractor on this account. (xi) RFID reader to be provided by contractor. (b) Junction Boxes:- Supply suitable Numbers (as per design) of 12/16/24 Inputs and suitably rated output having separate DC fuses for both (+) and (-) on input and Isolator on output terminal for each string. Each Junction Box should have one spare Input terminal. SMB should have RS - 485 communication port to read Individual String Current, Bus Voltage and Inside Tempreture. Dust vermin and waterproof Array Junction Boxes of FRP/Thermo Plast with IP65 protection in compliance with IEC62208 and shall be sunlight /UV resistant a well of fire retardant including over voltage protection, surge protection and maintenance free earthing as per relavant standard.
AUTHORISED TESTING LABORATRIES/ CENTRES :- The PV module must be tested and approved by one of the IEC authorized test centres. In addition a PV module qualification test certificate as per IEC standard issued by ETDC, Bangalore or Solar Energy Centre will also be valid.
MODULE MOUNTING STRUCTURE : Design Supply, fixing, support structure MS hot dipped galvanised minimum 85 Micrones thickness including PCC foundation for civil works (excavation in any type of soil/rock cutting, grouting, PCC 1:3:6, type C2 etc.) and fixing the mounting arrangement suitable for PV solar modules & to withstand minimum horizontal wind speed of 150 kms/hr.The mounting structure is of mild steel hot dipped galvanised. The array structure shall be so designed that it will occupy minimum space without sacrificing the output from Solar PV panels.Nut bolts, supporting structures including module mounting structures shall have to be adequately protected from atmosphere and weather prevailing in the area. All fastners shall be of stainless steel of grade SS316. Two numbers of anti-theft fasteners of stainless steel on two diagonally opposite corner of each module shall be provided. The Module Mounting Structure to be of Manual Seasonal tilt of 0 degree to 40 degree to provide maximum generation.
NOTE:- 1. MMS Design should be supported by Staddpro Report vetted by 3rd party (either through IIT/NIT / state engineering college) and submitted for approval of Accepting Officer. 2. The mechanical structures, electrical work and overall workmanship of the grid solar power plant must be warranted for a minimum of 5 years. 3. The mounting steel structure shall be as per following :- (i) IS 2061-1992 and galvanized as per IS 4759. (ii) The material shall be corrosive resistant and electrically compatible with material used in module frame. (iii) The fasteners should be of stainless steel and should allow easy replacement fo any module. (iv) The minimum clearance of the structure from ground level should be 800 mm or highest flood level mark recorded at site and conplete all as per specified and directed.
Lightning Protection for PV Array: Design, supply & fix Lightning Arrestor of required number of suitable Early Streamer Emission (ESE) lightning arrestors installed in the array field. Lightning arrestors/surge arrestors shall conform to IEC 60099-4 or IS:3070 except to the extent modified in the specifications. Arrestors shall be of hermetically sealed units, self-supporting construction, suitable for mounting on lattice type support structures. The air terminal is Early Streamer Emission (E.S.E.) type which shall be fixed at the top of a GI elevation pole with base so as be at least 2 meters above the structure to be protected. Its height above roof level would be dependent on the level of protection and the protection radii required. The air terminal should be working on the principle of early streamer emission using non-radioactve technology, neeeding no external power source. The air terminal should be capable of racking the lightning stroke 60 micro seconds earlier as compare to passive lightning rod. The air terminal is of stainless steel and it has qualified diameter to resist high values of lightning currents.The air terminal is of stainless steel and it has qualified diameter to resist high values of lightning currents.Roof connecting pipe should be capable of withstand in lightning strikes having dimension 50mm ID and 60mm OD. The terminal adaptor having inner dia 60mm OD. (a) For Site 'P'-02 Nos (b) For Site 'R'-02 Nos
NOTE: 1. Cost of all equipments, copper strip upto earth test point etc are included in this item. 2. The cost of sufficient earthing for lightning protection is included in this item and no extra payment will be made to the contractor on this account.
Grid Inverter : Design, Supply, fixing, testing and commissioning of outdoor type solar inverter suitable for 350 KW or nearst higher capacity, 50 Hz ± 3 Hz 3 phase 400V, 615A DTH <3% at nominal power inverter suitable to convert DC power of solar PV module/array to AC for further feeding to grid & conforming IEC-61683 for efficiency, IEC-62109(1&2) or equvalant for safety & IEC-62093 for reliability. The input D.C. tech specification of inverter are as under-
Input (DC) Max DC power : 350 KWp or nearest higher size capacity MPP range : 380-820V Max current : 615A No. of MPPT trackers : As per design No of input string : As per design Operating temperature : -10º to +85ºC. The inverter shall consist of associated control, protection, data loging device and remote monitoring hardware. The inverters shall have minimum protection to IP-65 and minimum European efficiency of 98% without Aux. Power Consumption at Minimum Udc. as per IEC 61683 standard.The Inverter should have Harmonic Distortion Current less than 3%.
The inverter shall adjust voltage and frequency levels to suit the grid. The inverter shall be self-commulated with pulse width modulation (PWM) technology and shall be capable of synchronize maximum within 1 minute. Maximum power point tracker (MPPT) conforming IEC-62093 shall be integrated in the inverter to maximize energy drawn from the solar PV array. MONOLITHIC Design of Inverter is not permissible. The Inverter should have suitable nos. of Protected Inputs (as per design) and Outgoing should be protected by ACB. The Inverter should be proided with SPG and suitable earthing kit. The Inverter should have MODBUS, PROFIBUS, ETHERNET Communication port. The out put of DC current to be connected in common bus bar from both inverter and further connected to step up transformer
The inverter shall include appropriate self protection & self diagnotic feature to protect itself and the PV array from the damage in the event of inverter component failure or from parameters beyond the inverter's safe operating due to internal or external causes. Inverter shall have protected arrangement against ground leakage faults, over voltage (SPD) & over current. Inverter shall have arrangement for adjusting DC input current & shall trip against sustainable fault down stream and shall not restart till fault is rectified. The inverter should have provisions of Galvanic isolation, Anti-islanding protection (IEEE 1547/UL 1741) equivalent BIS standard and lightening.
Technical Specification of Invertor :- (i) Nominal Voltage 415V ⁺⁄₋ 0%, 3 phase, 50 Hz (ii) Control Micro-processor / DSP (iii) Switching Device : IGBT / MOSFET (iv) Grid Freq. Synchronization : ⁺⁄₋ 3Hz or more (v) Ambient Temp : -20ºC to +50ºC (vi) Humidity : 95% non condensing (vii) Protection of enclosure IP 65 (outdoor)(Minimum) (viii) No load losses : <1% of rated power (ix) Inverter Efficiency : >97%(without inbuilt galvanic isolation) (x) PF : > 0.9 (xi) THD : <3% (xii) Inverter should have internal protaction arrangement against any sustainable fault in feeder line and against the lightning on feeder. (xiii) Should have isolating transformer. (xiv) Inverter generated harmonics, flicker, DC injection limites, Volt range, frequency range and anti-islanding measures should follow latest CEA Guidelines / IEC 62116 / BIS Code.
DATA ACQUISITION SYSTEM/PLANT MONITORING & SCADA: Monitor system to be provided to monitor the performance of the inverter (power, array voltages, array currents & AC parameters), energy yield, temperature, irradiance level etc. and It could provides flexible interface to facilitate PC based inverter monitoring and control via LAN modem. This should have include web visualization system and data logger with integrated ethernet port. (a) For Site 'P'-01 No (b) For Site 'R'-01 No (i) Data acquisition System shall be provided for solar PV plant. (ii) Data Logging Provision for plant control and monitoring, time and date stamped system data logs for analysis with the high quality, including suitable PC & Printer. Metering and Instrumentation for display of systems parameters and status indication to be provided. (iii) Solar Irradiance: AN integrationg Pyranometer/Solar cell based irradiation sensor (along with calibration certificate) provided, with the sensor mounted in the plane of the array. Readout integrated with data logging system weather monitoring kit which includes- Radiation Sensor(c-Si type)/Pyranometer,Temperature Sensor (RTD Type), Ambient Temp Sensor, Module Temp Sensor.
(iv) Temperature: Temperature probes for recording the Solar Panel temperature and/or ambient temperature for horizontal and inclined plane (v) Anemometer to be provided to measure direction and wind speed, to be provided complete with readouts integrated with the data logging system (vi) String level monitoring to be provided.
(vii) The parameters like AC Voltage, AC Output current, Output Power, Power factor, DC Input Voltage, DC Input Current, Time Active, Time disabled, Time Idle, Energy Produced, Protective function limits (Viz-AC Over voltage, AC Under voltage, Over frequency, Under frequency ground fault, PV starting voltage, PV stopping voltage etc. are accessible via the operating interface display in real time separately for solar power plant. (viii) All major parameters available on the digital bus and logging facility for energy auditing through the internal microprocessor and read on the digital front panel at any time and logging facility (the current values, previous values for up to a month and the average values) should be made available for energy auditing through the internal microprocesor and and should be read on the digital front panel. (ix) PV array energy production: Digital Energy Meters to log the actual value of AC/DC voltage, Current & Energy generated by the PV system provided. Energy meter along with CT/PT should be of 0.5 accuracy class.
(x) Computerized DC String/Array monitoring and AC output monitoring shall be provided as part of the inverter and /or string/array combiner box or separately. (xi) String and array DC Voltage, Current and Power, Inverter AC output voltage and current (All 3 phases and lines), AC power (Active, Reactive and Apparent), Power Factor and AC energy (All 3 phases and cumulatve) and frequency shall be monitored. (xii) Computerized AC energy monitoring shall be in addition to the digital AC energy meter.
(xiii) Data Logger Monitoring system should have suitable input port to monitor Transfermer ( Buchholz relay, WTI and OTI) and VCB parameter.The data shall berecorded in a common work sheet chronologically date wise. The data file shall be MS Excel compatible. The data shall be represented in both tabular and graphical form. (xiv) All instantaneous data shall be shown on the computer screen and submitted to the GE on-line or through a report. (xv) Software shall be provided for USB download and analysis of DC and AC parametric data for individual plant.
(xvi) Provision for Internet monitoring and download of data shall be also incorporated. (xvii)Provisioning of Remote Server and software for centralized Internet monitoring system shall be also provided for download and analysis of cumulative data of all the plants and the data of the solar radiation and temperature monitoring system. (xviii) Ambient /Solar PV module back surface temperature shall be also monitored on continuous basis.
(xix) Simultaneous monitoring of DC and AC electrical voltage, current, power, energy and other data of the plant for correlation with solar and environment data shall be provided. (xx) Local server data storage capacity shall be sufficient to provide all parameters stored. It should have read and write facility CD/ DVD.
(xxi) Remote Monitoring and data acquisition through Remote Monitoring System software at the owners location with latest software/hardware configuration and service connectivity for off-line SCADA monitoring/control complete to be supplied and operation and maintenance/control to be encured by the supplier. Provision for interfacing these data on owners server and portal in future shall be kept. NOTE: The cost of all equipments , internet, ethernet connections, connected cables, computer, printer etc. are included in this item. Training: On successful commissioning of the plant, training shall be provided on Plant operations and maintenance to a team (Engineers and Technician/Operations) as nominated by accepting officer for 03 days. (xxii) Supply, fix/lay and testing of DC Solar cable of size - 1x 4 Sq mm Tinned multistranded Copper Cable with required accessories like conduits, glands, cable tie, ferrules etc. String to SMB of suitable length as per design requirement.
(xxiii) Supply, fix/lay and testing of DC Solar power cable of size - 1x120 sq mm multistranded Copper with required accessories like conduits, glands, cable tie, ferrules from SMB to Inverter of suitable length as per design requirement. (xxiv)Supply and fix/lay Auxillary power cable of size - 3x1.5 sq mm multistranded copper with required accessories like conduits, glands, cable tie, ferruls etc of suitable length as per design requirement. (xxv) Supply and fix/lay communication cable of suitable size with required accessories like conduits, glands, cable tie, ferruls etc of suitable length as per design requirement.
Supply, laying, testing and commisioning of XLPE insulated screened PVC bedded galvanised steel strip or wire armored electric power cable (heavy duty) with multistranded Aluminum conductors 22000 V Earthed system grade of cross sectional area 95 sq mm 3 core with suitable laying arrangement. For connection from 22 KV VCB Outgoing panel to load point complete all as specified and directed
Supply and fix/lay LT cable, single core XLPE, Aluminium conductor cable, Armoured cable of size1X120 sq mm size from invertor to step up transformer complete all as specified and directed (a) For Site 'P'-950 RM (b) For Site 'R'-950 RM
Supply, installation testing and commossioning of outdoor type stepup transformer converter duty type low losses as per ECBC of 400 KVA or nerest higher capacity, IS 1800:2014, 0.400/22 KV, 3 PHASE, 50 HZ, ONAN COOLED OIL IMMERSED COPPER WOUND OUTDOOR TYPE STEP UP TRANSFORMER COMPLETE WITH FIRST FILLING OF IS : 335 ISI MARKED FILTERED & DEHYDRATED TRANSFORMER OIL AND OTHER STANDARD FITTINGS / ACCESSORIES AND 7 POSITION OFF CIRCUIT TAP CHANGER (TAPPING RANGE + 7.5% IN STEPS OF 2.5% EACH) WITH VECTOR GROUP Dyn-11 or as per inverter supplier recommendations, suitable for feeding supply generated from solar power plant to 22 KV VCB panel including following items :-
HV Cable Box (Without Cable Glands) LV Cable Box (Without Cable Glands) Marshalling Box (having TTB Only ) all as specified and directed (i) Buchholz Relay with alarm and trip contact and shut off valves. (ii) Oil temperature indicator 150 mm dia with alarm and trip contact. (iii) Winding temperature indicator with alarm and trip contacts. (iv) Marshalling box 200 TB (MK) -03 Nos (v) Magnetic oil level gauge. (vi) Pressure release valve (PRV) with trip contacts.
(vii) Conservator with oil filling hole with cap and drain plug and with built in diaphragm to avoid direct air contact with transformer oil. (viii) Oil level indicator with minimum level marking. (ix) The mometer pockets with thermometer. Note:- Transformer yard should be properly maintained. Yard should be shrubs/ grass free and also 20 mm stone aggregate properly laid. (x) Silica gel breather (xi) Air Release plug. (xii) Lifting Lugs
(xiii) Earthing terminals (xiv) Bi-directional Rollers (xv) Anodized aluminum rating and diagram plate. (xvi) Top filter valve Note :- (i) The erection, installation of transformer shall be done under the supervision of manufacturers auth rep & certificated to this office shall be submitted by contractor duly signed by auty rep of manufacturer & Engineer-in-Charge.
Supply,testing and commissioning of HT 22 KV, indoor type, 3 phase, 50 cycles totally enclosed metal clad VCB Switchgear having Rupturing capacity upto 350 MVA, overload and earth fault protection, ammeter, voltmeter and of rating 630 Amp. Suitable for solar power plant generation (a) For Site 'P'-01 EACH JOB (b) For Site 'R'-01 EACH JOB (a) Housing for circuit breaker carriage-01 (b) Mechanical inter lock and automatic safety shutter gear including pad locking arrangement-01 (c ) Isolating plugs-06 (d) 01 No 22 KV, 630 Amps, VCB panel board having qty 02 Incoming VCBs and qty 01 outgoing VCB on common bus bar comprising of :- (e) Assembly of 3 VCB interupters complete with epoxy support insulator and self aligning finger type isolating contacts
(f) Hand and motor (220 volt AC) charged independent spring closing/tripping trip free operating mechanism with mannual closing and tripping push buttons and mechanical breaker closed /open , spring charged/discharged indication. (g) Electrical release coil 24V DC-01 No (h) Mechanical operation counter. (i) Breaker operated auxillary switch-03 Nos (j) Bus bar chamber including a set of 3 phase 630 Amp copper bus bar - 01 No (k) 230 volts AC single phase 80 W rated strip type heater -02 Nos with indicator complete
(l) Voltage transformer (VT) incorporating 3 phase 3 limb with drawable type VT having ratio 22 KV/110V and out put of 100 VA per phase with accuracy class I as per IS-3155 complete with HT and LT HRC fused n primary and secondary sides respectively (confirming related IS specification) -02 set of suitable ratio CTs for incomer and Outgoing VCBs. (m)Current transformer (CT) chamber incorporating 3 single phase resin cast, dual ratio CTs of 100/50/5/2.5/1 with suitable VA burden and accuracy class. Note: Final VCB configuration shall be as per State DISCOM approval.
(u) Trip circuit healthy indication lamp with push button-01 (v ) Power factor meter digital type-01 (w) Frequancy meter -01 (x) Cable gland of suitable size (y) Shunt trip 24 volts DC, Electronic, digital KWH meter and Trivector meter CT type suitable for metering CTs. (z) Including all relay i.e. earth fault, over current etc as per manufacture desig.n
M&L for earthing complete with Copper plate electrode size 600mm x 600mm x 3 mm thick burried directly in ground vertically in a pit of depth not less than 2.25 mtr below ground levels with top edge of the earth plate not less than 1.5 mtr below normal ground level surrounded from all sides by mixture of charcoal and common salt and electrode connected to and including copper strip 20x3 mm earth lead by means of bolts, nuts, check nuts and washers of galvanised steel and 40mm dia GI Pipe light grade for protection and mdium grade 40mm dia bore for watering funnel with wire mesh. CI cover with frame, PCC chamber pit with PCC 1:3:6 type C-2 excavation and earth work in any type of soil/rock all as shown in electrical plate No 3 connected to earthing test point all as specified or indicated including testing on completion complete all as directed.
NOTES : (i) The concrete pit shall be PCC 1:3:6 type C-1, 40 mm thick pre cast cover slab of RCC M25 design mix using 20mm graded stone aggregate reinforced with 8mm TMT bars @ 10 cm C/C on both sides with suitable cast iron handle shall be provided in lieu of cast iron cover shown in electrical plate No 3 of MES SSR Part-I. (ii) Item includes the cost of 7.5 RM GI pipe for protection of earth strip. Any variation in length shall be adjusted through deviation order. (iii) Item includes cost of 7.5 RM copper earth strip. Any variation in length shall be adjusted through deviation order. (iv) PCC pit shall be provided at least 500 mm away from the pit and not on the earth pit itself and the extra cost of additional length of watering pipe, bends, elbow etc shall be deemed included in the unit rate. (v) The cost including the Extension of HT bus bar for connect the existing HT panel bus bar.
Supply, install and testing and commissioning of 5 KVA UPS for weather monitoring station and plant control SCADA/DATAS logger complete with power back up of VRLA tubular wet batteries of appropriate rating battery backup duration minimum of 2 hrs complete all as specified and as directed
Supply , install , testing tarrif metering CT as per State Electricity Board complete all as specified & directed.
Supply , install , testing tarrif metering PT as per State Electricity Board complete all as specified & directed.
Supply , install , testing ABT metering PT as per State Electricity Board complete all as specified & directed.
NOTE for Item No- 21 to 23 1. Every connection shall be covered by an agreement between (the GE for MES) and distribution agency. 2. The bi-directional meters (for Net-metering) are to be installed and operated in accordance with CEA regulation of 2006, ammended 2010 & 2014. During the day excess power from the array is fed in the grid. At night, the deficent is purchased from the state electricity board (utility) at agreed price.
M & L for fire extinguisher DCP type (ABC type foam of capacity 9 Kg, Sand Buckets
Annual comprehensive maintenance & operation including all recording & documentation of solar power site records & parameters etc. including cleaning of modules weekly by spraying water with help of & including expandable hose pipe & wipers complete all as specified & directed for the following year:- For 350Kwp at Site P
(a) First Year
(b) Second Year
(c) Third Year
(d) Fourth Year
(e) Fifth Year
NOTE :- After Completion the contractor must engage a third party MNRE approved consultant for final testing and third party inspection of executed work. The consultant shall certifie that the work has been executed in accordance with vatted and approved design. The contractor shall propose a panel of 3 consulatant for this purpose. The final desision on the consultant to engaged shall be taken by the Accepting Officer. All cost and charges for engagement of consultant shall be borne by the contractor.
All as per item No 11 above but Solar PV plant of 150 KWp ( at Site 'R')
All as per item No 13 above but Grid Invert of 150 KW (at Site 'R' )
Supply, laying, testing and commisioning of XLPE insulated screened PVC bedded galvanised steel strip or wire armored electric power cable (heavy duty) with multistranded Aluminum conductors 22000 V Earthed system grade of cross sectional area 95 sq mm 3 core with suitable laying arrangement. For connection from 22 KV VCB Outgoing panel to load point complete all as specified and directed
Supply, installation testing and commossioning of outdoor type stepup transformer converter duty type low losses as per ECBC of 200 KVA or nerest higher capacity, IS 1180:2014, 0.400/22 KV, 3 PHASE, 50 HZ, ONAN COOLED OIL IMMERSED COPPER WOUND OUTDOOR TYPE STEP UP TRANSFORMER COMPLETE WITH FIRST FILLING OF IS : 335 ISI MARKED FILTERED & DEHYDRATED TRANSFORMER OIL AND OTHER STANDARD FITTINGS / ACCESSORIES AND 7 POSITION OFF CIRCUIT TAP CHANGER (TAPPING RANGE + 7.5% IN STEPS OF 2.5% EACH) WITH VECTOR GROUP Dyn-11 or as per inverter supplier recommendations, suitable for feeding supply generated from solar power plant to 22 KV VCB panel including following items :-
HV Cable Box (Without Cable Glands) LV Cable Box (Without Cable Glands) Marshalling Box (having TTB Only ) all as specified and directed (i) Buchholz Relay with alarm and trip contact and shut off valves. (ii) Oil temperature indicator 150 mm dia with alarm and trip contact. (iii) Winding temperature indicator with alarm and trip contacts. (iv) Marshalling box 200 TB (MK) -03 Nos (v) Magnetic oil level guage. (vi) Pressure release valve (PRV) with trip contacts.
(vii) Conservator with oil filling hole with cap and drain plug and with built in diaphragm to avoid direct air contact with transformer oil. (viii) Oil level indicator with minimum level marking. (ix) The mometer pockets with thermometer. Note:- Transformer yard should be properly maintained. Yard should be shrubs/ grass free and also 20 mm stone aggregate properly laid. (x) Silica gel breather (xi) Air Release plug. (xii) Lifting Lugs
(xiii) Earthing terminals (xiv) Bi-directional Rollers (xv) Anodized aluminum rating and diagram plate. (xvi) Top filter valve Note :- (i) The erection, installation of transformer shall be done under the supervision of manufacturers auth rep & certificated to this office shall be submitted by contractor duly signed by auty rep of manufacturer & Engineer-in-Charge.
Annual comprehensive maintenance & operation including all recording & documentation of solar power site records & parameters etc. including cleaning of modules weekly by spraying water with help of & including expandable hose pipe & wipers complete all as specified & directed for the following year:- For 150Kwp at Site R
(a) First Year
(b) Second Year
(c) Third Year
(d) Fourth Year
(e) Fifth Year
NOTE :- After Completion the contractor must engage a third party MNRE for final testing and third party inspection of executed work. The consultant shall certifie that the work has been executed in accordance with vatted and approved design. The contractor shall propose a panel of 3 consulatant for this purpose. The final desision on the consultant to engaged shall be taken by the Accepting Officer. All cost and charges for engagement of consultant shall be borne by the contractor.
EXTERNAL ELECTRIC SUPPLY
M & L for dry tibba sand in trenches cushioning to under ground cable spreading, levelling hand punning complete all as specified and directed. Note : Punned down thickness with be measured for payment purpose
Supply and fix LED Flood Light 60 W luminaries with secondary optic made in pressure die cast housing and sink in aluminium etrusion with IP66 complete all as specified and as directed
Supply and fixing octogonal pole hot dip galvanised length 6 mtr, top 70mm, bottom 130mm base plate sixe 220 x 220 x 12mm including foundation with single arm bracket all as per manufacturer's instruction/drawing complete all as specified and as directed
Supply and fix IP thermoplastic (polystyrene) dust proof with internally embedded gasket environmentally safe with suitable PVC/MS clamp for pole rounting arrangement and conductor at appropriate size and bakelite 20/32 amps fuse bus carrier and HRC furse for control single phase AC 250 volts supply of size 200 x 160x 98mm mm with 10 Amp MCB SP all as specified and directed-16 Nos.complete all as specified and as directed
Supply and fixing PVC insualted cable of size 1.5 Sqmm three core Stranded copper conductor from junction box to street light complete all as specified and as directed
Material and labour for horizontal boring of holes including HDPE pipe 80mm bore laid under road crossing for passing of LT/HT cables in any type of soil strata by trenchless technology complete all as specified and as directed.
PLATEFORM FOR TRANSFORMER & VCB
Supply and fix cable jointing kit for 22 KV grade cable for indoor termination heat shrink type joint complete with jointing material and accessories suitiable for 3 core XLPE armoured cable of size 95 to 120 mm complete all as specified and as directed
Supply and fix cable jointing kit for 22 KV grade cable for outdoor termination heat shrink type joint complete with jointing material and accessories suitiable for 3 core XLPE armoured cable of size 95 to 120 mm complete all as specified and as directed
Supply and fix cable route indicator for HT, 6mm thick CI plate of size 100mm dia welded to MS angle iron 50x50x6mm emnbeded in PCC 1:3:6 TYPE C-1 block size 150x150x160mm complete all as specified and as directed
Material and labour for laying 20-25 mm graded stone aggregate in the substation complete all as specified and as directed.
Disconnection the incomming and out going HT cable from existing VCB, shifting the VCB (one incommer and three out going) to new substation builiding and reconnection all incommeing and outgoing cable complete all as specified and as directed Note : Rate including the connection of earthing strip to existing earth pit all as directed.
M & L for taking up the HT cable of any size from trenches, cable duct and relaying in new route for connection of the existing VCB in new substation all as specified and as directed
Supplying, jointing and commissioning straight through type end termination joint kit hear shrinkable type suitiable for under ground XLPE cable size 3 core, 95 to 120 sqmm 11/22 KV HT cable all as specified and as directed
CHAIN LINK FENCING
Supply only chain link 1 mm anti UV PVC coated galvanised fencing any size or type jointed lap wired and fixed in position all as specified
SEWAGE DISPOSAL
Advance Septic Tank of capacity 1200L made of LLDPE (Linear Low Density Polyethylene). The system consists of 1 No of LLDPE Tank made of Rota Molding Process, having diameter of 1.30 meter with usual process variation and height of 1.40 meter with usual process vaiation. The tank shall have two chambers (zones), i.e. settling zone and film zone (High Specific Surface Area) with pall ring media. The first chamber to work as a solid separation zone where the settleable solids settle down and are further degraded nanerobically. Second stage is heigh specific surace area (100 m2/m3) through fixed filim plastic media to retain haigh mass of anaerobic microorganism to degrade the organic matter in the sewage complete all as specified and as directed.
SOAK PITS
Pre-Fabricated Soak Pit of capacity 4000L made of LLDPE (Linear Low Density Polyethylene). The system consists of 1 No of LLDPE Tank made by Roto Moulding process having of 2.02 meter with usual process variation. Tank to have preforations of suitable size on major part of body for absorption of sewage coming from septic tank in to soil complete all as specified and as directed
M & L for high density polythyene pipes (HDPE) of pressure rating 6kgf/Sqcm laid in trenches of bore 80 mm complete all as specified and directed
M & L for high density polythyene pipes (HDPE) of pressure rating 6kgf/Sqcm laid in trenches of bore 50 mm complete all as specified and directed
M & L for high density polythyene pipes (HDPE) of pressure rating 6kgf/Sqcm laid in trenches of bore 40 mm complete all as specified and directed
INTERNAL ELECTRIFICATION
Supply & fix ceiling fan of 1200mm sweep Five star and connecting upto and including provision of flexible three core copper conductor cable 23/00076 from ceiling rose complete all as specified and directed.
Supply & fix exhaust fan 300 mm sweep AC, 240 volts, metal body, fixed as per manufacturer instruction, connecting with and including 1.5 sqmm copper conductor, PVC insulated and PVC sheathed three core cable complete all as specified and directed.
Supply & fix LED tube of 1 x 20 W (4 feet) 230V, 600k, Taskline AL slim LED batten excellent energy saving and maintenance - free operation Housing made up of extruded aluminium and extruded PC difuser complete with all accessories and all as specified and directed by EIC. Make : Orient Cat ref Model No LBLN-20-C-AL or equivalent Philips, Havells
Supply & fix LED tube of 1 x 10 W (2 feet) 230V, 6000k, Taskline AL slim LED batten excellent energy saving and maintenance - free operation Housing made up of extruded aluminium and extruded PC difuser complete with all accessories and all as specified and directed by EIC. Make : Orient Cat ref Model No LBLN-10-C-AL or equivalent Philips, Havells
Supply & fix LED Security light luminaire 1 x 25 W having IP-65 protection, with minimum system efficiency as >85% made of PRESSURE DIE CAST housing toughened glass in the front and peanut lens for bat-wing light distribution with excellent thermal management. The fitting should have rated CCT 6000 K complete with all accessories like bracket, clamp etc and all as specified and directed by EIC as per Make : Orient cat ref Model No LSFS-025-CF or equivalent Philips, Havells
Supply & fix DB SPN 8 way double door type for flush/surface mounting distribution board, factory made and tested complete, suitable for mounting MCB's tinned copper bus bar, cable lugs/thimble complete with following MCBs (a) SPN 240 Volts, 6 to 32 Amps, C series - 01 No (b) SP 240 Volts, 6 to 32 Amps, C series - 06 Nos
SVC PROJECTS PVT. LTD
DARSHAN CONSTRUCTION Co.
Horizon Construction
Godara Construction and General Suppliers
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .