| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAdmitted-Finance | ₹18.6 L | L1 | Admitted-Finance |
| 2 | L2₹20.6 LAdmitted-Finance 04 3 | PRATAPGARH | RAJASTHAN | 312604 | ₹20.6 L | L2 | Admitted-Finance |
| 3 | L3₹20.9 LAdmitted-Finance | ₹20.9 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Shree Giriraj Enterprises L3 | NARMADESHWAR NIRMANKAR L1 | MAYANK ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00Part - "B" NON BSR Item | ||||||
| 1.01Operation, Repairs & Maintenance (involving labour only) of existing external & internal sanitary and water supply system for various buildings of the entire university campus etc. except providing & fixing of material, which shall be paid separately as per boq-1. The scope of work includes following : | ||||||
| 1.021. Operation of Existing external & internal water supply system for various buildings of the entire university campus through out the year like filling of PVC WATER tanks placed over terrace of buildings & under ground water tanks to give uninterrupted daily water supply to the buildings & outside buildings for gardening work. Also operation of tube well as and when required by the University. 2. Including repairs which are not requiring any involvement of material like repair of loose connections, pipe line air problems & other works as per direction of engineer-in-charge. 3. All repair included in the item. All such expenses will be borne by the Contractor at his own cost. | ||||||
| 1.03 | 4. Contractor shall arrange at his cost to regulate water supply on day to day basis regularly as per instructions of Engineer-in-charge. A register shall be maintained at University office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the University office daily and comply the instructions and attend complaints regularly.
5. University shall not be responsible for any kind of accident during execution of work.
6. Contractor will be responsible are arrangement of all T&P required for the work. | 12 | Per Month | 15,500 ₹1.9 L | 16,000 ₹1.9 L | 15,500 ₹1.9 L |
| 10.00 | The Total value of Schedule4 | 1 | Nos | - | - | - |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
6 May 2026, 5:00 pmClosed
VMOU, Kota
VMOU, Kota
Comprehensive Annual Repair and Maintenance Contract for Sanitary and Water Supply System of University Campus at VMOU, Kota
2026_VMOU_554183_1
NIB No. 02/2026-27
Open Tender
Civil Works
365 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
VMOU, Kota
₹50,000
15 May 2026
24 Apr 2026
7 May 2026
27 Apr 2026
6 May 2026
27 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Part - "B" NON BSR Item | ||||||
| 1.01 | Operation, Repairs & Maintenance (involving labour only) of existing external & internal sanitary and water supply system for various buildings of the entire university campus etc. except providing & fixing of material, which shall be paid separately as per boq-1. The scope of work includes following : | - | - | - | - | BI01010001010000000000000515BI0100001113 |
| 1.02 | 1. Operation of Existing external & internal water supply system for various buildings of the entire university campus through out the year like filling of PVC WATER tanks placed over terrace of buildings & under ground water tanks to give uninterrupted daily water supply to the buildings & outside buildings for gardening work. Also operation of tube well as and when required by the University.
2. Including repairs which are not requiring any involvement of material like repair of loose connections, pipe line air problems & other works as per direction of engineer-in-charge.
3. All repair included in the item. All such expenses will be borne by the Contractor at his own cost. | - | - | - | - | BI01010001010000000000000515BI0100001128 |
| 1.03 | 4. Contractor shall arrange at his cost to regulate water supply on day to day basis regularly as per instructions of Engineer-in-charge. A register shall be maintained at University office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the University office daily and comply the instructions and attend complaints regularly.
5. University shall not be responsible for any kind of accident during execution of work.
6. Contractor will be responsible are arrangement of all T&P required for the work. | 12 | Per Month | - | - | BI01010001010000000000000515BI0100001128 |
| 10 | The Total value of Schedule4 | - | Nos | 10 | - | BI01010001010000000000000515BI0100001129 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
TenderDocument.pdf
Tender Documents • 0.52 MB
BOQ_987091.xls
BOQ • 0.68 MB
Download all tender documents and submit your bid