Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Non responsive as per criteria |
Tender Value
₹19 L
EMD Value
₹38,000
Closing Date
23 Jul 2020, 4:30 pmClosed
Executive Engineer
Office of the Executive Engineer JDA Div.No.II Nehru Market Ware House, Jammu
Construction of Retaining Wall (Reinforced Cement Concrete) along the proposed electric receiving station for flatted accommodation Muthi
2020_HAUDD_100507_1
JDA/II/e-NIT/2020-21/24 Dated 15.07.2020
Open Tender
Civil Works
Item Rate
60 days
Jammu
As per SBD
3 documents required · 3 mandatory
₹1,120
Financial Advisor and CAO JDA
₹38,000
28 Jul 2020
15 Jul 2020
24 Jul 2020
15 Jul 2020
23 Jul 2020
15 Jul 2020
Amount
Earth work in excavati..;n by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed: All kind of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level 1:5:10 (1 cement:5 coarse sand:10 graded stone aggregate 40 mm nominal size) (Crushed)
Providing and laying in position specified grade of Renfoced Cement Concrete excluding cost of centering, shuttering, finishing and reinforcement all work upto plinth level 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (Complete Job)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement. 1:1.5:3 ( 1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size. (Complete Job)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically treated bars. (Complete Job)
Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. (Complete Job)
Centering and shuttering including strutting, propping etc. and removal of form for: walls (any thickness including attached pilasters, buttresses, plinth and string courses etc. (Complete Job)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m (Complete Job)
Hand packing of stone including supply of stone and preparation of surface. (Complete Job)
Imtesh Bhat
Sukhdev Sharma
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .