Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹35.1 L
EMD Value
₹1.8 L
Closing Date
16 Nov 2026, 1:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EO NPP SHAMSABAD AGRA
NPP SHAMSABAD AGRA
WARD 12 MO TOLA ME BARATGHAR NIRMAN WORK
2026_DOLBU_1199180_1
269/NPPS/2026-27/15-10-26
Open Tender
Civil Works
Percentage
NPP SHAMSABAD AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,520
Yes
EO
₹1.8 L
Yes
21 Oct 2026
21 Oct 2026
16 Nov 2026
21 Oct 2026
16 Nov 2026
21 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam, clay,sand) including lift upto 1.5m and lead upto 30m and including filling watering and ramming of excavated earth into trench s or into into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer in-charge upto a distance of 30m from the foundation trenches .Mannual(small work) PWD SOR (23-24)CH.4 SL. NO.1 | 92.14 | m3 | 150 | ₹13,821 |
| 2 | Earth work in Filling with ordinary Soil upto km-5 lead and carted, compacted Including all Charges with all completeas per EIC | 69.26 | m3 | 298.5 | ₹20,674.11 |
| 3 | Providing and laying cement concrete in 1:4:8(1 cement:5 fine sand :10 graded stone aaggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors with all complete.as per EIC PWD SOR CH.5 SL. NO.2 | 23.89 | m3 | 5,625 | ₹1,34,381.25 |
| 4 | Class -150 (Non modular brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work .as per EIC PWD SOR CH.6 SL. NO.2 | 27.89 | m3 | 5,650 | ₹1,57,589.8 |
| 5 | Class -150 (Non modular brick work in 1:4 cement and coarse sand mortar in SUPERSTRUCTURE including supply of all materials, labour and T&P etc. required for proper completion of the work .as per EIC PWD SOR CH.6 SL. NO.2 6.8,2&5 | 53.97 | m3 | 6,110 | ₹3,29,768.92 |
| 6 | 12mm cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm. In girth and finished even and smooth.as per EIC PWD SOR CH.13 SL. NO.1 | 604 | m2 | 200 | ₹1,20,800 |
| 7 | RCC work providing and laying in position specified grade of reinforced cement concrete including the cost of centering,shuttering,finishing and excluding rem forcement ALL WORK UPTO PLINTH LEVEL :1:1:5:3 (1 cement:1.5 coarse sand :3 graded stone )as per EIC PWD SOR CH.5 SL. NO. 09 | 12.51 | m3 | 8,200 | ₹1,02,582 |
| 8 | RCC work in walls (any thickness) including attach pilasters ,buttress plinth and string courses ,fillets ,columns ,pillars piers abutment post struss etc. including the cost of centering,shuttering,finishing and excluding rem forcement Above plinth level upto fifth floor lable :1:1:5:3 (1 cement:1.5 coarse sand :3 graded stone ) as per EIC PWD SOR CH.5 SL. NO.12 | 8.38 | m3 | 9,050 | ₹75,839 |
| 9 | RCC work in beams ,suspended floors ,roofs having balconies ,shelves chajjas ,bands ,staircase and soiral stair cases above plinth level upto floor five level including the cost of centering,shuttering,finishing and excluding rem forcement Above plinth level upto fifth floor lable :1:1:5:3 (1 cement:1.5 coarse sand :3 graded stone )as per EIC PWD SOR CH.5 SL. NO. 10 | 9.11 | m3 | 8,900 | ₹81,070.1 |
| 10 | RCC work providing and laying in position specified grade of reinforced cement concrete ,slab including the cost of centering,shuttering,finishing and excluding ren forcement Above plinth level upto fifth floor lable :1:1:5:3 (1 cement:1.5 coarse sand :3 graded stone ) as per EIC PWD SOR CH.5 SL. NO. 10 | 31.03 | m3 | 8,700 | ₹2,69,934.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_2267328.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .