Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.6 L+₹159.22 (0.10%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L2₹1.6 L+₹159.22 (0.10%)Admitted-Finance NOT AVAILABLE | L2 | Admitted-Finance |
Tender Value
₹1.6 L
EMD Value
₹3,180
Closing Date
17 Aug 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
BOQ
2026_RDPR_317606_27
e-NIT No. 78 REW UDHAMPUR of 2026-27 Dated 23-07-2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
NIT
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹3,180
31 Aug 2026
25 Jul 2026
18 Aug 2026
25 Jul 2026
17 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in trenchexcavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil (IN- Stretches). | 38.74 | cum | 479.3 | ₹18,568.08 |
| 2 | P/L IN POSITION C.C 1:5:10 MIX | 3.1 | cum | 4,826.5 | ₹14,962.15 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 MIX. Including 30% stone filling.(IN-Stretches). | 14.43 | cum | 5,733.6 | ₹82,735.85 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4MIX | 1.7 | cum | 6,591.25 | ₹11,205.13 |
| 5 | Cetring and shuttering including strutting, propping etc and removal of the formwork. | 63.57 | SQM | 286.35 | ₹18,203.27 |
| 6 | Add provision for Sign Board | 1 | no | 3,000 | ₹3,000 |
| 7 | Carriage of construction material(sand) | 8.63 | cum | 409.94 | ₹3,537.78 |
| 8 | Carriage of construction material(aggregate) 20 KM MT | 17.1 | cum | 409.94 | ₹7,009.97 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_1041644.xls
BOQ • 0.25 MB
exttt.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .