Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC 19 M G WORKS S BLOCK NEAR PONDY ENGINEERS PONDICHERRY | PONDICHERRY | PUDUCHERRY | 605001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.5 L+₹18,000 (5.42%)Rejected-Finance 36 151 E 25 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 02 | SALEM | TAMIL NADU | 621011 | L2 | Rejected-Finance l2 |
Tender Value
Refer Docs
EMD Value
₹3,600
Closing Date
13 Feb 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE MTPS II
CE MTPS-II
ES Circle - EM Division - Restoration of spare motor in Mill-G and Replacement of defective Mill motor with spare motor (if any of the mill motor failed within one year).
2024_EB_415396_1
OT62/2023-24
Open Tender
Electrical Works
Works
365 days
SEESMTPSII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,600
Yes
18 Mar 2024
30 Jan 2024
14 Feb 2024
30 Jan 2024
13 Feb 2024
30 Jan 2024
Amount
Restoration of spare Mill motor 3Ph, 3.3KV, 990KW, 210A/991 RPM in Mill-G. Charges for leading, lifting, transporting of spare motor from TG repair bay to mill repair bay and to respective mill G zone, lowering the motor by using required capacity tested wire rope slings & ‘D’-Shackles with help of existing 36 ton capacity electrical hoist etc… after inspection of motor bed bolt & nuts. (By leading, lifting, transporting and lowering the motor by using existing 36 Ton capacity TANGEDCO electrical hoist) Lifting of motor, placing at bed and tightening of foundation bolts, bed bolts etc., reassembling the protective shield of the main motor and the gear box coupling all spring pin bolt & nuts, rubber bushes and coupling guard etc., fabrication of required quantity of alignment dial gauge holding stands, under bowl to gear box assembly top, gear box coupling to motor coupling within our TANGEDCO alignment requirement by adjusting the gear box and motor and by using S.S. shims, reassembling the protective shield of the main motor and the gear box coupling all spring pin bolt & nuts, rubber bushes and coupling guard etc., termination of power cable, coupling the motor with gear box, Checking alignment and trial run and including consumables. (TANGEDCO will provide departmental lorry & Crane whenever required)
Failure replacement of 3Ph, 3.3KV, 990KW, 210A, 991 RPM Mill motor. Charges for disconnecting of power cable, De-coupling the motor from gear box and checking alignment, dismantling the coupling guard, Protective shield of the main motor and the gear box coupling all spring pin bolt & nuts, rubber bushes for de-coupling the motor and gear box etc., releasing of all motor bed bolt & nuts, leading the 1/3rd distance from its original position of motor, locking the required capacity tested wire rope slings & D-shackles etc… for shifting of gear box motor from mill to mill repair bay by using chain blocks & existing 30 ton capacity electrical hoist etc… (By leading, lifting, transporting and lowering the motor by using existing 36 Ton Capacity TANGEDCO electrical hoist), leading, lifting and positioning the fabricated special type puller over the old gear box coupling, locking the puller arrangement & releasing the existing coupling from the gear box by tightening the puller tie rod / hydraulic jacks etc., leading, lifting, transporting of released motor from mill repair bay to respective mill zone, lowering the motor by using required capacity tested wire rope slings & ‘D’-Shackles with help of existing 36 ton capacity electrical hoist etc… after inspection of motor bed bolt & nuts. (By leading, lifting, transporting and lowering the motor by using existing 36 Ton capacity TANGEDCO electrical hoist) Lifting of motor, placing at bed and tightening of foundation bolts, bed bolts etc., Charges for reassembling the protective shield of the main motor and the gear box coupling all spring pin bolt & nuts, rubber bushes and coupling guard etc…Charges for fabrication of required quantity of alignment dial gauge holding stands, under bowl to gear box assembly top, gear box coupling to motor coupling within our TANGEDCO alignment requirement by adjusting the gear box and motor and by using S.S. shims, reassembling the protective shield of the main motor and the gear box coupling all spring pin bolt & nuts, rubber bushes and coupling guard etc., termination of power cable, coupling the motor with gear box, Checking alignment and trial run and including consumables. (TANGEDCO will provide departmental lorry & Crane whenever required)
TAM AND CO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .