| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-AOC | ₹13.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹13.9 LRejected-AOC | ₹13.9 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | KANAGAVEL RATHINAM L1 | V.Balamurugan L2 |
|---|---|---|---|---|---|
| 1.01 | Picking the existing metal surface including all other labour charges etc., completed as per standard Specification | 344.85 | Cum | 23 ₹7,931.55 | 24 ₹8,276.40 |
| 1.02 | Earth Work excavation from borrow pits for filling in all classes of soils such as gravelly soil, hard stiff clay, stiff black cotton soil, hard red earth, murrams, gravel stone earth and earth mixed with 50% fair sized boulders | 10.13 | Cum | 140 ₹1,418.20 | 142 ₹1,438.46 |
| 1.03 | Collection supply & filling of red gravel from approved quarry including stacking charges and all other labour charges etc., complete as per standard specification | 37.62 | Cum | 436 ₹16,402.32 | 438 ₹16,477.56 |
| 1.04 | Providing and laying Spreading and Compacting graded stone aggregate wo Wet Mix Macadam (WMM) 100 mm thick including permixing the materials with water OMC etc | 104.5 | Cum | 2,494 ₹2.6 L | 2,498 ₹2.6 L |
| 1.05 | Applying Prime Coat using Emulsion (SS1) at the rate of 7kg / 10 sqm over the WMM Surface preparatory to anouther bituminous Construction over it which will be supplied depatmaetally at section stores cost of which will be recovered here with including conveyance of bitumen emulsion to actual work spot handling charges etc., | 1,045 | Cum | 86 ₹89,870 | 90 ₹94,050 |
| 1.06 | Applying tack coat using 2.5 Kgs of 10 sqm over WMM surfaces (treated with Primer) including cost of Bituminous emulsion RS-1 which will be wupplied departmentally at section stores cost of which will be recovered here with including converyance of bitumen emulsion to actual work spot handling charges for burshing cleaning and including labour charges for preparing the surface for layhing the actual work spot handling charges for Butiminous | 1,045 | Sqm | 20 ₹20,900 | 22 ₹22,990 |
| 1.07 | Macadam (grade II) 50 mm thick using VG30 providing Laying 50 mm consolidated thick bituminous macadam using 0.20 cum of 26.50 - 13.20 mm, 0.43 cum of 13.20-2.36 mm and 0.08cum of 2.36 mm & below size IRC metal with 34.04 kgs of VG30 grade bitumen for premixing per 10sqm charges and all other labour charges etc., complete as per standard specification | 52.25 | Sqm | 8,997 ₹4.7 L | 8,999 ₹4.7 L |
| 1.08 | Providing and laying Bituminous Concrete tio 25mm chick using 0.13 cum of 19.00- 9.50mm 0.17cum of 9.50-2.36mm bitumen for premixing per 10 sqm including cost and converyance of all materials to CMP site heating the birumen and aggreagte tocharges and all other labour charges etc., complete as per standard specification | 26.13 | Cum | 11,581 ₹3.0 L | 11,600 ₹3.0 L |
| 2.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,10,572.97 ₹2.1 L | 2,11,964.25 ₹2.1 L |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
2 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (VP) THENI
BLOCK DEVELOPMENT OFFICER (VP) THENI
STRENGTHENING THE BT ROAD FROM MULLAINAGAR MAIN ROAD PUDHU VAZHVU THITTAM TO PRAGALATHAN HOUSE AT ARANMANAIPUDUR
2026_RDTN_647426_1
3317/2024/P.6
Open Tender
Civil Works
90 days
THENI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹14,000
14 Feb 2026
27 Jan 2026
2 Feb 2026
27 Jan 2026
2 Feb 2026
27 Jan 2026
Picking the existing metal surface including all other labour charges etc., completed as per standard Specification
Earth Work excavation from borrow pits for filling in all classes of soils such as gravelly soil, hard stiff clay, stiff black cotton soil, hard red earth, murrams, gravel stone earth and earth mixed with 50% fair sized boulders
Collection supply & filling of red gravel from approved quarry including stacking charges and all other labour charges etc., complete as per standard specification
Providing and laying Spreading and Compacting graded stone aggregate wo Wet Mix Macadam (WMM) 100 mm thick including permixing the materials with water OMC etc
Applying Prime Coat using Emulsion (SS1) at the rate of 7kg / 10 sqm over the WMM Surface preparatory to anouther bituminous Construction over it which will be supplied depatmaetally at section stores cost of which will be recovered here with including conveyance of bitumen emulsion to actual work spot handling charges etc.,
Applying tack coat using 2.5 Kgs of 10 sqm over WMM surfaces (treated with Primer) including cost of Bituminous emulsion RS-1 which will be wupplied departmentally at section stores cost of which will be recovered here with including converyance of bitumen emulsion to actual work spot handling charges for burshing cleaning and including labour charges for preparing the surface for layhing the actual work spot handling charges for Butiminous
Macadam (grade II) 50 mm thick using VG30 providing Laying 50 mm consolidated thick bituminous macadam using 0.20 cum of 26.50 - 13.20 mm, 0.43 cum of 13.20-2.36 mm and 0.08cum of 2.36 mm & below size IRC metal with 34.04 kgs of VG30 grade bitumen for premixing per 10sqm charges and all other labour charges etc., complete as per standard specification
Providing and laying Bituminous Concrete tio 25mm chick using 0.13 cum of 19.00- 9.50mm 0.17cum of 9.50-2.36mm bitumen for premixing per 10 sqm including cost and converyance of all materials to CMP site heating the birumen and aggreagte tocharges and all other labour charges etc., complete as per standard specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 0.74 MB