Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
5 Jun 2021, 2:00 pmClosed
Executive Engineer Hydraulic Division Kishtwar
Executive Engineer Hydraulic Division Kishtwar
Please refer BOQ
2021_PHE_125408_1
e-NIT 12 of 2021-22
Open Tender
Civil Works
Item Rate
216 days
Kishtwar
Please refer NIT
3 documents required · 3 mandatory
₹600
Yes
Executive Engineer Hydraulic Division Kishtwar
₹4,000
Yes
7 Jun 2021
28 May 2021
5 Jun 2021
28 May 2021
5 Jun 2021
28 May 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc.(not exceeding 1.5 mtr in width ) and for shafts , wells, cesspits, and the like not exceeding 10 sqm on plan , 100% Akos
Earth work in Bulk excavation byMechnical means(Hydraulic Excavator) over areas (exceeding 30 in depth 1.50 Mtrs in width as well as 10 sqm on Plan.) Inclduing disposal of excavated earth lead upto 50 Mtrs and lift upto 1.50 Mtrs , as Directed by Enginee Incharge All Kind of Soil.
Dry Random rubble masonry with hard stone in foundation and plinth using nallah stone without bound stone (Full rate)
Dry Random rubble masonry with hard stone in foundation and plinth using nallah stone without bound stone (Labour rate)
Random Rubble Masonry with Hard Stone in Foundaton and Plinth Including Leveling up with cement concreate 1:6:12(Full Rate)Cement motar
Random Rubble Masonry with Hard Stone in Foundaton and Plinth Including Leveling up with cement concreate 1:6:12(Labour Rate)
Providing and laying in position cement concrate of specified grade including curing but excluding the cost of centring and shuttering -ALL work upto plinth level with (1:3:6) 20mm
Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Hand Packing of Stone in wire crates excluding cost of crates and stones
Supply of Stone .
Carriage of stone from source to site of work by manual labour/Ponies of an avg distance By Head Load 1.0 km
Carriage of stone from source to site of work by manual labour/Ponies of an avg distance By Head Load 0.50 km
Carriage of stone from source to site of work by manual labour/Ponies of an avg distance By Head Load 0.20 km
Carriage of stone from source to site of work by manual labour/Ponies of an avg distance By Head Load 0.10 km
Carriage of sand from source/Stacking to site of work by manual labour/Ponies of an avg distance By Head Load 1.0 KM
2.0 km by Head Load
3.0 km Head Load
4.0 km Head Load
Carriage of Cement from stacking site to site of work by manual labour/Ponies of an avg distance By Head Load 1.0 KM
Carriage of sand from source/Stacking to site of work by Mechnical Transpost of an avg distance 40 Km
Carriage of Cement fromLocal Market to Site of Work.avg Distance by Mechnical Transport 25 Km
40 km by MT
45 km by MT
Carriage of Cratefrom Div Store to Site of Work.avg Distance by Mechnical Transport 30 Km
35 km by MT
40 km by MT
Carriage of Crate from Stacking Site to Site of Work byHead Load. 1.0 Km
2.0 KM by Head Load
3.0 KM by Head Load
5.0 Km by Head Load
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand.
Supply of EC Bags
Riyaz Ahmed Saroori
M/S GULZAR MATOO AND CO. PROP. GULZAR HUSSAIN MATTOO
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .