Commissioner
The Commissioner, Hosur City Municipal Corporation
Providing Storm Water Drains Integrated with Waterbodies in Hosur City Municipal Corporation - Package-5
2026_MAWS_679332_5
3033/2024/E1/HOSUR CITY MUNICIPAL CORPORATION
Open Tender
Civil Works
730 days
Hosur City Municipal Corporation
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹75.2 L
Hosur City Municipal Corporation
4 Jun 2026
4 Jun 2026
8 Jul 2026
4 Jun 2026
8 Jul 2026
4 Jun 2026
23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Construction of Primary Drains
Cleaning Juliflora (Prosafis) Jungle including with uprooting and removing of Juliflora stumps | 4,344 | Sqm | - | - | Data - 1 |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete and as directed by the Engineer in charge. | 10,285 | Cum | - | - | Data - 2 |
| 3 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock (SDR), laterite, soft rock or kankar, not required blasting and as directed by the Engineer in charge. | 3,045 | Cum | - | - | Data - 3 |
| 4 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification and as directed by the Engineer in charge. | 475 | Cum | - | - | Data - 4 |
| 5 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Side Wall at 2.5m height | 929 | Cum | - | - | Data - 5 |
| 6 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Matt Concrete at 2.5m depth | 1,060 | Cum | - | - | Data - 6 |
| 7 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steelreinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the Engineer in charge. | 1,99,024 | Kg | - | - | Data - 7 |
| 8 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement and as directed by the Engineer in charge. | 2,058 | Cum | - | - | Data - 8 |
| 9 | Supplying and fixing of PVC pipe of 110mm dia (PVC Finolex or Equivalent with ISI Monongram with working pressure of 6Kg/Cm2) pipe weep hole at 15m c/cstaggered including cost od all materials complete etc., and as directed by the Engineer in charge. | 72 | Rm | - | - | Data - 9 |
| 10 | Removal of Excavated excess earth away from the site 3km including loading and transportation charges etc., complete and as directed by the Engineer in charge. | 11,108 | Cum | - | - | Data - 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 5.20 MB
BOQ_816276.xls
BOQ • 0.50 MB
bid5.pdf
Tender Documents • 3.00 MB
p5v2.pdf
Additional Documents • 18.28 MB
v51.pdf
Additional Documents • 20.70 MB
v52.pdf
Additional Documents • 17.37 MB
Download all tender documents and submit your bid