| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 CrAdmitted-Finance | ₹7.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.7 Cr+₹79.9 L (10.1%)Admitted-Finance | ₹8.7 Cr+₹79.9 L (10.1%) | L2 | Admitted-Finance |
| 3 | L3₹9.1 Cr+₹1.2 Cr (15.1%)Admitted-Finance RH1 2 PLOT NO 5 SECT 3 SHREE NITHYANAND CHS NEW PANVEL E NAVI MUMBAI 410206 MAHARASHTRA INDIA | NAVI MUMBAI | RAIGAD | MAHARASHTRA | 410206 | ₹9.1 Cr+₹1.2 Cr (15.1%) | L3 | Admitted-Finance |
| 4 | L4₹12.1 Cr+₹4.2 Cr (52.4%)Admitted-Finance | ₹12.1 Cr+₹4.2 Cr (52.4%) | L4 | Admitted-Finance |
| 5 | L5₹12.7 Cr+₹4.7 Cr (59.7%)Admitted-Finance | ₹12.7 Cr+₹4.7 Cr (59.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ENERINFRA PRIVATE LIMITED L9 | SHREE CHAMUNDA CONSTRUCTION L10 | ZENEX ENGINEERING PVT LTD L4 | MAS CONSTRUCTIONS L3 | M. P. Engineering Constructions (India) Pvt. Ltd. L8 | Vichitra Constructions Pvt Ltd L5 | S N fabricators L2 | ONIX ENCLAVES PVT LTD L1 | ANERI CONSTRUCTION PRIVATE LIMITED L6 | NOPS INFRASTRUCTURE PVT. LTD. L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00CARBON STEEL PIPES | |||||||||||||
| 2.00PIPELINE LAYING / INSTALLATION in all type of surface (Normal/built-up surface) "Receiving and taking over" as defined in the specifications, handing, loading, transportation and unloading of Owner supplied 3-Layer PE coated linepipes from Owner's designated stack-yard to Contractor's stock yard/workshop/work-site including preliminary activities, preparation of drawings, wherever required for crossing etc. including handling, stacking, stringing on the pipeline Right-of-Use/ pipeline route alignment, carrying out inspection of company supplied materials including linepipes at the time of taking over, laying/ installation of coated linepipes, associated burried valves, barred tees, insulating joints, flanges & fittings of all sizes, thickness & ANSI class rating and accessories as per specification wherever required depending on site condition including execution of all works, "taking over", handling , including loading and unloading, transportation of Owner supplied materials other than linepipe from Owner's designated place (s) of issue to work site, | |||||||||||||
| 3.00additional lands required for Contractor's storage, fabrication, access for construction, procurement and supply of all materials (except Owner supplied materials), consumables, equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works, aquistion of ROU/ROW for laying of pipeline from HDD Exit and entry point to Tie in Point of existing Pipeline/ ROU, ready for commissioning of pipeline as per drawings, specifications, other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works: | |||||||||||||
| 4.00Surveying of route and detours required at the time of execution including marking the same in topographical sheet, preparation of construction drawings showing survey details, and submit same to Owner for review / approval. | |||||||||||||
| 5.00Staking and installation of construction markers, clearing, fencing, grubbing, cutting of trees, full filling all the requirements of vNopsus statutory/ environment authorities to the entire satisfaction of concerned authorities, grading of work area. Shifting of all obstruction within the ROU/ Pipeline route alignment viz. electrical lines/ poles, telephone line / poles, etc. coordination with concerned authorities and obtain permissions from these authorities. | |||||||||||||
| 6.00Trenching to all depths by excavation in all types of soils including soft/ hard rock and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the Steel pipeline and MDPE as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0m measured from top of pipeline coating to the top of undisturbed surface of the soil or as per SCC/ OISD - 141 / 226, whichever is higher]. Dewater of trenches if required as per site condition. | |||||||||||||
| 7.00Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation / handling. | |||||||||||||
| 8.00Stringing of line pipes along pipeline trench / ROU on straw / sand / soft soil bags including supply of bags and its filling materials. | |||||||||||||
| 9.00Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X-ray and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of weld joints found defective by Engineer-in-Charge, carrying out re-radiography and other tests as required on repaired joints. | |||||||||||||
| 10.00Carrying out installation of carrier line pipe at all minor crossing viz. carttrack, pathway, water bodies etc. at designated depth by open cut (except at crossing by HDD method). | |||||||||||||
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
27 Mar 2026, 3:00 pmClosed
GM C and P
Pride Purple Coronet, 2nd Floor, Baner Road, Baner, Pune - 411045
TENDER FOR LAYING AND CONSTRUCTION OF U/G STEEL PIPELINE and ASSOCIATED WORKS FROM HAROHALLI TO THE BAMUL PLANT IN THE RAMANAGARA GA.
2026_MNGL_269791_1
MNGL/CP/2025-26/151
Open Tender
Miscellaneous Works
Works
300 days
Ramanagara GA
As per tender
17 documents required · 17 mandatory
₹0
₹2 L
Yes
Online / MNGL office
27 Apr 2026
6 Mar 2026
30 Mar 2026
6 Mar 2026
27 Mar 2026
6 Mar 2026
13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CARBON STEEL PIPES | - | - | - | - |
| 2 | PIPELINE LAYING / INSTALLATION in all type of surface (Normal/built-up surface)
"Receiving and taking over" as defined in the specifications, handing, loading, transportation and unloading of Owner supplied 3-Layer PE coated linepipes from Owner's designated stack-yard to Contractor's stock yard/workshop/work-site including preliminary activities, preparation of drawings, wherever required for crossing etc. including handling, stacking, stringing on the pipeline Right-of-Use/ pipeline route alignment, carrying out inspection of company supplied materials including linepipes at the time of taking over, laying/ installation of coated linepipes, associated burried valves, barred tees, insulating joints, flanges & fittings of all sizes, thickness & ANSI class rating and accessories as per specification wherever required depending on site condition including execution of all works, "taking over", handling , including loading and unloading, transportation of Owner supplied materials other than linepipe from Owner's designated place (s) of issue to work site, | - | - | - | - |
| 3 | additional lands required for Contractor's storage, fabrication, access for construction, procurement and supply of all materials (except Owner supplied materials), consumables, equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works, aquistion of ROU/ROW for laying of pipeline from HDD Exit and entry point to Tie in Point of existing Pipeline/ ROU, ready for commissioning of pipeline as per drawings, specifications, other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works: | - | - | - | - |
| 4 | Surveying of route and detours required at the time of execution including marking the same in topographical sheet, preparation of construction drawings showing survey details, and submit same to Owner for review / approval. | - | - | - | - |
| 5 | Staking and installation of construction markers, clearing, fencing, grubbing, cutting of trees, full filling all the requirements of vNopsus statutory/ environment authorities to the entire satisfaction of concerned authorities, grading of work area. Shifting of all obstruction within the ROU/ Pipeline route alignment viz. electrical lines/ poles, telephone line / poles, etc. coordination with concerned authorities and obtain permissions from these authorities. | - | - | - | - |
| 6 | Trenching to all depths by excavation in all types of soils including soft/ hard rock and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the Steel pipeline and MDPE as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0m measured from top of pipeline coating to the top of undisturbed surface of the soil or as per SCC/ OISD - 141 / 226, whichever is higher]. Dewater of trenches if required as per site condition. | - | - | - | - |
| 7 | Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation / handling. | - | - | - | - |
| 8 | Stringing of line pipes along pipeline trench / ROU on straw / sand / soft soil bags including supply of bags and its filling materials. | - | - | - | - |
| 9 | Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X-ray and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of weld joints found defective by Engineer-in-Charge, carrying out re-radiography and other tests as required on repaired joints. | - | - | - | - |
| 10 | Carrying out installation of carrier line pipe at all minor crossing viz. carttrack, pathway, water bodies etc. at designated depth by open cut (except at crossing by HDD method). | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.21 MB
Tender_Bamul_Ramanagara_Vol_II.pdf
Tender Documents • 3.51 MB
Tender_Bamul_Ramanagara_Vol_III.pdf
Tender Documents • 11.56 MB
Tender_Bamul_Ramanagara_Vol_I.pdf
Tender Documents • 2.42 MB
BOQ_314389.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .