Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | ₹9.8 L | L1 | Accepted-AOC AGGREMENT WITH L1 |
| 2 | L2₹9.9 L+₹3,306.99 (0.34%)Rejected-AOC | ₹9.9 L+₹3,306.99 (0.34%) | L2 | Rejected-AOC AGGREMENT WITH L1 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S R.K. GUPTA AND SONS HUF L1 | Sanjay Kumar Contractor L2 |
|---|---|---|---|---|---|
| 1.00 | Dismentling of B/W work & stacking of material within 60 mtrs including T & P, labour etc. complete | 14.58 | Cum | 518 ₹7,552.44 Lowest | 518 ₹7,552.44 Lowest |
| 2.00 | Dismentling of R.B./R.C.C. work & stacking of material within 60 mtrs including T & P, labour etc. complete | 5.42 | Cum | 625 ₹3,384.38 Lowest | 625 ₹3,384.38 Lowest |
| 3.00 | Earth work in excavation of foundation including all lead, lift and manual compaction. | 123.93 | Cum | 100 ₹12,393 Lowest | 100 ₹12,393 Lowest |
| 4.00 | P.C.C. 1:3:6 (M10) in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 6.15 | Cum | 5,200 ₹31,980 Lowest | 5,200 ₹31,980 Lowest |
| 5.00 | Providing and laying RCC 1:1.5:3 (M20) with crushed stone ballast and coarse sand with cost of material including T&P, labour etc. as per directed by Engineer in charge. | 62.6 | Cum | 7,010 ₹4,38,855.79 | 7,000 ₹4,38,229.75 Lowest |
| 6.00 | Centering and shuttering for R.C.C. work including placing in position. | 164.98 | Sqm | 810 ₹1,33,632.99 Lowest | 830 ₹1,36,932.57 |
| 7.00 | P.C.C. 1:2:4 (M15) in wearing coat and bed flooring with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 3.44 | Cum | 5,600 ₹19,269.6 Lowest | 5,728 ₹19,710.05 |
| 8.00 | Painting with synthetic enamel paint of approved brand & manufacture of required colour to given an even shade . In two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture . | 20.21 | Sqm | 177.15 ₹3,581.09 Lowest | 177.15 ₹3,581.09 Lowest |
| 9.00 | Supplying & fixing of P.V.C. Pipe 75 mm dia and 0.50 mtr. longwith all cost of material, T&P and labour complete. | 8 | Nos. | 126.5 ₹1,012 Lowest | 126.5 ₹1,012 Lowest |
| 10.00 | S/Fixing wheel guard size of 100x150x80 mm with cost of material including T&P labour etc complete. | 4 | Nos. | 1,400 ₹5,600 Lowest | 1,448.25 ₹5,793 |
Tender Value
₹9.9 L
EMD Value
₹19,840
Closing Date
1 Nov 2025, 11:00 amClosed
EE MDGC MUZAFFARNAGAR
EE MDGC MUZAFFARNAGAR
Reconstruction VRB of Makhyali Dy at Km 12.872
2025_UPIDC_1076566_30
TN-04/EE/2025-26
Open Tender
Civil Works
Piece-work
60 days
as per tender notice
as per tender notice
3 documents required · 3 mandatory
₹854
₹19,840
19 Sept 2026
27 Oct 2025
1 Nov 2025
27 Oct 2025
1 Nov 2025
27 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.36 MB
Tendernotice_2.pdf
PDF • 6.55 MB
BOQ_1989717.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .