| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.7 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹72.3 L+₹3.8 L (5.59%)Rejected-Finance 2ND FLOOR 15 BHULLAR AVENUE ADJOINING SBI FATEHGARH CHURIAN ROAD AMRITSAR PUNJAB 143001 | AMRITSAR | AMRITSAR | PUNJAB | 143001 | L2 | Rejected-Finance Not being L1 | |
| 3 | Rejected-Technical 78 B PROFESSOR S COLONY TILAK NAGAR AMRITSAR 143001 | AMRITSAR | PUNJAB | 143001 | - | Rejected-Technical Not eligble |
Tender Value
₹56.7 L
EMD Value
₹1.1 L
Closing Date
19 Jul 2023, 5:00 pmClosed
AGM (Engg.Civil),
AGM (E-C), BCAS office Building, Engineering wing, AAI, Amritsar Pin-143101.
Extension and Resurfacing of existing Apron and Taxi Track at Amritsar Aviation Club SGRDJI Airport Amritsar.
2023_AAI_158833_1
AAI/ASR/Engg.(C)/W-231
Open Tender
Civil Works
Item Rate
90 days
Amritsar Airport
Scanned copy of the pan card, GST registration, valid EPF and ESIC registration, Form A details of Similar works, Form B Financial information, Form C net worth, undertaking regarding blacklisting of firm and Minimum wages, etc.as per NIT.
12 documents required · 12 mandatory
₹1,180
₹1.1 L
10 Apr 2024
26 Jun 2023
20 Jul 2023
26 Jun 2023
19 Jul 2023
26 Jun 2023
26 Jun 2023 - 3 Jul 2023
Amount
Earth work in excavation in all kinds of soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections and transporting and un-loading the surplus soil within all leads and lead upto 1 km complete as per directions of Engineer-In-charge.
Consolidation of sub grade with power road roller of 8-12 tonne capacity including making good the undulations etc with earth or quarry spoils etc. and rerolling the subgrade.
Preparation of granular sub-base by providing close graded material (Grade-III/IV), conforming to specifications mixing in a mechanical mix plant at OMC, carriage of mixed material by mechanical transport to work site, for all leads and lifts, spreading in uniform layers of specified thickness with mechanical means including neatly leveling & dressing on prepared surface and compacting with vibratory power roller to achieve the desired density, complete and as per direction of Engineer-in-charge.
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by mechanical transport to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base /base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
Providing and applying tack coat using hot straight run bitumen of Viscosity grade VG-10 (80/100) including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning & preparing the existing road surface as per specifications: a) 0.75 kg/sqm. on W M M. NOTE :- i) Bitumen: For the purpose of tendering, the Contractor may base his rate on the assumption that the bitumen content of the mixture shall be 0.75 Kg/ sqm of bitumen. If the actual quantity of bitumen required to be used as a result of the Mix Design is found different from the quantity of bitumen that is assumed above, necessary adjustment in the cost of extra/short bitumen used shall be made as per technical specifications attached and Schedule-F under clause 10 CA (also reffer foot note), or purchase price of bitumen at the nearest IOC/HP/BP/Govt. Refinery, which ever is lower. The procurement price of bitumen (Basic rate plus excise duty/ sales tax/ GST & transportation charges) shall be ascertained by the Engineer-in-charge on submission of documentary proof by the contractor. The rate of bitumen decided by the Engineer-in-charge shall be final & binding. Except adjustment in cost due to variation in bitumen consumption as stated above, no other factor whatsoever shall be considered for adjustment in quoted rates.
Providing and applying tack coat using hot straight run bitumen of Viscosity grade VG-10(80/100) including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning & preparing the existing road surface as per specifications. b) 0.60 kg/sqm. on concrete surface. NOTE :- i) Bitumen: For the purpose of tendering, the Contractor may base his rate on the assumption that the bitumen content of the mixture shall be 0.6 Kg/ sqm of bitumen. If the actual quantity of bitumen required to be used as a result of the Mix Design is found different from the quantity of bitumen that is assumed above, necessary adjustment in the cost of extra/short bitumen used shall be made as per technical specifications attached and Schedule-F under clause 10 CA (also reffer foot note), or purchase price of bitumen at the nearest IOC/HP/BP/Govt. Refinery, which ever is lower. The procurement price of bitumen (Basic rate plus excise duty/ sales tax/ GST & transportation charges) shall be ascertained by the Engineer-in-charge on submission of documentary proof by the contractor. The rate of bitumen decided by the Engineer-in-charge shall be final & binding. Except adjustment in cost due to variation in bitumen consumption as stated above, no other factor whatsoever shall be considered for adjustment in quoted rates.
Providing and applying tack coat using hot straight run bitumen of Viscosity grade VG-10 (80/100) including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning the preparing the existing road surface as per specifications. b) 0.50 kg/sqm. on black topped surface. NOTE :- i) Bitumen: For the purpose of tendering, the Contractor may base his rate on the assumption that the bitumen content of the mixture shall be 0.5 Kg/ sqm of bitumen. If the actual quantity of bitumen required to be used as a result of the Mix Design is found different from the quantity of bitumen that is assumed above, necessary adjustment in the cost of extra/short bitumen used shall be made as per technical specifications attached and Schedule-F under clause 10 CA (also reffer foot note), or purchase price of bitumen at the nearest IOC/HP/BP/Govt. Refinery, which ever is lower. The procurement price of bitumen (Basic rate plus excise duty/ sales tax/ GST & transportation charges) shall be ascertained by the Engineer-in-charge on submission of documentary proof by the contractor. The rate of bitumen decided by the Engineer-in-charge shall be final & binding. Except adjustment in cost due to variation in bitumen consumption as stated above, no other factor whatsoever shall be considered for adjustment in quoted rates.
Providing, laying & fixing of self adhesive glass Fibre reinforcement grid of High Modulus Fibre Glass of Mesh size not exceeding 12.5mm x12.5mm manufactured by Maccaferri, Saint Gobain, Techfab ( India ) or equivalent.The self adhesive glass Fibre reinforcement after laying over the Runway Pavement shall be pressed fully with a rubber tired roller and glued to pavement surface . The grid being self adhesive does not require tack coat. The longlitudinal overlap should not be less than 250mm and transverse overlap i.e. at the end of the roll should not be less than 150mm . The items should be completed in all respect , to the satisfaction of Engineer-In-Charge.
Providing and laying of Hot Mix Dense Bituminous Macadam(DBM) using crushed stone aggregate of quality, size and grading as specified and 2% cement by weight of aggregates as filler of quality as specified and Viscosity Grade (VG-30) Bitumen (supplied in bulk) in proportions as per job mix formula and laid to specified levels, grade and camber as per specification, drawings and as directed by the Engineer-in-Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction, strength, surface accuracy complete [for tendering purpose VG bitumen of grade (VG-30) shall be taken as 95 kg/m3 of mix supplied in bulk produced by Govt. Refineries and 2% cement by weight of aggregates as filler material]. NOTE: i) Bitumen: For the purpose of tendering, the Contractor may base his rate on the assumption that the bitumen content of the mixture shall be 95 Kg of bitumen per Cum of total mix compacted to 100% density in Marshall mould. If the actual quantity of bitumen required to be used as a result of the Mix Design is found different from the quantity of bitumen that is assumed above, necessary adjustment in the cost of extra/short bitumen used shall be made as per technical specifications attached and Schedule-F under clause 10 CA (also reffer foot note), or purchase price of bitumen at the nearest IOC/HP/BP/Govt. Refinery, which ever is lower. The procurement price of bitumen (Basic rate plus excise duty/ sales tax/ GST & transportation charges) shall be ascertained by the Engineer-in-charge on submission of documentary proof by the contractor. The rate of bitumen decided by the Engineer-in-charge shall be final & binding. Except adjustment in cost due to variation in bitumen consumption as stated above, no other factor whatsoever shall be considered for adjustment in quoted rates. ii) Cement: For the purpose of tendering, the contractor may base his rate assuming 2% cement as filler by weight of aggregates. If the actual quantity of cement required to be used, as per the Design Mix, is found to be different from the quantity of cement assumed above, necessary adjustment in cost of extra/ short cement shall be made. iii) The cost adjustment for the extra/ short use of cement or bitumen to be used as a result of Mix Design shall be inclusive of contractor profit & overheads @ 15% & plus labour cess @ 1 %. The rate of cement applicable shall be the base price of cement as issued by DG (W) or concerned zonal chief Engineer, CPWD or as decided by ED (Engg) if above rates not declared by CPWD as on the last stipulated date of receipt of tender i/c extension if any or the purchase price which ever is lower.
Providing and laying of Hot Mix Semi Dense Asphaltic Concrete (SDAC) using crushed stone aggregate of quality, size and grading as specified and 2% cement by weight of aggregates as filler of quality as specified and Viscosity Grade (VG-30) Bitumen (supplied in bulk) in proportions as per job mix formula and laid to specified levels, grade and camber as per specification, drawings and as directed by the Engineer-in-Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction, strength, surface accuracy complete [for tendering purpose VG bitumen of grade (VG-30) content shall be taken as 114 kg/m3 of mix supplied in bulk produced by Govt. Refineries and 2% cement by weight of aggregates as filler material]. NOTE: i) Bitumen: For the purpose of tendering, the Contractor may base his rate on the assumption that the bitumen content of the mixture shall be 114 Kg of bitumen per Cum of total mix compacted to 100% density in Marshall mould. If the actual quantity of bitumen required to be used as a result of Mix design is found different from the quantity of bitumen that is assumed above, necessary adjustment in the cost of extra/short bitumen used shall be made as per technical specifications attached and schedule-F under clause 10 CA (also reffer foot note), or purchase price of bitumen at the nearest IOC/HP/BP/Govt. Refinery, whichever is lower. The procurement price of bitumen (Basic rate plus excise duty/sales tax/GST & transportation charges) shall be ascertained by the Engineer-in-charge on submission of documentary proof by the contractor. The rate of bitumen decided by the Engineer-in-charge shall be final and binding. Except adjustment in cost due to variation in bitumen consumption as stated above, no other factor whatsoever shall be considered for adjustment in quoted rates. ii) Cement: For the purpose of tendering, the contractor may base his rate assuming 2% cement as filler by weight of aggregates. If the actual quantity of cement required to be used, as per the design mix, is found to be different from the quantity of cement assumed above, necessary adjustment in cost of extra/ short cement shall be made. iii) The cost adjustment for the extra/short use of cement or bitumen to be used as a result of Mix design shall be inclusive of contractor profit & over heads @ 15% and plus labour cess @ 1%. The rate of cement applicable shall be the Base price of cement as issued by DG (W) or concerned Zonal Chief Engineer, CPWD or as decided by ED (Engg) if above rates not declared by CPWD as on the last stipulated date of receipt of tender i/c extension if any or the purchase price wichever is lower.
Cleaning of existing joints (expansion, dummy and construction joints) by removing sealing compound by kerosen oil drying with blow lamp and filling with bitumen mix filler of proportion 80kg of hot straight run bitumen 80/100 grade, 1 kg of cement and 0.25 cum of coarse sand all complete etc. as per direction of Engineer In-Charge.
Painting Runways/ Taxi Track/Apron marking with adequate no.of coats to give uniform finish with road marking paint of superior make (Nerolac, Berger or equivalent) as approved by Engineer-in-Charge, including cleaning the surface of all dirt, scales, oil,grease and other foreign material etc. and lining out complete. a)New Work (Two or more coats)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Jagson Constructions Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .