Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 19 A DURGA BARI SADAR BAZAR MEERUT MEERUT MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | Admitted-Finance |
Tender Value
₹4.6 L
EMD Value
₹5,000
Closing Date
10 May 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC ALIGARH
LAL DIGGI ALIGARH
Replacement of Gasket of 40 MVA, 132/33 KV TAL make) T II at 132 KV Substation Etah under ETD Mainpuri
2021_UPTCL_553592_4
ETC-122/2020-21
Open Tender
Electrical Works
Item Rate
15 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE ETC ALIGARH
₹5,000
13 May 2021
1 May 2021
10 May 2021
1 May 2021
10 May 2021
1 May 2021
150 days
Carriage of oil tank of capacity 20 KL from available substations to 132 KV S/S Nidualikalan and same from 132 KV S/S Kurawali to available substation including loading and unloading(Approx. distance 100 km).
Draining out f complete oil from T/F in empty oil tank (capacity 18.9 KL)
Dismantling of all parts of 40 MVA T/F BBL make HV/LV neutral bushing from tranformer main tank, radiators, conservator tank, explosing vent pipe, oil pipe, bucholz relay, oil pipe line, cooling fans, opening of electrical connection and proper blanking of open space for replacement of new gaskets between conservator to main tank and OLTC etc. As per required size of good quality rubersided of KONIKA/TRABROZE make at following place of transformer.
Attending leakage of TAL make 132/33 KV 40 MVA T/F by replacement of old & damaged gasket of following.
HV side bushing ( Top & bottom portion) of RY and B Phase.
LV/Netural bushing (Top & Bottom portion)
Explosion/PRV of the T/F Gasket
Radiator pipe flange gasket.
Radiator valve gasket.
Radiator air plug gasket.
Inspection cover HV/LV side gasket.
Main tank top cover gasket involving the work of opeing nut & bolts of the top cover plate (Lifting the cover plate and winding by 20 cm) from its present level, cleaning the oil and removing the old damaged gasket by scraping and cleaning the top surface, fabrication of top cover gasket as per top surface made from cork sheet joining and punching holes fitting on top surface, fitting the top cover plate and tightening the nut & bolts for proper completion of work.
Conservator tank gasket.
Equaliser/Header joint gasket.
Oil termperature instrument and winding temperature.
OLTC top bottom gasket.
OLTC Gear mechanism gasket.
OLTC Indication glass gasket.
Conservator drain valave gasket.
Buchholz relay gasket
Sampling valve gasket.
Drain valve gasket.
Gasket for indication plate bushing.
Gasket for magnetic oil level gusge.
Air release teflon washer of radiator cap & bushing.
Opening & fixing of all HV & LV side jumpers and HV & LV side netural bushing connection.
Dismantling & fitting of radiators coolling fans.
Complete erection of 40 MVA T/F, HV/LV bushing, turrst pipe line of T/F & conservator tank, PRV, OLTC, Radiators, Oil cooling system tightening of all nut & bolts to complete. The erection with all requred T&P.
Flushing of main tank core and winding by hot centrifuged T/F oil.
Complete evacuation of 40 MVA transformer main tank and filling of Dry Nitrogen/dry air of dew point-50C better in vacuum up to pressure of 0.25Kg./Cm2 and the again evacuating the transformer tank after required time interval (approx 12/24 hrs.) using centrifuging machine the work shell including connecting pipe of machine as required measuring due point values of N2/Dry Air after every cycle till the required value is achieved. Dry Air plant provided by contractor.
Filling of transformer oil into T/F from 20 KL oil tank.
Centrifuging of oil for achieving oil paramenters as per latest norms including testing of T/F oil as per techincal specification.
Creating of vaccum of 40 MVA T/F for 24 Hrs. at 760 mm per Hg.
Perfect Power Transformer Associates
M/s S.S. Refregeration
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .