| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.5 LAccepted-AOC | ₹29.5 L | L1 | Accepted-AOC Low |
| 2 | L2₹29.5 LRejected-Finance | ₹29.5 L | L2 | Rejected-Finance Quoted higher than estimate rate |
| Sl No | Description | Qty | Unit | Sathyanarayanan K L1 | S.Amaresan L2 |
|---|---|---|---|---|---|
| 1.01Side drainage | |||||
| 1.02 | Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B | 251.54 | Cum | 263 ₹66,155.02 | 265 ₹66,658.10 |
| 1.03 | Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete. | 47.7 | Cum | 5,345 ₹2.5 L | 5,346 ₹2.6 L |
| 1.04 | Centering and shuttering for sides including cost and convayance and labour charges etc complete. | 949.2 | Sqm | 547.25 ₹5.2 L | 550 ₹5.2 L |
| 1.05 | Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete | 109.16 | Cum | 6,641 ₹7.2 L | 6,642 ₹7.3 L |
| 1.06 | Plastering with Cement Mortar 1:4 (one cement and five sand) 20 mm. thick in all floors including curing etc., complete complying with standard specification and as directed | 202.5 | Sqm | 580 ₹1.2 L | 582 ₹1.2 L |
| 1.07CC Pavement | |||||
| 1.08 | Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B | 17.85 | Cum | 131 ₹2,338.35 | 132 ₹2,356.20 |
| 1.09 | Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete. | 64.6 | Cum | 5,345 ₹3.5 L | 5,346 ₹3.5 L |
| 1.10 | Centering and shuttering for sides including cost and convayance and labour charges etc complete. | 131.75 | Sqm | 361 ₹47,561.75 | 362 ₹47,693.50 |
Updated dates
Tender Value
₹29.8 L
EMD Value
₹29,800
Closing Date
2 Mar 2026, 3:00 pmClosed
Block Development Officer (V.Pt), Arni
Block Development Office (V.Pt), Arni
Providing Side Drainage with CC Pavement at New Street Reach-II in E.B Nagar at Sevoor Panchayat.(Drain-450m and CC Road-170m) in Arni Block under Peri Urban Panchayat scheme from 2022-2023 to 2025-2026.
2026_RDTN_664473_1
Pro.No.215/2026/A5 Date 13.02.2026 ARNI01
Open Tender
Civil Works - Roads
30 days
Arni
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹29,800
13 Mar 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
Side drainage
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete.
Centering and shuttering for sides including cost and convayance and labour charges etc complete.
Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete
Plastering with Cement Mortar 1:4 (one cement and five sand) 20 mm. thick in all floors including curing etc., complete complying with standard specification and as directed
CC Pavement
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete.
Centering and shuttering for sides including cost and convayance and labour charges etc complete.
Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete
Provision for Bitumen pad
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_797837.xls
BOQ • 0.40 MB
Tenderdocument.pdf