Loading…
Loading…
Tender Value
₹3.0 Cr
EMD Value
₹3.0 L
Closing Date
23 Dec 2025, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
ELECT G
13 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of "V/N" or "V" whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. Similar Nature of Work are as follows for this work:- 1) Erection & commissioning of 11/33 kV overhead lines. 2) Installation & commissioning of 11/33 kV Substation. 3) Installation & commissioning of 33kV Substation. 4) Laying & Commissioning of electrical cabling works of 11/33kV. 5) Any above work or combination of (i) to (iv) above.
15 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested by which they/he is qualifying the Qualifying criteria mentioned in the tender document. It will not be obligatory on the part of tender committee to scrutinize beyond the submitted document of tenderer as far as his qualification for the tender is concerned. The railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the railway there under.
No post tender correspondence shall be entertained after closing of tender even Suo moto post tender letters of the tenderers shall be treated as null/void.
The tenderers are required to observe the website to find out if any correction slips issued subsequent to uploading of the Tender . Railway reserves the right to make any additions/alterations to the tender uploaded and issue corrigendum to the same effect. In case the tenderer fails to take note of the above corrigendum, the additions and alterations entered/effected in the corrigendum shall be binding upon the tenderer and no claim what so ever will be entertained by Railway.
The tenderer should upload the documents carefully. The documents uploaded by tenderer should be clearly visible and in legible format.
Indian Railways Standard General Conditions of contract 2022 along with correction slips corrected up to date of closing of tender and the attached documents are part of the tender document.
The offers which are incomplete, without supporting documents, unsigned, conditional, will be summarily rejected.
As per letter No. 2022/CE-I/CT/GCC/Correspondence/ New Delhi, dated 14.05.2024 "On IREPS Module , a facility has already been created for online submission of Annexure-V. Therefore, the provision of downloading of Annexure-V of GCC & uploading of physically signed Annexure-V by tenderer had been discontinued on IREPS"
Electrical Work in Jabalpur division (i) Improvement of lighting arrangement by providing octagonal pole , Highmast with replacement of LT Supply panel including prepaid meter in JBP Div. (ii) Upgradation of Power Supply Underground Cable (iii) Modificaion Upgradation of substation at JBP.
JBP-L-T-No-33-2025~WCR
JBP-L-T-No-33-2025
Open
Works - General
12 Months
Jabalpur, Madhya Pradesh
₹0
₹3.0 L
23 Dec 2025
1 Dec 2025
9 Dec 2025
223 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,45,24,846.84 | ||
| details. | Breakup for | — | — | ||
| Supply & erection OF 5MTRS OCTAGONAL POLE along with base plate , earhing , 8 SWG WIRE , single arm and foundation along with arm for holding fitting make- Bajaj,crompton, Surya, or simillar make Approval will be required by comptent authority before supply | — | — | — | 17,16,778.49 | |
| details. | Breakup for | — | — | ||
| Supply and erection of 4 mtrs octagonal pole of alongwith baseplate, foundation, earthing , 8 SWG GI wire and single arm for holding fittings make- Bajaj,crompton, Surya, or simillar make Approval will be required by comptent authority before supply | — | — | — | 41,82,429 | |
| details. | Breakup for | — | — | ||
| Supply, erection, testing & commissioning of 36 W LED street light fittings suitable for 230V AC, 50 Hz comprise a single piece deep drawn alluminium housing IP-65 colour temp 5500- 7000K with connectionetc. with suitable fixtures and clamps etc Make- Bajaj, Surya, Havells, crompton or Similar make | — | — | — | 8,10,065.27 | |
| details. | Breakup for | — | — | ||
| LT outdoor panel (water proof) made/fabricated out of 1.6 mm MS sheet duly painted with powder coated , IP-65, IK-09 having suitable copper bus bars with sleeves , indicating lamps, multifunction meter , Gland ,Lugs, Foundation , earthing , Door Lock arrangment, pad lock, suitable MS channel , SWG wire etc. Incoming 100 A, 4 pole 25kA MCCB (2 nos, 1 as spare) and outgoing 5 x 40A 4 pole MCCB 25kA + 5 x 63A 4 pole MCCB 25kA. All the MCCBs shall be of legrand , ABB, L&T, Schnider, Hager,Simens make or equivalent.(Dismantling of existing panel, structre, disconnection , reconnection of cable and released material tranported to nearest depot by contractor)Design of panel will be approved by comptent authority before supply, | — | — | — | 13,98,338.7 | |
| details. | Breakup for | — | — | ||
| LT power panel outdoor type fabricatedmade out of 2mm MS sheet powder coated paint having copper busbars of size 50 x 8 x suitable length to cater a load of 400 Amps. The incoming shall have 2 x 400Amps MCCB 4 pole (25 KA) andoutgoing with 6 x 200 A 4P MCCB (25KA) + 2 x 160 A 4P MCCB. The panel shall have onemultifunction meter. All MCCB will be 4 pole, o of make ABBorequivalent. The panel shall have channels at the base of suitable size. All the MCCBs shall be of legrand , ABB, L&T, Schnider, Hager,Simens make or equivalent.(Dismantling of existing panel, structre, disconnection , reconnection of cable and released material tranported to nearest depot by contractor)Design of panel will be approved by comptent authority before supply,2 mm MS sheet duly painted with powder coated , IP-65, IK-09 having suitable copper bus bars with sleeves , indicating lamps, multifunction meter , Gland ,Lugs, Foundation , earthing , Door Lock arrangment, pad lock, suitable MS channel , SWG wire etc | — | — | — | 7,31,935.6 | |
| details. | Breakup for | — | — | ||
| LT power panel outdoor type fabricated approx size 1.25x1.25x.0.4 mtrs made out of 2 mm MSsheet powder coated paint having copper busbar of size 50x6x suitable legth .The incoming shallhaving 2x250 A MCCB 4 pole 25 KA and outgoing with 2x200 A MCCB 4 pole plus2x100 A 4poleMCCB & 2x63 A MCCB .The panel shall have one multifunctional meter.All MCCB will be 4 pole make Legrand, ABB L&T or equivalent.The panel shall have channels at the baseof suitable size.The erection is to be done on suitable foundation of cement concrete mixtures. (Dismantling of existing panel, structre, disconnection , reconnection of cable and released material tranported to nearest depot by contractor)Design of panel will be approved by comptent authority before supply,2 mm MS sheet duly painted with powder coated , IP-65, IK-09 having suitable copper bus bars with sleeves , indicating lamps, multifunction meter , Gland ,Lugs, Foundation , earthing , Door Lock arrangment, pad lock, suitable MS channel , SWG wire etc | — | — | — | 4,08,870 | |
| details. | Breakup for | — | — | ||
| Supply erection, testing, comssioning of MDB One way enclosure for independent mounting of MCCB 1x63A 4 pole of lregrand , Simens, hager, ABB, L&T or equivailent IP-65, IK-09 , Design of panel will be approved by comptent authority before supply, | — | — | — | 22,105.1 | |
| details. | Breakup for | — | — | ||
| "LT outdoor panel made/fabricated out of 1.6 mm MS sheet duly painted having suitablecopper bus bars, indicating lamps, multifunction meter etc. Incoming 63 A MCCB 4 pole 2 and outgoing 6 x 20/25 A MCB (Dismantling of existing panel, structre, disconnection , reconnection of cable and released material tranported to nearest depot by contractor)Design of panel will be approved by comptent authority before supply,2 mm MS sheet duly painted with powder coated , IP- 65, IK-09 having suitable copper bus bars with sleeves , indicating lamps, multifunction meter , Gland ,Lugs, Foundation , earthing , Door Lock arrangment, pad lock, suitable MS channel , SWG wire etc" | — | — | — | 1,39,644.24 | |
| details. | Breakup for | — | — | ||
| Excavation of Cable trench in Cement Concrete/RCC/ Track and laying of cable, The cable shall be supplied free of cost by Rly's which shall have to be transported by the contractor from Rly. depot,JBP to the site (size 300 mm width x1000mm depth and making of original arrangements after laying of cable.) | — | — | — | 3,48,915 | |
| details. | Breakup for | — | — | ||
| Pucca Cable trench: Construction of cable trench and laying of UG cable in 700 mm deep cable trench made of RCC with MS channel . This includes supply of all materials erection, commissioning of cable & trench etc. The laying of cable from transformer to the panel board shall be done in cable trench made of RCC complete with excavation of soil, construction of RCC wall for a height of 700 mm and inside width of 500 mm. Both wall and bottom surface of inside trench shall be finished with a fine coating of plaster. This constructed cable trench shall be covered with concrete slabs each of requisite width and length . | — | — | — | 1,90,736 | |
| details. | Breakup for | — | — | ||
| Dismantling of Rail pole to tranported to nearest depot | — | — | — | 36,721.5 | |
| details. | Breakup for | — | — | ||
| Cable laying single in earth: This involves Excavation of 1000mm deep trench in soil/hard murrum/tar road/below Railway track. After this the cable shall be laid and then both sides are to be covered with bricks. The rest of the trench to be refilled by sheaved earth. The cable shall be supplied free of cost by Rly's which shall have to be transported by the contractor from Rly. depot,JBP to the site | — | — | — | 6,94,363 | |
| details. | Breakup for | — | — | ||
| Cable laying double in earth.(LT, HT both type) This involves Excavation of 1000mm deep trench in soil/hard murrum/tar road/below Railway track. After this the cable shall be laid and then both sides are to be covered with bricks. The rest of the trench to be refilled by sheaved earth. The cable shall be supplied free of cost by Rly's which shall have to be transported by the contractor from Rly. depot,JBP to the site | — | — | — | 2,29,230 | |
| details. | Breakup for | — | — | ||
| Cable laying on wall /pole and other similar places fixing using MS flat [25x6mm.]clamps, nuts, bolts,screws or nails as per site requirement | — | — | — | 7,917.5 | |
| details. | Breakup for | — | — | ||
| details. | Breakup for | — | — | ||
| — | — | — | 1,33,901.4 | ||
| — | — | — | 1,05,774.84 | ||
| — | — | — | 25,35,860.4 | ||
| — | — | — | 61,610 | ||
| Supply and erection of outdoor control box of IP54 degree of protection,Switch On-Off street lights on time scheduling basis by incorporating an analog/digital time switch and contactor, 32A 230 V 3P Timelite Distribution Boards-Analog Time Switch,IS/IEC 13947-27 Make- Havells, ABB, L&T , or equivailent | — | — | — | 1,36,936.48 | |
| — | — | — | 64,01,784.46 | ||
| details. | Breakup for | — | — | ||
| Cable laying Duble in earth: This involves Excavation of 1000mm deep trench in soil/hard murrum/tarroad/below Railway track. After this the cable shall be laid and then both sides are to be covered with bricks and sand. The rest of the trench to be refilled by sheaved earth. The cable shall be supplied free of cost byRly's which shall have to be transported by the contractor from Rly. depot,JBP to the site | — | — | — | 3,39,600 | |
| details. | Breakup for | — | — | ||
| Cable layingsingle in earth: This involves Excavation of 1000mm deep trench in soil/hard murrum/tarroad/below Railway track. After this the cable shall be laid and then both sides are to be covered with bricks and sand. The rest of the trench to be refilled by sheaved earth. The cable shall be supplied free of cost byRly's which shall have to be transported by the contractor from Rly. depot,JBP to the site | — | — | — | 3,41,490 | |
| details. | Breakup for | — | — | ||
| Excavation of cable trench in cement concrete and laying of cable The cable shall be supplied free of cost by Rly's which shall have to be transported by the contractor from Rly. depot, to the site. | — | — | — | 2,15,175 | |
| details. | Breakup for | — | — | ||
| Pucca Cable trench: Construction of cable trench and laying of UG cable in 700 mm deep cable trench made of RCC with MS channel . This includes supply of all materials erection, commissioning of cable & trench etc. Trench shall be made of RCC complete with excavation of soil, construction of RCC wall for a height of 700 mm and inside width of 500 mm. Both wall and bottom surface of inside trench shall be finished with a fine coating of plaster. This constructed cable trench shall be covered with concrete slabs each of requisite width and a length of 1m. | — | — | — | 4,52,615 | |
| details. | Breakup for | — | — | ||
| Drilling of horizontal bore below track / road/ soil/ concrete by pushing method for laying of HDPE pipe up to 450 mm dia( HDPE Pipe will be supply by contractor ) | — | — | — | 12,77,585 | |
| details. | Breakup for | — | — | ||
| Cable laying/ removing on wall /pole/ cable tray/ steel struvture and other similar places fixing using MS flat [25x6mm.]clamps, nuts,bolts,screws or nails as per site requirement | — | — | — | 49,170 | |
| details. | Breakup for | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
AC08to10.pdf
ATTACHMENT
33tenderdoc.pdf
ATTACHMENT
GCCcorrectionslips.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .