Tender Value
₹16.9 L
EMD Value
₹16,900
Closing Date
25 Aug 2026, 5:00 pm2d left
SE(CIVIL)
CIVIL WORKS CIRCLE,OPTCL BBSR
Construction of RCC Drain in between Switchyard Boundary and Grid Compound wall ( west side of switchyard ) at 132 33 kv Grid SS ,at ,Jajpur Town.
2026_OPTCL_138298_6
OPTCL-CVL-SE - E-03 - 2026-27
Open Tender
Civil Works - Others
Percentage
90 days
JAJPUR TOWN
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
SE(CIVIL),CIVIL WORKS CIRCLE,OPTCL
₹16,900
Yes
11 Aug 2026
11 Aug 2026
1 Sept 2026
11 Aug 2026
25 Aug 2026
11 Aug 2026
11 Aug 2026 - 18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in hard soil on foundation trenches in all kinds of soil including moorum stony earth and earth mixed with boulder except sheet rocks and boulders requiring blasting including dressing and leveling the bed up to the required depth and depositing the excavated materials with all leads and lifts T&P shoring and shuttering , dewatering if required etc complete including cost,conveyance,taxes of all labour with T&P required etc complete as per the direction of the Engineer in charge. | 1 | cum | 1 | ₹1 |
| 2 | Supplying all labour for dismantling brick masonry including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge | 1 | Cum | 1 | ₹1 |
| 3 | Supplying all labour for dismantling RCC structure including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge | 1 | cum | 1 | ₹1 |
| 4 | Supplying all labour with T&P for filling foundation and plinth with sand including watering, ramming etc comolete including cost , conveyance , royalties and taxes of all materials and cost of all labour with T&P required for the work etc complete (measurement will be taken on finished & complete section only) as per the direction of the Engineer in charge. | - | Cum | - | - |
| 5 | Cement concrete with (1:3:6) in foundation and floors using 40 mm ( 1 ½ ‘’) size black hard crusher broken granite stone metal of approved quality from approved quarry including lower laying concrete watering and curing etc complete to required level laid in layers not exceeding 150 mm ( 6’’) thick including cost, conveyance, royalties and taxes of all materials and cost , conveyance of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge. | - | cum | - | - |
| 6 | Cement concrete with (1:2:4) in using 12 mm size black hard crusher broken granite stone chips of approved quality from approved quarry including lower laying concrete watering and curing etc complete to required level laid in layers not exceeding 150 mm ( 6’’) thick including cost, conveyance, royalties and taxes of all materials and cost , conveyance of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge. | - | cum | 1 | - |
| 7 | RCC (1:1.5:3) M20 grade in drain base and side wall having a minimum compressive strength 20N/mm2 ( in work test of 200 Kg per CM2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S.516 ) using 12 mm to 20 mm size hard black crusher broken granite stone chips ( 20 mm size not to exceed 25% ) including hoisting, lowering, laying compacting concrete by using concrete mixer vibrators and similar equipments and tools and plants with watering and curing for 28 days including centering, shuttering and finishing the exposed surfaces smooth providing grooves or beads where necessary including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc complete in all respects but excluding the cost of M.S. rods or tor steel and binding wires and labour charges for cutting, bending, binding and tying the grills etc complete as per the direction of the Engineer - in – charge. | 1 | cum | - | - |
| 8 | RCC (1:1.5:3) M20 grade in Roof slab having a minimum compressive strength 20 N/mm2 ( in work test of 200 Kg per CM2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S.516 using 12 mm to 20 mm size hard black crusher broken granite stone chips (20 mm size not to exceed 25% ) including hoisting, lowering, laying compacting concrete by using concrete mixer vibrators and similar equipments and tools and plants with watering and curing for 28 days including centering, shuttering and finishing the exposed surfaces smooth providing grooves or beads where necessary including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc complete in all respects but excluding the cost of M.S. rods or tor steel and binding wires and labour charges for cutting, bending, binding and tying the grills etc complete as per the direction of the Engineer - in - charge. | - | cum | - | - |
| 9 | Supplying,fitting,fixing of MS rod or tor steel including straightening ,cutting, bending, binding by using binding wire of18-20 gauze , molding, welding, jointing if necessary and placing in position as per drawing & technical specification ( Payment shall be made on weight of M.S. Rod & Tor steel only and no separate payment will be made towards the weight of binding wires) including cost,conveyance, royalties and taxes of all materials and cost, conveyance,taxes of all labour T & P required etc complete as per direction of Engineer in charge. | - | qntl | - | - |
| 10 | Supplying all labour and T&p for removal of debris , surplus earth and other excavated amterials etc. by mechanical means upto a distance of 5 km with collecting and stacking of same head load with 50 mtr including loading and unloading for truck transportation cost and conveyance of all labours and t&P required for the work etc complete as per the direction of the EIC. | 1 | cum | 1 | ₹1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.70 MB
Tendernotice_2.pdf
PDF • 4.50 MB
Tendernotice_3.pdf
PDF • 1.15 MB
Tendernotice_4.pdf
PDF • 1.31 MB
Tendernotice_5.pdf
PDF • 1.46 MB
BOQ_605486.xls
BOQ • 0.29 MB
1STCORRIGENDUM.pdf
PDF • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].