Tender Value
₹1.4 Cr
EMD Value
₹2.2 L
Closing Date
25 Feb 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
ELECT.GENL
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of 'V/N' or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: i.Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or ii.Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or iii.One similar work costing not less than the amount equal to 60% of advertised value of the tender. Note: Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender. Note for Item 10.1:Work experience certificate from private individual shall not be considered. However, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered. (For details refer tender documents) Definition of similar nature of work is mentioned below at 1.1
Definition of similar Nature of work: Supply,erection/installation, testing and commissioning of Electrical assets pertaining to HT and /or LT & HT power supply systems such as substations (with / without supply of transformers/sub-station Equipments), HT panels, laying of LT and HT cables, Laying of HT overhead lines, Light poles, high masts including luminaries,earthing of electrical equipments , straight through Jointing and end terminations of LT/HT systems etc. and/or Maintenance and operation of Electrical assets pertaining to HT and/or LT&HT power supply systems by providing skilled and unskilled manpower in Railways or in Airports or Defence or CPWD or other Central Govt. or State Govts. or their Public sector undertakings.
29 conditions · 7 needing a document upload
Please submit Certificate of Familiarization as per Chapter-4
For all tenders having advertised cost of Rs.10 lakh or above, the contractor shall have to submit the option to take payment from Railways through a letter of credit (LC) arrangement. The tenderer shall affirm having read over and agreed to the terms and conditions of the LC option. The option of taking payment through LC arrangement, once exercised by tenderer at the time of bidding, shall be final and no change shall be permitted, thereafter, during execution of contract. (The tenderer have to submit the option to take payment from Railway through a Letter of Credit arrangement)
The list of personnel / organization on hand and proposed to be engaged for the tendered work. Similarly list of Plant & Machinery available on hand and proposed to be inducted and hired for the tendered work
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF)/Limited Liability Partnership (LLP) etc. If it is NOT mentioned in the submitted tender that tender is being submitted on behalf of a Sole Proprietorship firm/Partnership firm/Joint Venture/Registered Company etc., then the tender shall be treated as having been submitted by the individual who has signed the tender . The tenderer(s) shall enclose the attested copies of the constitution of their concern and copy of PAN card along with the tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be. (for details refer tender documents) NOTE: Any document containing PAN number of the tenderer(s) shall also be considered in lieu of PAN card. However, if no document having mention of PAN number is uploaded, offer will be summarily rejected. (For details refer Tender documents)
Documents to be submitted as per Clause 14 of GCC-April 2022 in support of (a)Sole Proprietorship firm (b) HUF (c) Partnership Firm (d) Joint Venture (JV) (e) Company registered under Companies Act 2013 (f) LLP (Limited Liability Partnership) (g) Registered Society & Registered Trust. (for details refer tender documents) NOTE: Non submission of above documents will lead to summarily rejection of the offer.
The tenderer has to upload GST registration certificate & PAN card.
The Bid Security shall be deposited either in cash through epayment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure- VIA of GCC-22 and shall be valid for a period of 90 days beyond the bid validity period.
Note: Fixed Deposit Receipt (FDR) will not be accepted for tenders invited on IREPS (e-tender portal)
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please submit your bank details i.e. Name of Bank along with Bank Branch Code, Accounts Number as appearing in the cheque book, IFSC Code, duly certified by the authorised official of the bank, to facilitate payment through ECS/NEFT/RTGS. In lieu of the bank certificate photocopy/scanned copy of a cancelled cheque may be attached for verification of the above particulars.
No manual tenders sent by post/Fax/courier or in person shall be accepted
No post tender correspondence shall be entertained after closing of tender even suo moto post tender letters of the tenderers shall be treated as null/void
Indian Railways Standard General Conditions of contract 2022 corrected up to date of closing of tender and the attached document are part of the tender document.
For more details the instruction to tenderers and all other details available in the documents attached with tender may be referred to
The tenderers are required to observe the website to find out if any correction slips issued subsequent to uploading of the Tender. Railway reserves the right to make any additions/alterations to the tender uploaded and issue corrigendum to the same effect. In case the tenderer fails to take note of the above corrigendum, the additions and alterations entered/effected in the corrigendum shall be binding upon the tenderer and no claim what so ever will be entertained by Railway
The Railway reserves right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities here under nor will it affect any rights of the railway there under
In case of any wrong information submitted by the tenderer ,the contract shall be terminated, Earnest Money Deposit(EMD), Performance Guarantee(PG) and Security Deposit(SD) of contract forfeited and agency barred for doing business on entire Indian Railways for 2(two) years
Railway Board letter No. 2017/Trans/01/Policy dated 08-02-2018 is applicable to the instant tender
The tenderer should upload the documents carefully. The documents uploaded by tenderer should be clearly visible and in legible format.
Note: The tenderer is advised to go through the attached document thoroughly before quoting the rate.
Note: Schedule-B shall be executed in full quantity. Bill for execution portion of the work shall only be processed after passing of Sch-B bill.
Note: Overall warranttee of the work is for a period of 5(Five) years. Security Deposit(SD) will be released after expiry of warranty period i.e. 5(Five) years.
Declaration :- By Submitting the offer online using Digital Signing Certificate, I/We hereby acknowledge that I/We have downloaded and read all the tender conditions and are fully aware of the tendering process and agree to abide by all the conditions mentioned in the tender.I/We are also fully aware of all the guidelines /circulars/letters /recommendations/drawings/laws/acts etc mentioned in the condition and agree to abide by the same.
Electrification in connection with Provision of Quick Watering System at KDJR stations.
e-Tender-Elect-G-74-25~ECOR
e-Tender-Elect-G-74-25
Open
Works - General
4 Months
Khordha, Odisha
₹0
₹2.2 L
25 Feb 2026
2 Feb 2026
11 Feb 2026
51 items across 2 schedules · ₹1,40,61,147.39 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Centrifugal Pump sets = 4 Nos (Pump sets of 40 HP each along with squirrel cage induction Electric motor, 3 Phase, AC 415 V, 50 Hz ). Flow rate 180-200 M3/hr at 30-35 mtrs. Pump sets (03 Nos working + 01 No as stand by) | Job | 1.00 | 9,64,732.58 | 9,64,732.58 |
| 2 | Material and labour for Common Skid Mounting for 04 Nos Pump sets of capacity 40 HP each as per manufacturer's design. | Job | 1.00 | 60,198.82 | 60,198.82 |
| 3 | Material and labour for MS Fabricated Suction manifolds suitable 04 Nos Pump sets of 40 HP capacity each for quick watering facility. | Job | 1.00 | 77,177.98 | 77,177.98 |
| 4 | Material and labour for MS fabricated Delivery manifolds suitable for 04 Nos Pump sets of 40 HP capacity for quick watering facility. | Job | 1.00 | 77,177.98 | 77,177.98 |
| 5 | Supply, fixing, testing and commissioning of Butterfly Valve 150 mm including necessary connected items of work. | Each | 8.00 | 15,946.5 | 1,27,572 |
| 6 | Supply and fixing, Non return Valve, CI, 150 mm nominal dia. Class PN-2 or above suitable for the maximum pressure ratings in the | Each | 4.00 | 15,917.9 | 63,671.6 |
| 7 | Supply, fixing, testing and commissioning of Hydro-pneumatic steel tank with pressure gauge and all necessary Fittings of suitable capacity and pressure ratings for the pumping system all as specified and as directed by Engr in-Charge. | Job | 1.00 | 57,883.97 | 57,883.97 |
| 8 | Supply and install 2 KVA Industrial type on- line sine wave UPS with VRLA battery suitable for 3 Hours Back up. | Each | 1.00 | 1,42,394.1 | 1,42,394.1 |
| 9 | Electrical operated valve, CI 150 mm, suitable for automation through SCADA system all as specified and as directed by Engr-in Charge. | Each | 4.00 | 1,96,109.97 | 7,84,439.88 |
| 10 | Supply and fixing, Flow Meter 150 mm, both ends flanged, suitable for the delivery line of the pumping system. | Each | 4.00 | 1,96,109.97 | 7,84,439.88 |
| 11 | Material and labour for 1.5 Sq.mm, 6 Core multistranded copper cable for electric control wiring of control valves all as specified and as directed. | Metre | 100.00 | 140.07 | 14,007 |
| 12 | material and labour for Power Cable from Pumps to Control Panel 16 Sq.mm. multistranded copper conductor, 3.5 core including lugs, thimbles etc. | Metre | 100.00 | 617.42 | 61,742 |
| 13 | Design, fabrication, supply and installation of LT Control Panel having Change over in incoming supply, with MCCB, Multifunctional Meter, Aluminum Bus Bar, Outgoing with MCCBs for Pump sets including VFD & PLC Starters, APFC Panel, suitable for the pump sets (04 Nos x 40 HP) and suitable for integration with SCADA system all as specified and as directed. | Numbers | 1.00 | 14,47,099.36 | 14,47,099.36 |
| 14 | Design, install, testing and commissioning of SCADA for 200 Tab data analysis including of desk top PC, LED display 32" Keyboard, printer and licensed viewing system for Two integrated remote installed office PCs through team viewer through internet connection and allied accessories complete all as specified and as directed. | Numbers | 1.00 | 4,34,129.81 | 4,34,129.81 |
| 15 | Material and labour for copper wire to connect the Earth to container, Pump Motors, control Panel, DG Sets. Etc., all as specified and as directed. | Kg | 50.00 | 984.33 | 49,216.5 |
| 16 | Remote Operation/Mobile operation module for 4 Relays (This will be fixed on control panel.) all as specified and directed. | Numbers | 1.00 | 1,73,651.92 | 1,73,651.92 |
| 17 | Supply and fixing Pressure transducer suitable for and including pressure gauges all as specified and directed. | Set | 9.00 | 25,469.22 | 2,29,222.98 |
| 18 | Supply of T8 LED tube light fitting complete with lamp | Numbers | 10.00 | 529.57 | 5,295.7 |
| 19 | Supply of BLDC energy efficient ceiling fan 1200 mm sweep | Numbers | 4.00 | 3,295.86 | 13,183.44 |
| 20 | Supply of exhaust fan 300mm sweep single phase,230 V ,50 HZ | Numbers | 4.00 | 2,604.79 | 10,419.16 |
| 21 | Supply & laying of 25/19mm dia (medium) thick PVC pipe. | Metre | 80.00 | 59.12 | 4,729.6 |
| 22 | Supply and fixing of PVC circular box/RJ box /square junction box/GI junction box on wall/roof/truss with proper clamps. | Numbers | 30.00 | 43.8 | 1,314 |
| 23 | Concealed/surface wiring with (2x4 +1x1.5) sqmm Cu.wire 1100 volt grade(without supply & laying of PVC pipe ) | Metre | 200.00 | 103.7 | 20,740 |
| 24 | Light /fan/Ex fan/call bell concealed Point wiring (without supply and laying of pipe) with ( 2x1.5+1x1) Sq.mm flexible copper conductor 1100V grade run inside 19/25mm PVC conduit pipe with earth continuity conductor. | Point | 60.00 | 300.03 | 18,001.8 |
| 25 | Concealed/surface wiring with (2x6 +1x2.5)Sq.mm. Cu. wire 1100 volt grade(without supply & laying of PVC pipe ) | Metre | 100.00 | 161.73 | 16,173 |
| 26 | Concealed/surface wiring with (2x2.5+1x1) sqmm Cu.wire 1100 volt grade(without supply & laying of PVC pipe ) . | Metre | 200.00 | 67.68 | 13,536 |
| 27 | Concealed/surface wiring (without supply and laying of pipe)for separate plug point 6A 250V modular type with ( 2x2.5+1x1) Sq.mm flexible copper conductor 1100V grade. | Point | 30.00 | 883.23 | 26,496.9 |
| 28 | Concealed/surface wiring(without supply and laying of pipe) for separate plug point 6A/16A 250V modular type with ( 2x4+1x1.5) Sq.mm flexible copper conductor 1100V grade. | Point | 15.00 | 1,377.22 | 20,658.3 |
| 29 | Supply,erection,testing and commissioning of sub service main wall mounted consisting of 8way SPN DB with 8X 6A/10A/20A/ 25A MCB SP 10KA C series. | Numbers | 2.00 | 2,848.1 | 5,696.2 |
| 30 | Supply, erection, testing and commissioning of 6way distribution box (acrylic window) with I/C:1x32A MCB DP, 10KA C series, O/G:4x6A/10A/16A MCB SP 10KA C series | Numbers | 2.00 | 2,969.47 | 5,938.94 |
| 31 | Supply of 12 way double door DB with 01 No 40A TPN MCB,2 Nos 32A DP and 4 Nos 16A/25A/32A MCB | Numbers | 2.00 | 6,266.14 | 12,532.28 |
| 32 | Supply and erection of VTPN DB with I/C: 1 No. 100A MCCB and O/G: 6 40A TP MCB, 6 Nos 16A/25A /32A SP MCB | Numbers | 1.00 | 21,376.24 | 21,376.24 |
| 33 | Supply of 200W LED flood luminaries. | Numbers | 4.00 | 11,275.36 | 45,101.44 |
| 34 | Supply of LED street light luminaire 70 watt with all accessories. | Numbers | 4.00 | 5,590.74 | 22,362.96 |
| 35 | Fixing & Commissioning charge light Luminaires on building. | Numbers | 8.00 | 416.95 | 3,335.6 |
| 36 | Single Cable laying along the road/track | Metre | 1000.00 | 424.6 | 4,24,600 |
| 37 | Cable laying across the road/track by using trenchless construction method | Metre | 100.00 | 3,566.19 | 3,56,619 |
| 38 | Single Cable laying in air | Metre | 400.00 | 30.79 | 12,316 |
| 39 | Dismantling of hard concrete in any shape and size and laying of cable | cum | 20.00 | 3,029.27 | 60,585.4 |
| 40 | Provision maintenance free chemical earthing | Numbers | 10.00 | 17,009.85 | 1,70,098.5 |
| 41 | Supply & erection of G.I. 50X6/25x6 flat for connection earthing | Kg | 300.00 | 55.36 | 16,608 |
| 42 | Supply of 11/0.4 KV, 500 kVA oil type Packaged substation. | Set | 1.00 | 24,05,050.43 | 24,05,050.43 |
| 43 | Erection of 500 kVA oil type Packaged substation | Set | 1.00 | 2,74,549.14 | 2,74,549.14 |
| 44 | Supply installation testing and commissioning of 250 kVA DG set with AMF panel complete. | Set | 1.00 | 22,66,570 | 22,66,570 |
| 45 | Design , Manufacturing ,Supply, installation, testing and commissioning of Cubical type LT panel. | Numbers | 1.00 | 10,20,131.24 | 10,20,131.24 |
| 46 | Supply of Cable end termination (Heat shrinkable type) outdoor joint suitable for 11KV(earthed) XLPE 3x50-95Sq.mm | Numbers | 4.00 | 6,408.04 | 25,632.16 |
| 47 | Fixing, Testing & Commissioning of Straight through joint/end termination of HT XLPE UG cable | Numbers | 4.00 | 4,746.9 | 18,987.6 |
| Schedule total | ₹1,28,67,397.39 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ScopeofQuickwatering.pdf
ATTACHMENT
GCC-2022.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .