| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st lowest₹1.1 CrAccepted-AOC | ₹1.1 Cr | 1st lowest | Accepted-AOC Award of contract to Sri Pradeepta Kumar Panda, B Class Engineering Contractor through transparency lottery system |
| 2 | 1st lowest₹95.9 LRejected-Finance | ₹95.9 L | 1st lowest | Rejected-Finance Works Department office memorandum No.1437, Dtd.31.01.2023 Clause-36 of Appendix-IX of OPWD Code Vol-II |
| 3 | 1st lowest₹1.1 CrRejected-AOC | ₹1.1 Cr | 1st lowest | Rejected-AOC REJECT |
| 4 | 1st lowest₹1.1 CrRejected-AOC | ₹1.1 Cr | 1st lowest | Rejected-AOC REJECT |
| 5 | 1st lowest₹1.1 CrRejected-AOC AT BHUSLAD PO DEDGAON BLOCK BANGAMUNDA PS SINDHEKELA DIST BOLANGIR PIN 7670354 ODISHA | 7670354 | ₹1.1 Cr | 1st lowest | Rejected-AOC REJECT |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
17 Mar 2026, 5:00 pmClosed
Chief Construction Engineer
Rural Works Circle, Sunabeda, At-Sunabeda-1, Near Jagannath Temple, PIN-763001, Dist-Koraput
Construction of Rural Works Division Building at Malkangiri for the year 2025-26
2026_CERWI_126786_1
CCERWCSBD-Online-40/2025-26
National Competitive Bid
Civil Works - Buildings
270 days
Malkangiri
3 documents required · 3 mandatory
₹10,000
₹1.3 L
Yes
29 Jun 2026
28 Feb 2026
18 Mar 2026
28 Feb 2026
17 Mar 2026
28 Feb 2026
28 Feb 2026 - 16 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned,up to a lead of 1000 meters including removal and Disposal of top organic soil not exceeeding 150 mm in thickness as directed by the Engineer in charge. | 250.96 | sqm | 8.41 | ₹2,110.57 |
| 2 | Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,labour cess,T&P,sundries etc. as directed by the Engineer in charge. | 418.82 | cum | 276.9 | ₹1,15,971.26 |
| 3 | Providing & applying of pre constructional anti-termite treatment by drilling 12mm dia holes at distance of 30cm @ junction of wall & floor about 300mm apart deep enough to reach the soil below & chemical emulsion (IMIDACHLOPRIED 30.5SC mixed with 47.5ltr water) pumped these holes to soak the soil @ 1 ltr solution of each hole as per manufactures specification & the holes should be pluged the filling materials including cost of all materials, labour,conveyance, T&P , all taxes and hire charges of machinaries as per direction of Engineer-in-charge.(make-premise-BAYER,Paxton-FMC,ozie-KALYANI) | 403.3 | sqm | 104.5 | ₹42,144.85 |
| 4 | Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour, T & P completed as directed by the Engineer-in-Charge. | 2.43 | cum | 206.3 | ₹501.31 |
| 5 | Supplying & filling of foundation with course sand well watered and rammed including cost, cost of all labour, carriage, royalty complete in all respect.as directed by the Engineer in charge. | 320.04 | cum | 971.7 | ₹3,10,982.87 |
| 6 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. | 51.14 | cum | 6,080.6 | ₹3,10,961.88 |
| 7 | Cement Concrete (1:2:4) using 12mm size hard granite C.B. chips approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. (In GF) | 34.21 | cum | 7,047.6 | ₹2,41,098.4 |
| 8 | Cement Concrete (1:2:4) using 12mm size hard granite C.B. chips approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. (In FF) | 1.45 | cum | 7,114.2 | ₹10,315.59 |
| 9 | RCC M-20 grade in substructure of wall (Footing COMPOUND WALL) with formwork using 20 to 10mm size crushed stone aggregates mixed by concrete mixer, laying with all leads and lifts & compacting and lifts as per approved Drawing & Technical Specifications and Section - 1700 & 2200 of MoRT&H Specifications for Road & Bridge works as directed by the Engineer in charge. | 12.79 | cum | 6,447.44 | ₹82,462.76 |
| 10 | RCC M-20 grade in substructure of wall (PLINTH BEAM COMPOUND WALL) with formwork using 20 to 10mm size crushed stone aggregates mixed by concrete mixer, laying with all leads and lifts & compacting and lifts as per approved Drawing & Technical Specifications and Section - 1700 & 2200 of MoRT&H Specifications for Road & Bridge works as directed by the Engineer in charge. | 8.47 | cum | 6,447.44 | ₹54,609.82 |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 2.60 MB
Tendernotice_2.pdf
PDF • 0.30 MB
Tendernotice_1.pdf
PDF • 1.72 MB
BOQ_583631.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid