Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-Finance | L1 | Accepted-Finance LOW RATE QUOTED | |
| 2 | L2₹5.7 L+₹15,922.20 (2.90%)Rejected-Finance | L2 | Rejected-Finance HIGHER THEN L1 | |
| 3 | Rejected-Technical | - | Rejected-Technical Withdrawal of Tender Letter Received From Bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical Withdrawal of Tender Letter Received From Bidder | |
| 5 | Rejected-Technical | - | Rejected-Technical Withdrawal of Tender Letter Received From Bidder |
| Sl No | Description | Qty | Unit | Gurusamy L1 | Parasuraman Contractor L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized oulders and gravelly soil etc., complete for boxing as per IS 20B. | 756 | m3 | 308 ₹2,32,848 Lowest | 310 ₹2,34,360 |
| 2.00 | Refilling Excavated earth and all labour charges,etc, | 756 | m3 | 42 ₹31,752 Lowest | 45 ₹34,020 |
| 3.00 | Cost and supply of 90 mm 6 Ksc Pvc Pipe and Specials | 1,200 | RM | 140 ₹1,68,000 Lowest | 145 ₹1,74,000 |
| 4.00 | Laying Charges | 1,200 | RM | 22 ₹26,400 Lowest | 25 ₹30,000 |
| 5.00 | Towards cost and Supply of Specials | 1 | Nos | 2,500 ₹2,500 Lowest | 2,500 ₹2,500 Lowest |
| 6.00 | GST 18% | 1 | No | 83,070 ₹83,070 Lowest | 85,478.4 ₹85,478.4 |
| 7.00 | LWF 1% | 1 | No | 4,615 ₹4,615 Lowest | 4,748.8 ₹4,748.8 |
Tender Value
₹5.6 L
EMD Value
₹5,600
Closing Date
7 Sept 2026, 3:00 pmClosed
Block Development Officer
Cheyyar
Providing Pumbing Main Line 90 mm PVC Pipeline from Thiruvathipuram 200000 Lit OHT to Kilpudupakkam Sump at Kilpudupakkam
2026_RDTN_698218_1
Providing Pumbing Main Line 90 mm PVC Pipeline from Thiruvathipuram 200000 Lit OHT to Kilpudupakkam
Open Tender
Civil Works
Lump-sum
30 days
Block Development Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,600
16 Sept 2026
25 Aug 2026
7 Sept 2026
25 Aug 2026
7 Sept 2026
25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized oulders and gravelly soil etc., complete for boxing as per IS 20B. | 756 | m3 | - | - |
| 2 | Refilling Excavated earth and all labour charges,etc, | 756 | m3 | - | - |
| 3 | Cost and supply of 90 mm 6 Ksc Pvc Pipe and Specials | 1,200 | RM | - | - |
| 4 | Laying Charges | 1,200 | RM | - | - |
| 5 | Towards cost and Supply of Specials | 1 | Nos | - | - |
| 6 | GST 18% | 1 | No | - | - |
| 7 | LWF 1% | 1 | No | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_839287.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .