Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC | ₹14.2 L | L1 | Accepted-AOC AOC |
| 2 | L2₹14.2 LSame as L1Rejected-Finance | ₹14.2 LSame as L1 | L2 | Rejected-Finance Rejected Being Higher Rates |
| 3 | L2₹14.2 LSame as L1Rejected-Finance | ₹14.2 LSame as L1 | L2 | Rejected-Finance Rejected Being Higher Rates |
| 4 | L2₹14.2 LSame as L1Rejected-Finance UTTAR PRADESH UP | GHAZIABAD | UTTAR PRADESH | 201001 | ₹14.2 LSame as L1 | L2 | Rejected-Finance Rejected Being Higher Rates |
| 5 | L2₹14.2 LSame as L1Rejected-Finance ADD VILL NEWADA GAMBHI POST GAUTARA MADHOGANJ DIST HARDOI | ₹14.2 LSame as L1 | L2 | Rejected-Finance Rejected Being Higher Rates |
Tender Value
₹16.7 L
EMD Value
₹1.7 L
Closing Date
15 Jun 2026, 12:00 pmClosed
Executive Engineer PD PWD Lucknow
Office of the Executive Engineer PD PWD Lucknow
Rain Cut Repair work at BKT Area VR under Jurisdiction of AE-III
2026_CEUCZ_1157364_13
4775/E-Tender/2026-27 Dated 01.06.2026
Open Tender
Civil Works - Roads
Percentage
90 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹1.7 L
Office of the Executive Engineer PD PWD Lucknow
23 Jul 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and technical specifications Clause 1902 (Manual Means) as per SOR ch-25 Si No-55 | 650 | cum | 302 | ₹1,96,300 |
| 2 | Maintenance of Earthen shoulder (filling with fresh selected soil)
Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 as per SOR ch-25 Si No-56 | 2,400 | Sqm | 36 | ₹86,400 |
| 3 | Maintenance of Earhen shoulder (stripping of excess soil)
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903 as per SOR ch-25 Si No-56 | 2,400 | Sqm | 17 | ₹40,800 |
| 4 | Empty Bag Filling by Sand.
Supply and Laying of sandy earth plastic cement bags (volume 0.035cum) including cost of earth , cost of empty bags , labour , stitching with sutely complete , laying and placing complete at the place of restoration of Embankment. as per SOR ch-25 Si No-47 | 1,050 | Bags | 38 | ₹39,900 |
| 5 | Empty Bag Filling by Earth
Supply and Laying of sandy earth plastic cement bags (volume 0.035cum) including cost of earth , cost of empty bags , labour , stitching with sutely complete , laying and placing complete at the place of restoration of Embankment. as per SOR ch-25 Si No-48 | 1,250 | Bags | 20 | ₹25,000 |
| 6 | Brick bat filling with Over Burnt Brick (O.B.B)/ Class-150 Bricks including all completion of the work. | 950 | cum | 1,350 | ₹12,82,500 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
BOQ_2168869.xls
BOQ • 0.24 MB
T1_4775.pdf
Tender Documents • 3.21 MB
5006.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .