| 1 | Admitted-Fee/PreQual/Technical/Finance NO 5 83 CHURCH ROAD SALEM CAMP P O METTUR DAM 636 456 SALEM | METTUR DAM | SALEM | TAMIL NADU | 636456 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹58.5 L
EMD Value
₹58,500
Closing Date
28 Oct 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE/TP-I
A10 Thiru vi ka Indl Estate Guindy Chennai 32
Laying of 230 KV 1x1200 sq.mm XLPE UG Cable with erection of joints for rerouting the 230KV cable inside Royapettah hospital
2021_EB_212135_1
TP1-10/21-22
Open Tender
Electrical Works
Works
60 days
Chennai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹58,500
29 Oct 2021
22 Oct 2021
29 Oct 2021
22 Oct 2021
28 Oct 2021
22 Oct 2021
180 days
Amount
Erection for 230 KV Normal joints
Removing the black topping of any thickness and forming cable trench and cable duct at road crossing including cost of providing sign boards, danger lights, indication arrangements, Reflective tapes wherever necessary, lead, lift, labour, tools & plants, etc., compete.
Earth work excavation in all soils including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct at road crossing including cost of providing sign boards, danger lights, indication arrangements, Reflective tapes wherever necessary and providing shoring and strutting arrangements wherever necessary, all lead, lift, labour, tools & plants, etc., complete.
Dismantling BW inside the cable trench and cable duct wherever occurof any thickness and clearing the trench/duct free from debris and without hinderence to the cable laying work including lead, lift, labour, tools & plants etc., complete as per direction of Engineer-in-charge.
Dismantling PCC inside the cable trench and cable duct wherever occurof any thickness and clearing the trench/duct free from debris and without hinderence to the cable laying work including lead, lift, labour, tools & plants etc., complete as per direction of Engineer-in-charge.
Dismantling RCC inside the cable trench and cable duct wherever occurof any thickness and clearing the trench/duct free from debris and without hinderence to the cable laying work including lead, lift, labour, tools & plants etc., complete as per direction of Engineer-in-charge.
Refilling with filling Sand in layers well rammed, watered and compacted as per standard specification including cost of all materials, lead, labour, etc., complete.
Providing Shoring and Strutting using necessary Country Wooden Planks 40mm thick and 8cm to 10cm dia. Casurina,vertical posts at every 300mm C/C of 1.80m height duly anchored 300mm into the ground for firm support including placing and making the two rows of planks of top and bottom and one middle row of casurina with strutt arrangements at top so as to afford easy laying as cables. The rate shall also include necessary storage charges for the casurina and Country Wooden Planks at suitable place so as not to affect the traffic and movement of public transporting them to work spot lead lift besides the cost of materials etc., complete. ( Any other improved method of shoring and strutting is also accelptable to TANTRANSCO. But at no extra cost to TANTRANSCO )
Back filling with excavated earth in layers well rammed, watered and compacted as per standard specification including cost of all materials, lead, labour, etc., complete.
Transporting and clearing the excess excavated earth and debris than and there and as soon as immediately to avoid any hinderance to normal flow of traffic and publicf beyond a distance of 5km from the work spot as per the direction of Engineer at site including loading and unloading charges etc., complete.
Laying plain cement concrete 1:3:6 using 20mm using HBG (MB) including cost of all materials, lead, lift and labour, etc., complete and as per std.specification.
Supplying and laying 200mm dia PVC pipe 6 kgf/Sq.cm.including labour for transporting the PVC pipes, laying in position, cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of pipe, specials, labour, lead, lift, T&P etc., complete.
Supplying and laying 110mm dia PVC pipe 6 kgf/Sq.cm including labour for transporting the PVC pipes, laying in position, cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of pipe, specials, labour, lead, lift, T&P etc., complete.
Supplying and Laying RCC cover slab of size 500x600x50mm encraved as 230 kV, including labour for loading, unloading, stenciling the cable route details and placing in position carefully as required at site, cost of slab, all labour, lead, lift, T&P, etc., complete.
Providing joint chamber/special chamber in RCC 1:2:4 using 20 mm BG metal for bottom side wall, cast in situ cover slab and dwarf wall in brick masonsry in cm 1:6 using bricks IInd sort ground moulded chamber burnt for joint chamber protection as per drawing and specification including cost of all materials opening in special chamber/duct, shuttering containing scaffolding, labour, lead, lift etc, with neat finish as per standard specification and direction of using mixture machine, vibrator etc, but excluding cost of reinforcement. RCC Bottom Raft
Providing joint chamber/special chamber in RCC 1:2:4 using 20 mm BG metal for bottom side wall, cast in situ cover slab and dwarf wall in brick masonsry in cm 1:6 using bricks IInd sort ground moulded chamber burnt for joint chamber protection as per drawing and specification including cost of all materials opening in special chamber/duct, shuttering containing scaffolding, labour, lead, lift etc, with neat finish as per standard specification and direction of using mixture machine, vibrator etc, but excluding cost of reinforcement. RCC Side wall
Providing joint chamber/special chamber in RCC 1:2:4 using 20 mm BG metal for bottom side wall, cast in situ cover slab and dwarf wall in brick masonsry in cm 1:6 using bricks IInd sort ground moulded chamber burnt for joint chamber protection as per drawing and specification including cost of all materials opening in special chamber/duct, shuttering containing scaffolding, labour, lead, lift etc, with neat finish as per standard specification and direction of using mixture machine, vibrator etc, but excluding cost of reinforcement. RCC Cover slab
Providing joint chamber/special chamber in RCC 1:2:4 using 20 mm BG metal for bottom side wall, cast in situ cover slab and dwarf wall in brick masonsry in cm 1:6 using bricks IInd sort ground moulded chamber burnt for joint chamber protection as per drawing and specification including cost of all materials opening in special chamber/duct, shuttering containing scaffolding, labour, lead, lift etc, with neat finish as per standard specification and direction of using mixture machine, vibrator etc, but excluding cost of reinforcement. Brick work in C.M 1:6
Providing, Fabricating and placing in position of steel reinforcement including cost of cutting, bending, tying, including cost of binding wire etc complete.
Providing barricade arrangement wherever necessary with 8 cm to 10cm dia casurina vertical post andhorizontal runners (vertical post every 1.0 m c/c for anover all height 1.5m driven 0.30m into the ground +1.20m projected above ground level) and horizontal runners in 3 rows cost of all materials , cutting to size taking pits, not to affect the flow of traffic and movement of public transporting to worksite including lead, lift, lift, etc., complete. Note: The barricade have to be removed and refixed twice, for cutting the trench and secondly for removing the dumped earth for laying the cable and the bidder rate shall provide for such operation.
Bailing out water from cable trench and duct while excavating and also while laying cable using 5HP diesel pump including cost of fuel, operator etc., complete.
Casting & placing of RCC offset slab of size 750 x750 x 60 mm casting in RCC 1:2:4 using 12 to 20 mm HBG metal with necessary reinforcement, piling, shuttering, curing, transport from castingpiling, shuttering, curing, transport from casting yard to various locations & fixing the slab along 110 KV cable route as directed by the Engineer incharge with PCC 1:3:6 including cost of all materilas, labour, lessd, lift, etc., including 2 coats of flouresecent paint.
Transporting of 230KV 1X1200 Sq.mm 230KV XLPE UG cable drums each weighing approximately 7T in lorries using adequate capacity truck mounted crane for both loading and unloading including labour required for loading, transporting, unloading, driver bata etc.,Supplying and Providing of Winch,steel wire drum, cable drum stand, rollers, ramp and other T&P 's required for laying to the work site by engaging lorry and crane for site (No material will be supplied from department stores.) Positioning of winch ,D.G.set and others rollers for cable laying on a day before laying, Laying of cables in trench and duct by means of winch over rollers, dressing the cable in trefoil formation, tying the cable with nylon rope at every 3m intervals including providing prewarning tape.The rate includes the cost of pulling the steel wire rope from winch side to drum side,devolution of any balance cables to CDC stores, all tools & plants, labour consumables, lead, lift etc., complete.
Providing watch and ward (Unskilled) at site as instructed site-in-charge.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
POWER TRANZ ENTERPRISES
Sri Indu Constructions
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .