| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.2 LAccepted-AOC | 1 | Accepted-AOC L1 tenderer | |
| 2 | 2₹13.4 L+₹1.2 L (9.37%)Rejected-AOC S F NO 472 C3 VINAYAGA GARDEN SUKKALIYUR KARUR 639 003 | KARUR | KARUR | TAMIL NADU | 639003 | 2 | Rejected-AOC L2 tenderer |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
27 Jul 2023, 3:00 pmClosed
The Superintending Engineer/Tirupur EDC
OFFICE OF THE SUPERINTENDING ENGINEER, TIRUPUR ELECTRICITY DISTRIBUTION CIRCLE, 3rd FLOOR, KRBS TOWER, 208 / 650, METTUPALAYAM BUS STOP, PERUMANALLUR ROAD, TIRUPUR 641 602
Supply and erection of 3 phase 11KV AB cable at veerapandy SS for effecting HTSC to M/S Eveready Spinning Mill
2023_EB_342152_1
Spec.No.WOT.13/2023-24 Dt.12.07.2023
Open Tender
Electrical Works
Turn-key
25 days
Tirupur
2 documents required · 2 mandatory
₹0
₹14,000
Yes
2 Sept 2023
12 Jul 2023
28 Jul 2023
12 Jul 2023
27 Jul 2023
12 Jul 2023
12 Jul 2023 - 27 Jul 2023
Supply of 11 KV Three Phase Aerial Bunched Cable of size 3 X 95 + 1 X 95 sq mm
Supply of Cable Straight Through Joint Kit suitable for 95 sq. mm
Supply of T Jointing Kit
Supply of End Termination Kit
Supply of Suspension Clamp Assembly including Pole Clamps
Supply of Dead End Clamp / Anchor Clamp Assembly including Brackets, Pole Clamps
Supply of End Caps
Supply of Spiral Earth Electrodes
Supply of Grounding Connection for Messenger Wire
Supply of Anchor Sleeve for Messenger Wire
Labour Charges for Erection of 11 KV Three Phase Aerial Bunched Cable of size 3 X 95 + 1 X 95 sq mm
Labour Charges for Erection of Cable Straight Through Joint Kit suitable for 95 sq. mm
Labour Charges for Erection of T Jointing Kit
Labour Charges for Erection of End Termination Kit
Labour Charges for Erection of Suspension Clamp Assembly including Pole Clamps
Labour Charges for Erection of Dead End Clamp / Anchor Clamp Assembly including Brackets, Pole Clamps
Labour Charges for Erection of End Caps
Labour Charges for Erection of Spiral Earth Electrodes
Labour Charges for Erection of Grounding Connection for Messenger Wire
Labour Charges for Erection of Anchor Sleeve for Messenger Wire
Excavation & backfilling of pole pit for pole above 8.00 m length by using JCB / manual
Erection of RCC, REC, PSC pole above 8.00 m length by using crane / manual
Earthing of pole with GI wires 4 or 6 SWG by coil earthing
Excavation & backfilling of stay pit of 4.5 to 5 feet depth using JCB / Manual
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Stay concreting with 1:4:8 mix using 40 mm jally including curing (material + labour)
Fixing of V cross arm 3.5 feet
Fixing of tapping channel cross arm
Fixing of HT / LT TI fitting
Fixing of HT disc 11 KV with metal parts
Fixing of 11 KV porcelain pin insulator with pin or polymer composite pin insulator
Fixing of LT 3 phase cross arm
Fixing of LT pin insulator with pin
Fixing of aluminium knob
Labour Charges for Testing & Commissioning of Complete Line
SUB TOTAL (Items 1 to 10)
SUB TOTAL (Items 11 to 35)
EPF @ 13.00 % on 100 % of (Items 11 to 35)
ESI @ 3.25 % on 100 % of (Items 11 to 35)
Nagul Power Developers
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .