Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.1 LAccepted-Finance | ₹19.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹19.1 LRejected-Finance BANDA | UTTAR PRADESH | 210001 | ₹19.1 L | L2 | Rejected-Finance L2 |
Tender Value
₹22.6 L
EMD Value
₹45,120
Closing Date
30 May 2026, 12:00 pmClosed
EERED RBL
SONIA NAGAR RAEBARELI
SADAR CHETRA KE BALAPUR MOAD SE JYOTIBA NAGAR CHAURAHE TAK INTERLOCKING KARYA
2026_REDUP_1147700_1
350/EE/RED/RBLDT29.04.2026
Open Tender
Civil Works
90 days
SADAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
₹45,120
Yes
4 Jul 2026
18 May 2026
30 May 2026
18 May 2026
30 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
| - | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 12.38 | CUM | 187.15 | ₹2,315.98 |
| - | Providing and laying in position in C.C. specified grade excluding the cost of centering, shuttering , finishing and reinforcement (1:6:12) with cement, Fine sand and 40mm gauge Brick ballast i/c all as per pwd specifications no 273 | 6.19 | CUM | 4,221.8 | ₹26,122.39 |
| - | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering as per drawing and technical specifications Clauses 602,603,604, 1202 & 1204 In 1:4 cement mortar | 27.2 | CUM | 5,889.05 | ₹1,60,182.16 |
| - | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 124.34 | Cum | 2,615.35 | ₹3,25,192.62 |
| - | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203 M20 | 3.16 | CUM | 6,447.65 | ₹20,374.57 |
| - | Providing and laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawing and Technical Specification Clause 1504. | 1,504 | SQM | 899.27 | ₹13,52,502.08 |
| - | Plastering with cement mortar (1:4 ),12mm thick on brick work in sub-structure as per Technical Specifications 613.4 & 1204 | 55 | SQM | 176.7 | ₹9,718.5 |
| - | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802,804,805,806,807,1202 and 1204 M-25 | 0.82 | CUM | 7,197.01 | ₹5,901.55 |
| - | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 0.75 | QTL | 6,657.6 | ₹4,993.2 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_2147565.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid