Loading…
Loading…
Tender Value
₹71.5 L
EMD Value
₹1.4 L
Closing Date
27 Aug 2026, 6:00 pmDue today
Executive Engineer Sgr Core
Office of the Executive Engineer Sgr Core
Upgradation and Beautification of Narwara Road Junction on Dr. Ali Jan Road Eidgah Srinagar.
2026_PWDJK_321032_1
36 of RNB//Sgr-Core/2026-27
Open Tender
Civil Works
Percentage
90 days
Srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,600
Executive Engineer Sgr Core
₹1.4 L
27 Aug 2026
14 Aug 2026
29 Aug 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil part | |||||
| 1.01 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 45.51 | cum | 592.9 | ₹26,982.88 |
| 1.02 | Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material upto a lead of 1 kilometer, as per direction of Engineer-in-charge. | 2.24 | cum | 336.3 | ₹753.31 |
| 1.03 | Providing and laying stone soling hand packed including all carriages involved. | 4.02 | cum | 950 | ₹3,819 |
| 1.04 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:All kinds of soil : 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 2.77 | cum | 5,202.9 | ₹14,412.03 |
| 1.05 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 15.38 | cum | 7,788.4 | ₹1,19,785.59 |
| 1.06 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 40.79 | cum | 9,395.7 | ₹3,83,250.6 |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for:
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 479.16 | sqm | 628.95 | ₹3,01,367.68 |
| 1.1 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 5,815.84 | kg | 123.2 | ₹7,16,511.49 |
| 1.11 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven storey height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffoldings for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. | 150 | SQM | 265.3 | ₹39,795 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_1069352.xls
BOQ • 0.29 MB
dd.pdf
PDF • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].