| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹118.7 CrAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹120.0 Cr+₹1.3 Cr (1.06%)Rejected-AOC RAM PLAZA NAVASHAKTI CHOWK BHABANAGAR NASHIK 422011 | NASHIK | NASHIK | MAHARASHTRA | 422011 | L2 | Rejected-AOC Accept | |
| 3 | Rejected-Technical PLOT NO 6 MAJANU HILL GANESH COLONY T V CENTRE AURANGABAD 431003 MAHARASHTRA | - | Rejected-Technical Disqualified | |
| 4 | Rejected-Technical | - | Rejected-Technical Disqualified | |
| 5 | Rejected-Technical | - | Rejected-Technical Disqualified |
Tender Value
₹106.1 Cr
EMD Value
₹53.1 L
Closing Date
22 Feb 2024, 6:00 pmClosed
Executive Engineer
Executive Engineer, P. W. Building Division Pune At. Govt. Milk Scheme Campus Wakadewadi
Construction Of Office Building Girls Hostel Boys Hostel and Library Building for Chhatrapati Shahu Maharaj Research Training and Human Development Institute SARTHI at ITI Campus Aundh Pune.
2024_PWDRP_989316_1
E-Tender Notice No. 25 For 2023-24
Open Tender
Civil Works
Item Rate
548 days
Aundh
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
₹53.1 L
Chief Engineer, P. W. Region, Pune
22 Jul 2024
23 Jan 2024
26 Feb 2024
23 Jan 2024
22 Feb 2024
23 Jan 2024
6 Feb 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK -
Removing grass, gazer grass and disposing off out of building premises including making clean the ground by shovel and phavaras etc. complete. | 10,381.89 | One Square meter | - | - |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 4,151.87 | One Cubic meter | - | - |
| 3 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | 1,418.99 | One Cubic meter | - | - |
| 4 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5m.) By Mechanical Means | 1,449.88 | One Cubic meter | - | - |
| 5 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 m to 3.0 m.) By Mechanical Means | 209.39 | One Cubic meter | - | - |
| 6 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for th | 248.08 | One Cubic meter | - | - |
| 7 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By Mechanical Means | 2,261.33 | One Cubic meter | - | - |
| 8 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 3.0 m To 4.5 m.) By Mechanical Means | 372.31 | One Cubic meter | - | - |
| 9 | Excavation for foundation in Hard-rock by blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (Lift from 3 m To 4.5m) By Mechanical Means | 280.44 | One Cubic meter | - | - |
| 10 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift from 1.5 m to 3.0 m ). By Mechanical Means | 622.6 | One Cubic meter | - | - |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1728652.xls
BOQ Document • 1.21 MB
137882464.pdf
Tender Document • 1.85 MB
SarthiDTPUploaded.pdf
Tender Document • 16.90 MB
Drawings.pdf
Tender Document • 2.36 MB
137882466.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .