Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14,289Accepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | L2₹29,950+₹15,661 (109.6%)Rejected-Finance | L2 | Rejected-Finance highly |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
2 Dec 2020, 5:30 pmClosed
CMO PANNA
NAGAR PALIKA PARISHAD PANNA M.P
REPAIRING WORK OF SUBMERCIBLE PUMPS AND OPEN WELL PUMPS WITH MATERIALS ACCORDING TO NECESSITY
2020_UAD_113978_1
5395
Open Tender
Miscellaneous Goods
Item Rate
365 days
ITEMS
REPAIRING WORK OF SUBMERCIBLE PUMPS AND OPEN WELL PUMPS WITH MATERIALS ACCORDING TO NECESSITY
2 documents required · 2 mandatory
₹2,000
Yes
₹10,000
Yes
8 Aug 2023
11 Nov 2020
4 Dec 2020
11 Nov 2020
2 Dec 2020
13 Nov 2020
Amount
REPAIRING WORK OF SUBMERCIBLE PUMPS AND OPEN WELL PUMPS WITH MATERIALS ACCORDING TO NECESSITY
Motor Winding Kit 1.0 to 1.5 HP
Motor Winding Kit 2.0 to 3.0 HP
Motor Winding Kit 3.5 to 5.0 HP
Motor Winding Kit 5.5 to 6.5 HP
Motor Winding Kit 7.0 to 8.5 HP
Motor Winding Kit 9.0 to 11.0 HP
Motor Winding Kit 11.5 to 12.5 HP
Motor Winding Kit 13.0 to 15.0 HP
Motor Winding Kit 23.0 to 25.0 HP
Motor Winding Openwell 5.0 HP
Motor Winding Openwell 7.5 HP
Motor Winding Openwell 10.0 HP
Motor Winding Openwell 15.0 HP
Motor Winding Openwell 20.0 HP
Rotor Openwell per HP
Rotor Complete 1.0 to 1.5 HP
Rotor Complete 2.0 to 3.0 HP
Rotor Complete 3.5 to 5.0 HP
Rotor Complete 5.5 to 6.5 HP
Rotor Complete 7.0 to 8.5 HP
Rotor Complete 9.0 to 11.0 HP
Rotor Complete 11.5 to 12.5 HP
Rotor Complete 13.0 to 15.0 HP
Rotor Complete 15.5 to 17.5 HP
Rotor Complete 18.0 to 20.0 HP
Rotor Complete 21.0 to 22.5 HP
Rotor Complete 23.0 to 25.0 HP
Rotor Complete 25.5 to 30.0 HP
Rotor Complete 35.0 to 45.0 HP
Rotor Complete 46.0 to 50.0 HP
Rotor Complete 51.0 to 55.0 HP
Stator Complete 1.0 to 1.5 HP
Stator Complete 2.0 to 3.0 HP
Stator Complete 3.5 to 5.0 HP
Stator Complete 5.5 to 6.5 HP
Stator Complete 7.0 to 8.5 HP
Stator Complete 9.0 to 11.0 HP
Stator Complete 11.5 to 12.5 HP
Stator Complete 13.0 to 15.0 HP
Stator Complete 15.5 to 17.5 HP
Stator Complete 18.0 to 20.0 HP
Stator Complete 21.0 to 22.5 HP
Stator Complete 23.0 to 25.0 HP
Stator Complete 25.5 to 30.0 HP
Stator Complete 35.0 to 45.0 HP
Stator Complete 46.0 to 50.0 HP
Stator Complete 51.0 to 55.0 HP
Submersible Cable 1.5 mm Per Meter
Submersible Cable 2.5 mm Per Meter
Submersible Cable 4.0 mm Per Meter
Submersible Cable 6.0 mm Per Meter
Submersible Cable 10.0 mm Per Meter
Motor Base
Lower Housing
Upper Housing
Connection Piece
Housing Bush -GM
Motor Bush -LTB4
T.B.Axiel
T.B.Disc
T.B.Set Lose Sigmet Type
T.B.Set Openwell
Sand Guard
Rotor Sleave SS
Rotor Sleeve SS Long
Oil Seal Sleeve
Coupling Mesh Type
Lower Flange
Upper Flange
Housing Cover Upper/Lower
Stud For Flange
Stud 10x45
Mitchel Type TB Set
Cable Gromete
O Ring
Circlip 25mm
Stator Lock
Drain Plug
Brass Screw
Allen Screw
Grove Washer 10mm
Nylock Nut 10mm
Rotor Nut
Cable Clip
Key For Coupling
Key For Disc
Set Of Rubber Parts
Hardware Set For Motor per HP
Hardware Set For Pump per Stage
Suction Chamber
Inlet Ring
Stage Casing Radial Flow v-6
Stage Casing Mix Flow v-6
Center DOL
NRV Body Radial Flow
NRV Body Mix Flow
Impeller Radial Flow v-6
Impeller Radial Flow LTB-4 v-6
Impeller Mix Flow v-6
Impeller Mix Flow LTB-4 v-6
Impeller Openwell per HP
Diffuser
Distane Bush
DOL Bush
Bearing Bush
Neck Ring Radial Flow
Neck Ring Mix Flow
Pump Shaft Per Stage
Shaft Key Per Stage
Pump Sleeve Radial Flow
Pump Sleeve Mix Flow
Coupling
NRV Ring
Pump Strainer
Cable Guard Per Stage
Tie Bolts Per Stage
Stud 8x33
Impeller Noril V-4
Stage Bowl Noril V-4
SS Tube V-4 Per MM
Suction Ring
Housing Bush V-8
Housing Bush-LTB-4 V-8
Upper Housing V-8
Lower Housing V-8
Adopter Piece V-8
Motor Base V-8
TB Set V-8
Impeller V-8
Stage Bowl V-8
Rotor Sleeve V-8
Pump Shaft V-8 Per MM
Pump Sleeve V-8
Pump Bush V-8
Neck Ring V-8
Cable Jointing to Winding
Stator Varnishing
Stator Slot Repairing Per Slot
Rotor M/c & Balancing Per HP
Rotor Repairing Per HP
Rotor Silver Filling Per HP
Impeller Filling M/c & Balancing
Stage Bowl Machining
Stator Side Repairing Per HP
Labour Charges For Pumpset Testing
Labour Charges For Motor
Labour Charges For Pump
SATISH KUMAR GUPTA CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .