Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹16.4 LAccepted-AOC | L-1 | Accepted-AOC ok | |
| 2 | L-2Rejected-Finance 143 INDUSTRIAL AREA PHASE 2 PANCHKULA HARYANA | PANCHKULA | PANCHKULA | HARYANA | L-2 | Rejected-Finance ok |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
27 Feb 2021, 3:00 pmClosed
Executive Engineer, W.S. Mech. Division, Rewari
Office of Executive Engineer, W.S. Mech. Division, Rewari
Replacement of 3 No. 100 HP LT Motor of Pump 20 CS at Pump House DD-4
2021_HRY_159534_9
288/6-A dated 03.02.2021
Open Tender
Pumps/Motors
Works
90 days
Executive Engineer, W.S. Mech. Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹30,000
14 Jun 2021
11 Feb 2021
1 Mar 2021
11 Feb 2021
27 Feb 2021
11 Feb 2021
Amount
Supply, erection and commissioning of solid shaft squirrel cage 100 HP LT Motor, 3 phase 415V, 975 RPM, induction Motor, TEFC Motor of IE 2 as per IS 12615. The color shade shall be RAL 7031, suitable for existing 20 Cs pump complete in all respect & as per approved specification of deptt. (as per Annexure-B)
Make of Motors - LV Motor- Marathon, ABB, Kirloskar Electric, Siemans, Crompton, Jyoti, BCH, Bharat Bijli. Terms & Conditions:- 1. The tender rate will be inclusive all taxes as applicable including GST. 2. The tender rate will be for F.O.R. destination and inclusive of all incidental charges, enroute & at destination. Nothing extra shall be paid separately. 3. WWC@1% will be deducted from the each bill of the agency. 4. The rate should be inclusive carriage, fitting and allied parts complete in all respect with left over items (if any) as per site requirement. 5. Goods which to be used / supplied should be as per sample and conforming to the site condition & also conforming to I.S. Specification. 6. Department will not be responsible for non submission of BOQ / Bid Document online by due date, due to any fault of internet/ E-tendering. 7. Third Party Testing by T.P.I.A. will be carried out in the presence of departmental representative at the manufacturer premises and cost of the same will be borne by the successful agency. 8. Completion period – completion period is 3 months. 9. Agreement for maintenance / service of the work will be drawn with L-1 Agency on the terms and conditions given in SLA issued by C.E./LCU, I&WR Department Haryana Panchkula letter No. 1089-91/NABARD/2020 dated 16.09.2020 (copy attached). Agreement shall be for five years or 10000:00 Hrs. of working of electro mechanic equipments from the date of commencement of the agreement. 10. Payment schedule, as per bidding documents. 11. Payment shall be made on finished goods and not on casting only. 12. The material will be supplied as per drawing and newly approved technical specifications laid down in tender documents & subsequent submission by bidder in this regard. 13. Successful agency will submit drawing of the work within week period from the date of approval of rate by competent authority. 14. Authorization from OEM be attached if tenderer is not a manufacturer. 15. Each page of bid book will be signed by the tenderer as a token of acceptance of terms and conditions. 16. Bidders may visit to the sites before quoting the tender rates.
Avon Engineering Company
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .