| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.4 LAccepted-AOC | 1 | Accepted-AOC Accepted as L1 bidder and all the documents found correct and awarded value is including GST. | |
| 2 | Rejected-Technical WARD NO 09 KOTMA COLLIERY DISTT ANUPPUR MP 484336 | ANUPPUR | MADHYA PRADESH | 484336 | - | Rejected-Technical Rejected as L3 bidder. | |
| 3 | Rejected-Technical | - | Rejected-Technical Rejected as L5 bidder. | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected as L4 bidder. | |
| 5 | Rejected-Technical | - | Rejected-Technical Rejected as L6 bidder. |
Tender Value
₹12.8 L
EMD Value
₹16,000
Closing Date
31 Jul 2023, 6:00 pmClosed
General Manager(Oprn.), JK Area
Office of The General Manager(Oprn.), JK Area, P.O-Jamuna Colliery, Dist. Anuppur (MP), Pin-484444, SECL, Bilaspur BILASPUR
Construction of 21 Nos. ventilation stopping in 8R panel of UK Bottom Seam and Construction of 01 Nos. RCC sectionalisation stopping 19L at U.K. Top Seam and Repairing of ventilation stopping at Meera Incline, Kotma Govinda Sub Area, JK Area.
2023_SECL_283975_1
SECL/JK/GM(O)/2023-24/eT/14 Dated 20.07.2023
Open Tender
Miscellaneous Works
Item Rate
270 days
Meera Incline, Kotma Govinda Sub Area, JK Area.
As per NIT
3 documents required · 3 mandatory
₹16,000
30 Nov 2023
20 Jul 2023
1 Aug 2023
20 Jul 2023
31 Jul 2023
21 Jul 2023
20 Jul 2023 - 24 Jul 2023
Amount
Silt/malma cleaning from U/G galleries and stacking at a lead of 50 Mtr.
Groove cutting for brick wall preparation.
Roof & floor (In soft stone for ventilation stopping)
Roof & floor ( Hard stone for RCC sectionalisation stopping)
Side mixed coal (both sides) & Coal (For ventilation stoppings)
Side mixed coal (both sides) & Coal (RCC sectionalisation stopping)
RCC work in UG including cetering, shuttering & Reinforcement. (For RCC sectionalisation stopping)
Brick work 1:6 ratio (cement+sand) upto 1.5 Mtr height (For ventilation stoppings)
Brick work 1:6 ratio (cement+sand) above 1.5 Mtr from plinth level (For ventilation stoppings)
12 MM thick cement plaster (single side) 1:6 ratio
loading of materials into tub at incline mouth
Unloading of materials at underground site.
Transportation of materials with tramming & pushing, coupling, uncoupling with haulage rope for a distance of every 500 Mtr or part, lead-1 bringing the empty tub at surface.
Transportation of steel material.
pushing of tubs for every 30 Mtr.
Lead of transportation of materials by manual labour up to 75 Mtr =Rs. 186.81 (i) 300-75=225/15=15*81.04=Rs.1201.95 (ii) Rs. 184.71+Rs. 1215.60=Rs. 1402.81
Lead for transportation of materials with tramming & pushing, coulping, uncoupling with haulage rope for a distance of every 500 Mtr or part lead 02 & bring the empty tub at surface = 2X 208.35 =Rs. 416.70.
Cost of materials
Cement
River Sand
Fly ash Bricks
Steel 10 MM
Stone chips (20 MM)
Total impact of GST for the purpose of CTC
Ram Awadh Singh
ANJANI KUMAR GAUTAM
KUTBUDDIN ANSARI
CHANDRA BHAN MISHRA
MAHENDRA SINGH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .