Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹15.3 LAccepted-Finance | ₹15.3 L | Ist | Accepted-Finance first lowest |
| 2 | IInd₹16.7 LRejected-Finance | ₹16.7 L | IInd | Rejected-Finance Second lowest |
| Sl No | Description | Qty | Unit | M/S RAM ASAREY PATEL L1 | ANAND KUMAR YADAV L2 |
|---|---|---|---|---|---|
| 1.00 | Earth Work in excavation with all type of soil including all labour cost T&P etc. required for proper completion of the work. | 143 | Cum | 5,720 ₹6,749.6 Lowest | 11,547.25 ₹13,625.76 |
| 2.00 | Preparation of sub grade for lining works including all labour cost T&P etc. required foe proper completion of the work. | 546 | Sqm | 5,460 ₹6,442.8 Lowest | 5,705.7 ₹6,732.73 |
| 3.00 | Supply and laying of local sand in foundation including cost of all material, labour and T&P etc. required for proper completion of work. | 27.3 | Cum | 24,570 ₹28,992.6 Lowest | 28,797.41 ₹33,980.94 |
| 4.00 | P.C.C. 1:3:6 CM with cement, coarse sand and hard stone ballast size 25 to 50 mm including cost of material, labour T&P etc. required for proper completion of work. | 54.6 | Cum | 1,80,180 ₹2,12,612.4 Lowest | 2,65,192.2 ₹3,12,926.8 |
| 5.00 | Class 150 (Ist class) brick masonry work with 1:4 CM including cost of all material, labour T&P etc. required for proper completion of the work. | 156.47 | Cum | 9,38,820 ₹11,07,807.6 | 8,86,402.55 ₹10,45,955.01 Lowest |
| 6.00 | C.C. 1:2:4 CM with cement, coarse sand and stone grit size 4.75 to 10 mm including cost of all material labour T&P etc. required for proper completion of work. | 18.85 | Cum | 62,205 ₹73,401.9 Lowest | 1,12,477.95 ₹1,32,723.98 |
| 7.00 | Cement Pointing in 1:2 CM on brick works (Struck deep) with cement & coarse sand including cost of all material, labour and T&P etc. required for proper completion of work. | 535.6 | Sqm | 42,848 ₹50,560.64 Lowest | 47,400.6 ₹55,932.71 |
| 8.00 | Earth work filling both side of Channel with all type of soil including with proper dressing & manual compaction , labour cost T&P etc. required for proper completion of the work. | 364 | Cum | 40,040 ₹47,247.2 Lowest | 59,404.8 ₹70,097.66 |
Tender Value
Refer Docs
EMD Value
₹33,400
Closing Date
10 Aug 2026, 1:00 pmClosed
EE Raja Ram Chaudhary
Executive Engineer Minor Lift Canal Division, Mirzapur
Construction of Brick Channel in Feeder Canal (Reach 0.300 Km to 0.560 Km) At Deegh Pump Canal.
2026_UPIDM_1166021_2
Tender Notice 04/EEMLCD/2026-27, lot-03
Open Tender
Civil Works
Item Wise
150 days
Vill-Khemapur, Block-Deegh, Dist-Bhadohi
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹33,400
19 Aug 2026
29 Jul 2026
10 Aug 2026
29 Jul 2026
10 Aug 2026
29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Earth Work in excavation with all type of soil including all labour cost T&P etc. required for proper completion of the work. | 143 | Cum | 95 | ₹13,585 | 18% |
| 2 | Preparation of sub grade for lining works including all labour cost T&P etc. required foe proper completion of the work. | 546 | Sqm | 12.3 | ₹6,715.8 | 18% |
| 3 | Supply and laying of local sand in foundation including cost of all material, labour and T&P etc. required for proper completion of work. | 27.3 | Cum | 1,241 | ₹33,879.3 | 18% |
| 4 | P.C.C. 1:3:6 CM with cement, coarse sand and hard stone ballast size 25 to 50 mm including cost of material, labour T&P etc. required for proper completion of work. | 54.6 | Cum | 5,714 | ₹3,11,984.4 | 18% |
| 5 | Class 150 (Ist class) brick masonry work with 1:4 CM including cost of all material, labour T&P etc. required for proper completion of the work. | 156.47 | Cum | 6,683 | ₹10,45,689.01 | 18% |
| 6 | C.C. 1:2:4 CM with cement, coarse sand and stone grit size 4.75 to 10 mm including cost of all material labour T&P etc. required for proper completion of work. | 18.85 | Cum | 7,020 | ₹1,32,327 | 18% |
| 7 | Cement Pointing in 1:2 CM on brick works (Struck deep) with cement & coarse sand including cost of all material, labour and T&P etc. required for proper completion of work. | 535.6 | Sqm | 104 | ₹55,702.4 | 18% |
| 8 | Earth work filling both side of Channel with all type of soil including with proper dressing & manual compaction , labour cost T&P etc. required for proper completion of the work. | 364 | Cum | 192 | ₹69,888 | 18% |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
T04L3Doc.pdf
Tender Documents • 1.01 MB
BOQ_2203594.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].