| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹51.2 LAdmitted-Finance | -34.11% | ₹51.2 L | L1 | Admitted-Finance |
| 2 | L2₹52.0 L+₹78,456.80 (1.53%)Admitted-Finance | -33.10% | ₹52.0 L+₹78,456.80 (1.53%) | L2 | Admitted-Finance |
| 3 | L3₹52.9 L+₹1.8 L (3.43%)Admitted-Finance | -31.85% | ₹52.9 L+₹1.8 L (3.43%) | L3 | Admitted-Finance |
| 4 | L4₹54.3 L+₹3.1 L (6.09%)Admitted-Finance | -30.10% | ₹54.3 L+₹3.1 L (6.09%) | L4 | Admitted-Finance |
| 5 | L5₹54.4 L+₹3.2 L (6.24%)Admitted-Finance | -30.00% | ₹54.4 L+₹3.2 L (6.24%) | L5 | Admitted-Finance |
Tender Value
₹77.7 L
EMD Value
₹1.6 L
Closing Date
25 Mar 2026, 4:00 pmClosed
Executive Engineer PWD Division Poonch
Executive Engineer PWD Division Poonch
Construction of 02 ACR,Science Room and Library Room in High School Gagrian,District Poonch
2026_PWDJK_306354_3
e-NIT No.138/2025-26 dated 16-03-2026
Open Tender
Civil Works
Percentage
180 days
Poonch
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
Yes
Executive Engineer PWD Division Poonch
₹1.6 L
Yes
28 Mar 2026
17 Mar 2026
26 Mar 2026
17 Mar 2026
25 Mar 2026
17 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil : | 177.3 | Cum | 256.85 | ₹45,539.51 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 26.7 | Cum | 5,202.9 | ₹1,38,917.43 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 41.38 | Cum | 7,788.4 | ₹3,22,283.99 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 70.39 | Cum | 5,733.6 | ₹4,03,588.1 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m . | 222.53 | Cum | 218.4 | ₹48,600.55 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation/plinth & superstructure above plinth level upto floor five level including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 76.84 | Cum | 9,027.2 | ₹6,93,650.05 |
| 7 | Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in superstructure above plinth level upto floor V level :Cement mortar 1:3 ( 1 cement : 3 coarse sand) &Extra for half Brick masonry in superstructure above plinth level upto floor V level. | 12.54 | Sqm | 1,106.9 | ₹13,880.53 |
| 8 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 10.56 | Cum | 9,395.7 | ₹99,218.59 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,
finishing and reinforcement with. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 43.41 | Cum | 9,821.85 | ₹4,26,366.51 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. | 11,442 | Kg | 123.2 | ₹14,09,654.4 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
Tendernotice_2.pdf
PDF • 0.90 MB
BOQ_994760.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .