Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹9.9 L
Closing Date
1 Sept 2026, 2:30 pm3d left
GM (Contracts)
Indian Oil Corporation Limited (Pipelines Division) A-1, Udyog Marg, Sector-1, NOIDA (UP) 201 301, INDIA
Offloading of Combined Station Works including civil, mechanical, electrical, telecom and instrumentation works at IOCL terminal in Vallur (Chennai) and CPCL refinery (Manali, Chennai) under Chennai Common Corridor POL Pipelines (CCCPL) Project
2026_PLHO_189951_1
PLCC/Offloading CCCPL CSW/M/26031
Open Tender
Mechanical Works
Tender cum Auction
183 days
As per tender documents
As per tender documents
9 documents required · 9 mandatory
₹9.9 L
Yes
Online through VC
1 Sept 2026
25 Jun 2026
2 Sept 2026
25 Jun 2026
1 Sept 2026
9 Jul 2026
25 Jun 2026 - 6 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2GST % for the tender Please select the rate of GST in cell AY13. Rate selected shall be applicable for the entire BoQ. | |||||
| 10CSW Service - Mech - Vallur | |||||
| 10.001 | "Booster Pumping Unit Installation:Booster Pumping Units Installation_A.i.2 Booster Pumping Unit Installation:, Taking delivery of b ooster pumping units having electrical motor & vertical turbine type centrif ugal pump and accessories from designated storage locat ion within the pump station, shifting and placing the equipments on the pre- constructed foundation, levelling, grouting and aligni ng the equipment, assembling together of all sub-assemblies, auxiliaries, moun tings, fittings, interconnecting piping etc., carryin g out trial run of motor on no load, coupling the electrical motor with the pum p, making final alignment, checking and testing of t he complete pumping unit and completing the work in all respects in accordance w ith the specification, drawings, manufacturer's ins tallation instructions, technical specifications and as per the instruction of th e Site Engineer / EIC., , Note: Electrical & Instr umentation connections are not included in this item., Note: Weight of equipment i s indicative only, Payment shall be done based on actual weight of equipment, Booster Pumping Units Installation_A.i.2" | 60 | TO | 45,880.92 | ₹27,52,855.2 |
| 10.002 | "Sump Pump Installation:Sump Pump_A.i.7 ""Sump Pump Installation:, Taking delivery of the following pumping units with electrical mo tors from designated location within sta tion premises, shifting/transporting to site, placing over Sump Tank Nozzle, assembling tog ether all sub-assemblies, alignment, grou ting, levelling, checking, providing assistance for taking trial run of electrical motor o n no-load, coupling the pump & motor, carr ying out the trial run of the complete unit, testing, making final alignment and complete work in all respects in accordance with t he relevant drawings, manufacturer's installation instruction, specifications and instru ctions of Site Engineer / EIC., , Note: Weig ht of equipment is indicative only, Payment shall be done based on actual weight of equ ipment, "" Sump Pump_A.i.7" | 3 | TO | 39,654.84 | ₹1,18,964.52 |
| 10.003 | Above Ground Equipments Installation:, Taking delivery of equipments, shifting/transporting within station premises, placing on pre -constructed foundations, assembling together all sub-assemblies, levelling, alignment, grouting, cleaning and flushing by water, d r aining, checking, testing, dressing and making good of the foundation and completing the work in all respects in accordance with th e relevant drawings, manufacturer's installation instruction, specifications and instructions of Site Engineer / EIC., Note: Weig ht of equipment is indicative only, Payment shall be done based on actual weight of equipment | - | - | - | - |
| 10.004 | Y - Type Strainer - 18" x18"- 150# (Approx Unit Weight =1.5 MT per Unit) | 9 | TO | 34,018.19 | ₹3,06,163.71 |
| 10.005 | Separator (Coalescer) Filter (Approx Unit Weight =15 MT per Unit) _B17 | 22 | TO | 30,280.56 | ₹6,66,172.32 |
| 10.006 | Single Basket Type Strainer - 18" x 150# (Approx Unit Weight =5 MT per Unit) | 25 | TO | 37,862.45 | ₹9,46,561.25 |
| 10.007 | Air eliminator (Approx unit weight : 7MT) | 7 | TO | 37,862.45 | ₹2,65,037.15 |
| 10.008 | Sump Tank Installation:, Taking delivery of Sump tank from designated godown / stockpile, shifting/transporting within station premi ses, placing on pre-constructed foundation, installation of auxiliary mountings and fittings, dressing and making good of the found a tion, grouting, cleaning and flushing with water, draining, testing, completing the work in all respects in accordance with the re levant drawings, manufacturer's installation instruction, specifications and instructions of Site Engineer / EIC (Foundation work sh all be paid separately under relevant items of Civil works). | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
TechnicalDrawings_Drawings.pdf
Tender Documents • 37.67 MB
TechnicalSpecifications_Mechanical&Civil_SPEC_MECH_CIVIL.pdf
Tender Documents • 22.99 MB
BOQ_200302.xls
BOQ • 0.95 MB
TechnicalSpecifications_Electrical&Instrumentation_SPC_ELE_INST.pdf
Tender Documents • 13.27 MB
PLCC26031.pdf
Tender Documents • 11.78 MB
CommercialAnnexures_AnnexureCommercial26031.xls
Tender Documents • 0.49 MB
CommercialAnnexures_Integrity Pact Format-Annexure-27.pdf
Tender Documents • 3.13 MB
CommercialAnnexures_MoPNG order dt 26042022.pdf
Tender Documents • 0.22 MB
CommercialAnnexures_PPE Guidelines.pdf
Tender Documents • 8.38 MB
CommercialAnnexures_PPP MII Order dated 16 09 2020.pdf
Tender Documents • 4.23 MB
TechnicalAnnexures_TechnicalAnnexures_TechnicalAnnexures.pdf
Tender Documents • 1.60 MB
Tender-Acceptance-Format.pdf
Additional Documents • 0.08 MB
FAQs-IOCL-Online-EMD.pdf
Additional Documents • 0.55 MB
Bidders_help_Document_for_Preferencial_Bidding_20230207_v1.pdf
Additional Documents • 0.82 MB
Special_Instructions_to_the_Bidders_Version_5_dated_30_June_2025.pdf
Additional Documents • 2.80 MB
Addendum6.pdf
PDF • 0.15 MB
Addendum5.pdf
PDF • 0.15 MB
Addendum4.pdf
PDF • 0.15 MB
Addendum2.pdf
PDF • 0.56 MB
Addendum3.pdf
PDF • 0.31 MB
Addendum1.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].