| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 CrAccepted-Finance 01 SIDDIGANJ ROAD KHACHROD TEHSIL ASHTA DISTRICT SEHORE M P | ₹5.9 Cr | L1 | Accepted-Finance ok |
| 2 | L2₹8.8 CrRejected-Finance | ₹8.8 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹9.9 CrRejected-Finance | ₹9.9 Cr | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | BRD SECURITY AGENCIES PRIVATE LIMITED L1 | M/s K.Rajesh & Company L2 | PANKAJ TIWARI L3 |
|---|---|---|---|---|---|---|
| 1.00 | 1. Survey, Design and Construction of
Sewage treatment plant of installed capacity 1.35 MLD and all appurtenant structures and allied works.
2. Providing, Laying & Supply of 300mm diameter pipeline comprising of RCC NP3 pipe having length of 1600 m for (Gravity Based) sewerage system including sewer appurtenances as required.
3. Construction of Sufficient numbers of 900/1200/1500 mm bottom Dia and 560 mm top Dia Circular Manholes with Cement concrete cover and manhole spacing at up to 30m distance
4. Catch Basin having drain (Nallah) width more than 75 cm and connecting the catch basin to Main Sewer.
5. Reuse of the Treated Sewer for the Green Space and agricultural purposes comprising of DIK-7 pipe of 150mm diameter having the length of 510 meters of distribution pipe.
6. Providing and laying of HT Feeder having the length of 2.30 kms and Electrical Substation.
7. Planting of Trees and their Maintenance for one Year (Planting of trees by the roadside (Avenue trees) in 0.60 m dia holes and maintaining the plants for one year).
8. Construction of hydrant of 5.0-meter height for filling the tankers, to supply treated wastewater to the town for various non potable uses | 1 | Lump-Sum | 2,97,00,000 ₹2,97,00,000 | 3,21,10,000 ₹3,21,10,000 | 3,29,04,590.5 ₹3,29,04,590.5 |
| 2.00 | Operation and Maintenance Cost For 1st Years | 1 | Lump-Sum | 10,72,000 ₹10,72,000 | 15,86,700 ₹15,86,700 | 17,19,806.5 ₹17,19,806.5 |
| 3.00 | Operation and Maintenance Cost For 2nd Years | 1 | Lump-Sum | 10,72,000 ₹10,72,000 | 16,81,902 ₹16,81,902 | 18,22,994.89 ₹18,22,994.89 |
| 4.00 | Operation and Maintenance Cost For 3rd Years | 1 | Lump-Sum | 11,72,000 ₹11,72,000 | 17,82,816 ₹17,82,816 | 19,32,374.78 ₹19,32,374.78 |
| 5.00 | Operation and Maintenance Cost For 4th Years | 1 | Lump-Sum | 10,72,000 ₹10,72,000 | 18,89,785 ₹18,89,785 | 20,48,316.86 ₹20,48,316.86 |
| 6.00 | Operation and Maintenance Cost For 5th Years | 1 | Lump-Sum | 11,72,000 ₹11,72,000 | 20,03,172 ₹20,03,172 | 21,71,216.2 ₹21,71,216.2 |
| 7.00 | Operation and Maintenance Cost For 6th Years | 1 | Lump-Sum | 11,72,000 ₹11,72,000 | 21,23,362 ₹21,23,362 | 23,01,489.35 ₹23,01,489.35 |
| 8.00 | Operation and Maintenance Cost For 7th Years | 1 | Lump-Sum | 12,72,000 ₹12,72,000 | 22,50,764 ₹22,50,764 | 24,39,578.2 ₹24,39,578.2 |
| 9.00 | Operation and Maintenance Cost For 8th Years | 1 | Lump-Sum | 12,72,000 ₹12,72,000 | 23,85,810 ₹23,85,810 | 25,85,952.95 ₹25,85,952.95 |
| 10.00 | Operation and Maintenance Cost For 9th Years | 1 | Lump-Sum | 13,72,000 ₹13,72,000 | 25,28,958 ₹25,28,958 | 27,41,110.13 ₹27,41,110.13 |
Tender Value
₹3.4 Cr
EMD Value
₹1.7 L
Closing Date
25 Feb 2026, 6:00 pmClosed
CMO
Office of Nagar Parisad Rehti
7th Call for Interception and Diversion of Nallahs with STP works Project of Rehti town under SBM 2.0
2026_UAD_481569_1
107
Open Tender
Civil Works - Others
365 days
Rehti
as per tender Tender Document
8 documents required · 8 mandatory
₹15,000
₹1.7 L
Rehti
19 May 2026
11 Feb 2026
27 Feb 2026
11 Feb 2026
25 Feb 2026
11 Feb 2026
11 Feb 2026 - 25 Feb 2026
19 Feb 2026
1. Survey, Design and Construction of Sewage treatment plant of installed capacity 1.35 MLD and all appurtenant structures and allied works. 2. Providing, Laying & Supply of 300mm diameter pipeline comprising of RCC NP3 pipe having length of 1600 m for (Gravity Based) sewerage system including sewer appurtenances as required. 3. Construction of Sufficient numbers of 900/1200/1500 mm bottom Dia and 560 mm top Dia Circular Manholes with Cement concrete cover and manhole spacing at up to 30m distance 4. Catch Basin having drain (Nallah) width more than 75 cm and connecting the catch basin to Main Sewer. 5. Reuse of the Treated Sewer for the Green Space and agricultural purposes comprising of DIK-7 pipe of 150mm diameter having the length of 510 meters of distribution pipe. 6. Providing and laying of HT Feeder having the length of 2.30 kms and Electrical Substation. 7. Planting of Trees and their Maintenance for one Year (Planting of trees by the roadside (Avenue trees) in 0.60 m dia holes and maintaining the plants for one year). 8. Construction of hydrant of 5.0-meter height for filling the tankers, to supply treated wastewater to the town for various non potable uses
Operation and Maintenance Cost For 1st Years
Operation and Maintenance Cost For 2nd Years
Operation and Maintenance Cost For 3rd Years
Operation and Maintenance Cost For 4th Years
Operation and Maintenance Cost For 5th Years
Operation and Maintenance Cost For 6th Years
Operation and Maintenance Cost For 7th Years
Operation and Maintenance Cost For 8th Years
Operation and Maintenance Cost For 9th Years
Operation and Maintenance Cost For 10th Years
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 1st year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 2nd year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 3rd year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 4th year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 5th year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 6th year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 7th year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 8th year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 9th year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 10th year
Power Consuption @ 6.5 Rs per unit For 1st Year
Power Consuption @ 6.5 Rs per unit For 2nd Year
Power Consuption @ 6.5 Rs per unit For 3rd Year
Power Consuption @ 6.5 Rs per unit For 4th Year
Power Consuption @ 6.5 Rs per unit For 5th Year
Power Consuption @ 6.5 Rs per unit For 6th Year
Power Consuption @ 6.5 Rs per unit For 7th Year
Power Consuption @ 6.5 Rs per unit For 8th Year
Power Consuption @ 6.5 Rs per unit For 9th Year
Power Consuption @ 6.5 Rs per unit For 10th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 1st Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 2nd Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 3rd Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 4th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 5th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 6th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 7th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 8th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 9th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 10th Year
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.07 MB
TenderDocument.pdf
Tender Documents • 1.37 MB
AnnexureE.pdf
Other Document • 1.57 MB
BOQ_565989.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid