Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹99,000
EMD Value
₹4,950
Closing Date
3 Dec 2026, 6:55 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
Improvement of culvert with pbund near lo assadullah bhat and others at dabipora
2026_RDPR_331989_96
NIT_135_REW_BUDGAM_2026-27
Open Tender
Civil Works
Percentage
30 days
KHANSAHIB
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹4,950
Yes
23 Nov 2026
23 Nov 2026
4 Dec 2026
23 Nov 2026
3 Dec 2026
23 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying of dry stone soling duly hand packed including carriages by all means | 0.51 | cum | 1,343.21 | ₹685.04 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm N. size). 20% plum incl carriage. | 3.65 | cum | 5,733.6 | ₹20,927.64 |
| 3 | Centering/Shuttering including strutting, proping and removal of formwork for foundition, footings, bases of columns. | 13 | SqM | 286.35 | ₹3,722.55 |
| 4 | Centering/Shuttering including strutting, proping and removal of formwork for suspended floors,roofs, landings,balconiesand access platforms etc. | 14.13 | SqM | 718.2 | ₹10,148.17 |
| 5 | Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm N. size). 20% plum incl carriage. | 3.57 | cum | 7,104.35 | ₹25,362.53 |
| 6 | Steel reinforcement for RCC work including straightening, cutting,bending placing in position and binding all complete upto plinth level medium tensile steel bars etc. | 2.8 | qtl | 11,535 | ₹32,298 |
| 7 | Carriage of stone aggregate avg lead 25 Km | 5.97 | cum | 465.14 | ₹2,776.89 |
| 8 | Carriage of sand avg lead 30 Km | 2.98 | cum | 520 | ₹1,549.6 |
| 9 | Add Provision for CIB,Photographs,HL if any, cutting of trees and other unforseen items. | 1 | No. | 1,529.58 | ₹1,529.58 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_1126960.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .