Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC PO AMLOHRI NAWANAGAR DISTT SINGRAULI MP | SINGRAULI | MP | ₹1.3 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹1.3 LRejected-Finance 0 MG RAOD NEAR KAMLA NEHRU HIGH SCHOOL WARDHA WARDHA MAHARASHTRA 442001 | WARDHA | MAHARASHTRA | 442001 | ₹1.3 L | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹1.3 LRejected-Finance 0 BHAGYODAY BUILDING BANK MORE DHANSAR ROAD DHANBAD JHARKHAND 826001 UDYAM JH 04 0034614 | DHANBAD | JHARKHAND | 826001 | ₹1.3 L | L3 | Rejected-Finance L3 bidder |
| Sl No | Description | Qty | Unit | M/S P R ENTERPRISES L1 | PRABHA ENTERPRISES L3 | A.B. ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.01 | Cost of transformer insulating covering coil (37.5 Kg for one transformer) | 187.5 | Kg | 900 ₹1.7 L | 750 ₹1.4 L | 750 ₹1.4 L |
| 1.02 | Cork sheet gasket | 5 | Sheet | 500 ₹2,500 | 1,000 ₹5,000 | 1,000 ₹5,000 |
| 1.03 | Labour charges for fixing of above material with draining, refilling of transformer oil, opening and fixing of top cover after rewinding as per the instruction of EIC | 1 | Job | 10,000 ₹10,000 | 20,000 ₹20,000 | 20,000 ₹20,000 |
| 1.04 | Cost of insulating material like nomex paper, Dr. brand varnish, cotton tape, Press pan paper etc. | 1 | Job | 5,000 ₹5,000 | 7,500 ₹7,500 | 7,500 ₹7,500 |
| 1.05 | Oil seal for HT and LT bushing | 35 | Nos. | 200 ₹7,000 | 150 ₹5,250 | 140 ₹4,900 |
| 1.06 | Stud for HT and LT bushing with all the arrangements | 10 | Nos. | 100 ₹1,000 | 1,800 ₹18,000 | 1,750 ₹17,500 |
| 1.07 | Less scrap/burnt copper coil | 187.5 | Kg | 450 -₹84,375 | 450 -₹84,375 | 450 -₹84,375 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹1.7 L
EMD Value
₹2,100
Closing Date
13 Sept 2025, 6:55 pmClosed
SO(ENM), Jhingurda Project
SO(ENM) Office, Jhingurda Project
Repairing/rewinding of transformers 25KVA (6.6KV/3.3KV/220V) used for the mines lighting
2025_NCL_341886_1
NCL/JRD/ENM/Tender/25-26/19
Open Tender
Electrical and Maintenance Works
15 days
Jhingurda Project
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,100
8 Jun 2026
20 Aug 2025
15 Sept 2025
20 Aug 2025
13 Sept 2025
20 Aug 2025
20 Aug 2025 - 10 Sept 2025
Amount
Cost of transformer insulating covering coil (37.5 Kg for one transformer)
Cork sheet gasket
Labour charges for fixing of above material with draining, refilling of transformer oil, opening and fixing of top cover after rewinding as per the instruction of EIC
Cost of insulating material like nomex paper, Dr. brand varnish, cotton tape, Press pan paper etc.
Oil seal for HT and LT bushing
Stud for HT and LT bushing with all the arrangements
Less scrap/burnt copper coil
Total impact of GST for the purpose of CTC
A.B. ENTERPRISES (BID ID -1182375)
PRABHA ENTERPRISES (BID ID -1181107)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid