| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-Finance | ₹4.8 L | L1 | Accepted-Finance 1st Lowest |
| 2 | L2₹4.9 LRejected-Finance | ₹4.9 L | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹4.9 LRejected-Finance CHAKMADA HANDIA PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | ₹4.9 L | L3 | Rejected-Finance 3rd Lowest |
| Sl No | Description | Qty | Unit | BALAJI CONSTRUCTIONS L3 | M/S IRFAN TRADERS L2 | A G Construction L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T&P, leads and lift etc complete. | 91 | Cum | 80 ₹7,280 | 79 ₹7,189 | 50 ₹4,550 |
| 2.00 | Providing and Laying M-15 (C.C. 1:2:4) cement concrete i/c cost of all material, labour, T&P etc. complete | 52.75 | Cum | 5,189.7 ₹2.7 L | 5,189.7 ₹2.7 L | 5,189.7 ₹2.7 L |
| 3.00 | Providing and Laying M-10 (C.C. 1:3:6) cement concrete including cost of all materials, labour T&P, all lifts and leads etc. complete. | 5.4 | Cum | 4,832.45 ₹26,095.23 | 4,832.45 ₹26,095.23 | 4,832.45 ₹26,095.23 |
| 4.00 | Providing and laying C.C. blocks in 1:2:4 (M-15 grade) cement concerete including cost of all materials, labour, T&P all lifts and leads etc. complete | 61 | Nos | 1,267.75 ₹77,332.75 | 1,267.75 ₹77,332.75 | 1,267.75 ₹77,332.75 |
| 5.00 | Providing and laying of Pea Gravel 20 to 40 mm size including cost of all materials, carriage, labour, T&P, all lifts and leads etc. complete. | 6.4 | Cum | 1,937.35 ₹12,399.04 | 1,937.35 ₹12,399.04 | 1,937.35 ₹12,399.04 |
| 6.00 | Providing and laying of coarse sand including cost of all materials, carriage, labour, T&P, all lifts and leads etc. complete. | 0.65 | Cum | 2,218.15 ₹1,441.80 | 2,218.15 ₹1,441.80 | 2,218.15 ₹1,441.80 |
| 7.00 | Providing and laying of fine sand including cost of all materials, carriage, labour, T&P, all lifts and leads etc. complete. | 0.65 | Cum | 1,588.5 ₹1,032.53 | 1,588.5 ₹1,032.53 | 1,588.5 ₹1,032.53 |
| 8.00 | Providing and Laying M-25 C.C. (1:1:2) cement concrete including cost of all materials, labour, T&P, all lifts and leads etc. for proper completion of work. | 0.53 | Cum | 6,767.8 ₹3,586.93 | 6,767.8 ₹3,586.93 | 6,767.8 ₹3,586.93 |
| 9.00 | Providing and Laying R.C.C. 1:1.5:3 cement concrete including cost of all materials, labour, T&P, all lifts and leads etc. for proper completion of work. | 3.57 | Cum | 5,978.25 ₹21,342.35 | 5,978.25 ₹21,342.35 | 5,978.25 ₹21,342.35 |
| 10.00 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads, all labour and T&P etc. for proper completion of work. | 0.18 | M.T | 57,205.5 ₹10,296.99 | 57,205.5 ₹10,296.99 | 57,205.5 ₹10,296.99 |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
25 Apr 2026, 12:00 pmClosed
Executive Engineer MGCC D15MBD
EEMGCCDIV15MBD
Construction of Janeta Minor Head At km 2.950 of Prahaladpur Dy. Under MGC Stage IInd.
2026_UPIDC_1135692_7
01/EE/2026-27
Open Tender
Civil Works
45 days
Sambhal
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹10,000
EEMGCCDIV15MBD
29 Apr 2026
15 Apr 2026
25 Apr 2026
15 Apr 2026
25 Apr 2026
15 Apr 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T&P, leads and lift etc complete. | - | Cum | - | - |
| 2 | Providing and Laying M-15 (C.C. 1:2:4) cement concrete i/c cost of all material, labour, T&P etc. complete | - | Cum | - | - |
| 3 | Providing and Laying M-10 (C.C. 1:3:6) cement concrete including cost of all materials, labour T&P, all lifts and leads etc. complete. | - | Cum | - | - |
| 4 | Providing and laying C.C. blocks in 1:2:4 (M-15 grade) cement concerete including cost of all materials, labour, T&P all lifts and leads etc. complete | - | Nos | - | - |
| 5 | Providing and laying of Pea Gravel 20 to 40 mm size including cost of all materials, carriage, labour, T&P, all lifts and leads etc. complete. | - | Cum | - | - |
| 6 | Providing and laying of coarse sand including cost of all materials, carriage, labour, T&P, all lifts and leads etc. complete. | 1 | Cum | - | - |
| 7 | Providing and laying of fine sand including cost of all materials, carriage, labour, T&P, all lifts and leads etc. complete. | 1 | Cum | - | - |
| 8 | Providing and Laying M-25 C.C. (1:1:2) cement concrete including cost of all materials, labour, T&P, all lifts and leads etc. for proper completion of work. | - | Cum | - | - |
| 9 | Providing and Laying R.C.C. 1:1.5:3 cement concrete including cost of all materials, labour, T&P, all lifts and leads etc. for proper completion of work. | 1 | Cum | - | - |
| 10 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads, all labour and T&P etc. for proper completion of work. | 1 | M.T | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_2121239.xls
BOQ • 0.29 MB
tenderdocumentslot7.pdf
Tender Documents • 1.66 MB
Download all tender documents and submit your bid