Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-Finance | L1 | Accepted-Finance Accept | |
| 2 | L2₹2.2 L+₹1,325.47 (0.61%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | L3₹2.2 L+₹2,172.90 (1.00%)Rejected-Finance R N SINHA ROAD DARJEELING | DARJEELING | DARJEELING | WEST BENGAL | L3 | Rejected-Finance Reject |
Tender Value
₹2.2 L
EMD Value
₹4,346
Closing Date
28 Jan 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Pradhan
Pokhriabong II GP
Construction of Pony Road from Sungma Bich goan Primary School to Darshan House under Pokhriabong II GP 15th FC plan 2025-26
2026_GTA_990650_4
24-POK-II-15FC-2025-26/ Plan
Open Tender
CIVIL WORKS
Percentage
Pokhriabong II GP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,346
Yes
13 Mar 2026
19 Jan 2026
31 Jan 2026
20 Jan 2026
28 Jan 2026
20 Jan 2026
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. .
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
Cost of stone boulder 150 mm size delivered ans stacked at site.
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes.
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
Supplying and laying chequered tiles of any shade & ofapproved quality with (1:1½:3) cement concrete laid in panelsor patterns as directed in pavement, footpath etc. includingnecessary underlay 25 mm thick [avg] cement mortar (1:3)complete in all respect with all labour and materials. [Usingcement slurry @ 4.4 kg/Sq.m at back side and @2.4 kg/Sq.mfor joint filling] Red Variety
Labour Cess
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
3ndINSTALMENTNIT202526.pdf
Tender Documents • 0.58 MB
BOQ_2422073.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .