| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.8 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹6.0 L+₹31,390 (5.53%)Rejected-AOC TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | 2 | Rejected-AOC L2 |
Tender Value
₹5.6 L
EMD Value
₹5,600
Closing Date
20 Jul 2019, 2:00 pmClosed
SE M II / TTPS
Superintending Engineer, Mechanical-II, Tuticorin Thermal Power Station, Tuticorin 628004.
TTPS Mech II BM Unit I Providing scaffolding arrangement in A B C D path of ESP outlet funnel removing the insulation replacement of the wornout top portion of the ESP outlet funnel assembly
2019_EB_130955_1
SE / M-II / TTPS / Spec.No.180/2019-20
Open Tender
Miscellaneous Works
Item Rate
20 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹5,600
Yes
20 Jan 2020
5 Jul 2019
22 Jul 2019
5 Jul 2019
20 Jul 2019
5 Jul 2019
Charges for removal of the ash accumulated over the top of the ESP outlet funnel in A,B, C & D path of Unit I and collecting ash in gunny bags, cleaning the duct with compressed air, lowering the gunny bags to ground level and transportation of the ash to the debris yard including cost of consumables.
Charges for transportation of required scaffolding materials clamps, wooden planks etc., from stores to site, leading, lifting and erection of temporary platform inside & side of the top panel assemblies of ESP outlet funnel A, B, C & D path of Unit I for removing the insulation, wornout top panel assemblies, erecting with new one & providing insulation over the newly erected top panel assemblies and dismantling the platform & returning to stores after completion of work.
Charges for cutting the wornout top panel assemblies & pipe supports in A, B, C & D path of Unit I ESP outlet funnel and devolution of scraps to stores
Charges for fixing of new top panel assemblies and replacement of the damaged pipe support with new one in A, B, C & D path of Unit I ESP outlet funnel and welding including all consumables and T&P's.
Charges for removal of the cladding sheet, insulation lagging from the ESP outlet funnel assembly in A, B, C &D path of Unit I, devolution of scraps to stores and disposal of debris to debris yard and relaying with new insulation (Single layer insulation wool mattresses) in the above said areas including cost of insulation fixing materials, Wool mattresses & G.I sheets , consumable, T&P etc complete.
PANDIAN ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .