Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | L1 | Accepted-AOC AS L1 BIDDER | |
| 2 | L2₹3.2 L+₹4,036.68 (1.27%)Rejected-AOC 36 JESSORE ROAD HRIDAYPUR RATHTALA NORTH 24 PARGANAS | L2 | Rejected-AOC AS L2 BIDDER | |
| 3 | L3₹3.3 L+₹8,937.61 (2.81%)Rejected-AOC 00 0 0 LD PALACE ROAD VILLAGE TOWN CHHOTAUDEPUR CITY VADODARA VADODARA GUJARAT 391165 INDIA | CHHOTAUDEPUR | GUJARAT | 391165 | L3 | Rejected-AOC AS L3 BIDDER |
Tender Value
Refer Docs
EMD Value
₹6,570
Closing Date
26 Sept 2022, 6:30 pmClosed
EXECUTIVE ENGINEER,CMD,PHED
EE,CMD,PHED,5 TH FLOOR,PURTA BHAWAN
Servicing-and-Overhauling-of-2-Nos-1000KVA-Transformers-11KV-0.433KV-at-Kamalnagar-Water-Treatment-Plant-Purbasthali-II-Block-Dist-Purba-Bardhaman-under-CMD-PHE-Dte
2022_PHED_399738_2
WBPHED/EE/CMD/eNIT-16/2022-23
Open Tender
CIVIL AND ELECTRICAL WORKS
Item Rate
21 days
PURBASTHALI
Servicing-and-Overhauling-of-2-Nos-1000KVA-Transformers-11KV-0.433KV-at-Kamalnagar-Water-Treatment-Plant-Purbasthali-II-Block-Dist-Purba-Bardhaman-under-CMD-PHE-Dte
5 documents required · 5 mandatory
₹6,570
EXECUTIVE ENGINEER CENTRAL MECHANICAL DIVISION PHE
9 Nov 2022
12 Sept 2022
29 Sept 2022
12 Sept 2022
26 Sept 2022
13 Sept 2022
13 Sept 2022
Amount
Thorough checking of 1000KVA Transformar (11KW/0.433KW) for Servicing and Overhauling by Expart Service Engineer as per direction of EIC.
Charges for removing transformer oil from transformer (Capacity 1400 Ltrs. Along with OLTC) by centrifugal type oil filtering machine for Servicing and Overhauling as per direction of EIC. (For 2 Nos Transformer)
Dismantling charges 1000KVA Transformar (11KW/ 0.433KW) covers thoroughly part by part by expart technicians in presence of service engineer Servicing and Overhauling as per direction of EIC.
Supply and delivery of 6mm thick rubber gaskit sets forreplacement of all gaskits of 1000KVA Transformar (11KW/ 0.433KW) as per direction of EIC. (For2 Nos Transformer)
Servicing and Overhauling of 1000KVA Transformer (11KV/0.433KV) including removing of diposited carbons from the internal parts of OLTC portion of transformer by engaging skilled technicians in presence of service engineer as per direction of EIC.
Making holes in the supplied rubber gaskit for 5/8" dia bolt and fitting-fixing all gaskits including its covers of 1000KVA Transformar (11KW/ 0.433KW) properly part by part by expart technicians in presence of service engineer after Servicing as per direction of EIC.
Supply, delivery of "Power Brand" Transformer oil. (210Ltrs. Capacity Container 3Nos & 35Ltrs. Capacity contaner 1No ) for top up in the Transformer oil after topping up of fresh oil were tested as required breakdown voltage (60KV) for 1 min. without any flashig & moisture content. to maintain proper oil level in the conservator.
Charges for refilling of new supplied transformer oil and old reuseable transformer oil in the transformer (Capacity 1400 Ltrs. Along with OLTC) by centrifugal type oil filtering machine including filtration of transformer oil and tested as required breakdown voltage (60KV) for 1 min. without any flashig & moisture content. to maintain proper oil level in the conservator. as per direction of EIC. (For2 Nos Transformer)
Testing of Transformer after Servicing and Overhauling in running with full Load condition for minimum 8 hours with full satisfaction of EIC. (For2 Nos Transformer)
Add. GST@12%
Add. Cess@1%
INDIA ENTERPRISE
S.K. ENTERPRISE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .