| 1 | L1₹5.9 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | L2₹5.9 L+₹105.92 (0.02%)Rejected-AOC | L2 | Rejected-AOC rejected |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
31 May 2023, 3:00 pmClosed
Block Development officer,sirkali block
Block Development office,sirkali block
Construction of Retaining wall at Mela Voikal in Kanniyakudi Panchayat IN SIRKALI BLOCK PMAGY 2021-2022
2023_RDTN_307397_2
1575/2020/B1
Open Tender
Civil Works
Item Rate
120 days
Block Development office, sirkali block
Refer tender notice
8 documents required · 8 mandatory
₹0
₹6,000
Yes
Block Development office,sirkali block
8 Jun 2023
25 May 2023
31 May 2023
25 May 2023
31 May 2023
26 May 2023
26 May 2023 - 26 May 2023
26 May 2023
Amount
1.Construction of Retaining wall at Mela Voikal in Kanniyakudi Panchayat
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead and lift including all labour charges and incidental charges such as shoring strutting providing coffer dams baling out water and other item which may be necessary or convenient to the successful completion of the excavation to the bottom of foundation and of back filling in a compacted condition a quantity of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc. complete for foundation as per standard specification for Retaining wall and culverts as per SS20B
Supplying and filling with good river sand including cost and conveyance of sand from approved sources to worksite and stacking the same to departmental metric gauge for taking premeasurement laying layers of not more than 150mm thick watering and tamping with all leads for soft water and including labour charges and all other incidental charges etc. complete as per standard specification for C.D. works
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works Below Sill
Supplying and erecting centering are strutting including necessary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon
Provision for Chitizen Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
s.agoram
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .