| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹78.7 L+₹7.4 L (10.4%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹88.8 L+₹17.5 L (24.6%)Rejected-AOC 46 B MUIRABAD ALLAHABAD | ALLAHABAD | PRAYAGRAJ | UTTAR PRADESH | L3 | Rejected-AOC L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹79.3 L
EMD Value
₹1.6 L
Closing Date
25 Jan 2023, 3:00 pmClosed
OFFICE OF THE SUPERITENDING ENGINEER IWC PRAYAGRAJ
OFFICE OF THE SUPERITENDING ENGINEER IWC 9 TB SAPRU ROAD , CIVIL LINE, PRAYAG 211001
Construction of CR stone masonry boundary wall, renovation of inspection house, ziledar office and staff quarters at Manda Inspection house, Prayagraj.
2023_UPIDC_764223_8
07/SE/2022-23
Open Tender
Civil Works - Buildings
Item Wise
120 days
MANDA PRAYAGRAJ
Construction of CR stone masonry boundary wall, renovation of inspection house, ziledar office and staff quarters at Manda Inspection house, Prayagraj.
2 documents required · 2 mandatory
₹2,354
₹1.6 L
1 Mar 2023
18 Jan 2023
25 Jan 2023
18 Jan 2023
25 Jan 2023
19 Jan 2023
Amount
E/w in excavation of foundation including all lead and lift, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Supplying & Laying C.C. 1:3:6 in bed of wall (one part of cement, 3 part of coarse sand F>2.00, 6 part of stone ballast 22.4 to 53 mm) including cost of all materials, labours and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
C.R.S. Masonary with 1:3 C.M. (one part of cement, three part of coarse sand FM>2.00) including cost of all material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
75 MM thick C.C 1:2:4 on wall coaping with 10-20 mm size stone grit including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
20 mm deep struck cement pointing on stone masonary with 1:2 C.M. including cost of all material, labours and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Providing and Fixing in position on angle iron section ISA 25X25X5 MM thick berbed wire fancing including cutting, cost of all materials with one coat of red oxide primer, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Providing GI brbed wire fancing including fixing it to post offer stretching it including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Steel reinforcement in piller, bed and wall including cutting bending, binding and placing in proper position including cost of steel, binding wire, labour and t&p etc.required for proper completion of work as per direction of Engineer-in-Charge.
Laying C.C 1:1.5:3 with 10-20 mm size stone grit including cost of all materials, labour and T&P etc.required for proper completion of work as per direction of Engineer-in-Charge.
Centering & shuttering for R.C.C. column including cost of all materials labour T&P etc required for proper completion of work as per direction of Engineer-in-Charge.
Supply and fixing of steel gate (Main gate for Boundery wall Manda IH ) including cost of all materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Dismantling of cement concrete floor including base concrete, disposal of dismental material, all labours, lead, lift & T&P tc. required for proper completion of work as per direction of Engineer-in-Charge.
Dismantling of existing cement plaster including disposal of refuge, all labours, lead, lift & T&P tc. required for proper completion of work as per direction of Engineer-in-Charge.
Plastering on old surface of wall in 1:3 in cement sand mortor including cost of all materials, all labours and T&P tc. required for proper completion of work as per direction of Engineer-in-Charge.
Supply & Laying C.C. 1:2:4 with coarse sand, cement, stone ballast 10 to 20 mm in size in flooring including cost of all materials, labours,T&Ptc. required for proper completion of work as per direction of Engineer-in-Charge.
Supply & Fixing pressed steel Chaukhat made of M.S. Sheet 18 gauge (1.25 mm.) including iron hinges of 100 X 3 MM. I.S.I. Mark drilling holes of L-drop, tower bolt and 230 x 40 X 6 mm. flat iron hold fast including supply of all materials, labor, T&P ,carriage up to site with one coat of red oxide primer
Supply and Fixing of 4.5 cm thick seasoned wood partly panelled and partly glazed door and window Shuliters including supply and lixing of wooden cleats and stops and including fixing & adjustment or hinges, bolts, lacks handles springs and/or other fittings but excluding painting with two coats of Black. Japan on all iron fittings if necessary and including fixing the glass panels with putty and brand, filling, with necessary screws to be supplied departmentally.
Supply and Fixing of anodized alumunium door for Toilet having 2 mm thick aluminium section (excluding coating) fully glazed made of aluminium door tube size 83.5x 44.65 m as vertical member and 1140 x 44.45 mm size tube in bottom and horizontal member door chaukhat should be of aluminium tubular vertical with two openable shutter including cost of material fixtures 4 mm glass, handles, locks, screws, necessary bending excluding cost of floor spring if required for proper compltion of the work as per direction of Engineer-in-charge.
Supply & Fixing 6.00 mm china white glazed tiles on flooring and skirting or dado including cost of all materials & Labours and T&P etc .required for proper completion of work as per direction of Engineer-in-Charge.
Supply & Fixing 6.00 mm china white glazed tiles on Wall including cost of all materials & Labours and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Painting on new steel Surface including all cost of materials, labour, t&p etc. required for proper completion of work as per direction of Engineer-in-Charge.
Painting on wooden surface door & window complete with all materials and T&P etc. required for proper completion of Work as per direction of Engineer-in-Charge.
Painting for internal of building one coat of primer, putty and oil bound distemper on new surface (excluding cost of primer) superior quality such as luxol, higloss, apcolite, superiarc. dulux, including cost of all material, labour T&P etc. required for proper completion of work.
Painting two coat of Synthetic enamel paint on new surface for exterior (excluding cost of primer) superior quality such as luxol, higloss, apcolite, superiarc. dulux, including cost of all material, labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Supply & Fixing Sanitary fittings Ceat make type/ any approved brand Indian toilet Sheet with P trap, Cistern, and many miscellaneous item - tap, Cloth-pegs, towel-rod, mirror, sink for kitchen, tap, Sintex 0.500 KL included plubering work with PVC pipe, elbow joints, sockets, and all fittings and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. (included with cost of item)(L/S)
Rennovacation of electric wiring of Building including all materials, labour, fitings and fixtures etc. required for proper completion of work as per direction of Engineer-in-Charge.
Dismentaling of R.B. Slab including disposal of refuge, all labours, lead, lift and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
25mm. cement concrete flooring 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20 mm. nominal size) laid in one layer finished with a floating coat of neat cement ettc. required for proper completion of work as per direction of Engineer-in-Charge.
Fixing glass strips 3 mm. thick 32 mm wide in joints of floor and skirting at the time of laying floors flush with floor level including cost of all material, laoour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
First Class brick masonry in cement and coarse sand mortor in 1:4 ration, including cost of all materials, labours, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Dismantling of brick work in cement mortor including stacking of bricks as per direction of Engineer-in-Charge within a distance of 60 M etc. required for proper completion of work as per direction of Engineer-in-Charge.
Suplying and fabrication of mild steel / iron Chaukhat in door for staff quaters with 35x35x6 mm angle flat iron hold fast including supply of all materials, labor, T&P ,carriage up to site with one coat of red oxide primer etc. required for proper completion of work as per direction of Engineer-in-Charge.
Precast R.C.C. work 1:1.5:3 excludiing reinfcrcement, Centerinng & Shuttering etc. required for proper completion of work as per direction of Engineer-in-Charge.
40 mm size brick aggrigate filling including cost of all material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Local Sand filling outer the Soak pit including cost of all material, labour, T&P, etc. required for proper completion of work as per direction of Engineer-in-Charge.
S/F 100mm dia S.W pipe L/S including cost of all material, labour, T&P, etc. required for proper completion of work as per direction of Engineer-in-Charge.
Brick edging on both side of the road of brick class M-150 8 cm wide and 12 cm deep laid with mud mortar including labour and supply of bricks finished to required template and in proper alignment and also including dressing & ramming the excavated earth as directed by the Engineer in charge of the work including material labour and T&P etc. for proper comletion of work.
GSB :- Construction of Granular Sub - base by providing well graded materials, spreading in uniform layers with motor grader on pre-dressed surface mixing by mix in place method with rotevator at OMC and compacting with smooth wheel roller to achive the desired density, complete as per technical specification of MORD Clause 401.
WBM Grading : II Providing laying,spreading and compaction stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 kn in stages to proper grade and camber, applying and brooming stone screening to fill up the intrestices of coarse aggregate, watering and compacting to the requireddensity Grading II as per MORD Specification clause 405.
WBM Grading : III Providing laying,spreading and compaction stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 kn in stages to proper grade and camber, applying and brooming stone screening to fill up the intrestices of coarse aggregate, watering and compacting to the requireddensity Grading II as per MORD Specification clause 405.
Providing and applying prime coat with bitumen emulsion on the prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70Kg/sqm.
Providing and applying tack coat with bitumen (VG-10)using emulsion distributor at the rate of 0.35 kg per sqm on the prepared bituminous/ granular base surface cleaned with mechanical broom.
Providinglaying and rolling of open -graded premix surfacing of 20mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or out-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying with paver finisher and rolling with a smooth wheeled roller 8-10 kn capacity, finished to required level and grades.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levelgrade and cross fall using Type C seal coat (As per MORD Specified clause 510)
M/S SURESH KUMAR SINGH
SHREE GANGAJI STONE MILLS PRIVATE LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .